Baoshan Road station

Baoshan Road

宝山路
Shanghai Metro
The renovated station building in February 2026
General information
LocationJiaotong Road [zh] and Baoshan Road [zh]
Jing'an District, Shanghai
China
Coordinates31°15′12″N 121°28′17″E / 31.253333°N 121.471389°E / 31.253333; 121.471389
OperatorShanghai No. 3 Metro Operation Co. Ltd.
Lines
Platforms3 (1 island platform and 1 side platform)
Tracks3
Construction
Structure type
Elevated
AccessibleYes
History
Opened
  • 26 December 2000; 25 years ago (2000-12-26)
    (Line 3)
  • 31 December 2005; 20 years ago (2005-12-31)
    (Line 4)
Services
Preceding station Shanghai Metro Following station
Dongbaoxing Road Line 3 Shanghai Railway Station
Hailun Road
Clockwise
Line 4 Shanghai Railway Station
Counter-clockwise
Route map
Up arrow Hailun Road
Left arrow Dongbaoxing Road
Down arrow Shanghai Railway Station
Location
Baoshan Road is located in Shanghai
Baoshan Road
Baoshan Road
Location within Shanghai

Baoshan Road (simplified Chinese: 宝山路; traditional Chinese: 寶山路; pinyin: Bǎoshān Lù) is a station shared between Lines 3 and 4 on the Shanghai Metro. It is located in the former Zhabei District, now part of Jing'an District, and is the northernmost station shared between these lines.

Station layout

3F Platform 1 ←      Line 4 counter-clockwise (Shanghai Railway Station)
Island platform, doors open on the left for Line 4, right for Line 3
Platform 2 ←      Line 3 towards Shanghai South Railway Station (Shanghai Railway Station)
Platform 3      Line 3 towards North Jiangyang Road (Dongbaoxing Road) →
     Line 4 clockwise (Hailun Road) →
Side platform, doors open on the right
2F Concourse Tickets, Service Center
1F Ground level Exits

Entrances/exits

History

The station opened on 26 December 2000, coinciding with the opening of the initial section of Line 3, from Shanghai South Railway Station to Jiangwan Town, and Line 4 service began here on the final day of 2005.

On the evening of 21 January 2016, a fire broke out in a restaurant outside Exit 1 of the station, which was close to the train tracks, but it did not affect the operation of the subway, and only smoke drifted in the station and trains.

There is a plan to solve capacity problems caused by the co-line operation of lines 3 and 4 by carrying out large-scale renovation of the section between this station and Shanghai Railway Station, along with separating the two lines. However, due to poor feasibility, this plan was cancelled in 2015, and the station was instead renovated and expanded.

Renovation and expansion of this station started on 20 July 2023. This include adding a new track on the north side and expanded the platform, set up a new turnout for the outer ring of Line 4 to connect to the downline of Line 3 behind the station on the west side, and removed the existing turnout of the outer ring of Line 4 to connect to the downline of Line 3 in front of the station on the east side. After the renovation, the station became an island-side platform. The renovation project was completed on 22 February 2026.

Surrounding area

References

  1. ↑ "Baoshan Road". Explore Shanghai. Retrieved 3 September 2020.
  2. ↑ 20年迈向世界:珍贵老照片展示上海地铁发展. Eastday (in Chinese). 27 May 2013. Archived from the original on 12 January 2015. Retrieved 14 July 2013.
  3. ↑ 上海市地方志办公室 上海通网站 上海市地情资料库 上海市的百科全书. shtong.gov.cn. Archived from the original on 11 September 2013. Retrieved 13 September 2017.
  4. ↑ 上海市地方志办公室 上海通网站 上海市地情资料库 上海市的百科全书. shtong.gov.cn. Archived from the original on 18 June 2014. Retrieved 13 September 2017.
  5. ↑ 看看新闻 (22 January 2016). "轨交宝山路站外店铺起火 地铁从火里开过去真的大丈夫?_时讯_看看新闻网". 看看新闻. Retrieved 3 April 2026.
  6. ↑ "上海市轨道交通3/4号线宝山路站接轨改造工程环境影响报告书". 上海市建设项目环评信息公开平台 (in Chinese (China)). Archived from the original on 6 September 2022.