Tunnel hole-through

Dismantling the tunnel boring machine 10 days after the hole-through on the Gotthard Base Tunnel in Switzerland.

Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet, and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches, for example:

See also

References


Uses material from the Wikipedia article Tunnel hole-through, released under the CC BY-SA 4.0 license.