| Mass Central Rail Trail—Wayside | |
|---|---|
Mass Central Rail Trail—Wayside roundabout, with diamond monument to Mass Central Railroad, in South Sudbury. October 2026. | |
| Length | 16 miles (26 km) open, 23 miles (37 km) when complete |
| Location | Waltham, Massachusetts to Berlin, Massachusetts |
| Established | 2010 DCR lease for construction signed, 2014 first MCRT—Wayside section built |
| Use | Hiking, bicycling, inline skating, wheelchairs, strollers, cross-country skiing, horseback riding |
| Difficulty | Easy |
| Season | Year-round |
| Surface | Paved, stone dust (to be paved), unimproved |
| Right of way | MBTA owned, former Massachusetts Central Railroad and later Central Mass Branch |
| Maintainer | Department of Conservation and Recreation |
| Website | mass masscentralrailtrail |
| Trail map | |
![]() | |
DCR's Mass Central Rail Trail—Wayside in progress Purple: In Design Green: Complete | |
The Mass Central Rail Trail—Wayside (MCRT—Wayside) is a partially completed, 23-mile (37 km) rail trail in Waltham, Weston, Wayland, Sudbury, Marlborough, Hudson, Stow, Bolton, and Berlin, Massachusetts. The trail is a Department of Conservation and Recreation (DCR) state park along the right-of-way (ROW) of the former Massachusetts Central Railroad and later, former MBTA Central Mass Branch. The MCRT—Wayside currently has 16 miles (26 km) open, and the remaining miles are in design. The MCRT—Wayside is part of the 104-mile (167 km) Mass Central Rail Trail between Boston and Northampton.
All 23 miles (37 km) of the MCRT—Wayside, once built, form a state park owned by the MBTA and maintained by the DCR, except for a 0.75-mile (1.21 km) section owned and maintained by the Town of Hudson, as it is shared with the Assabet River Rail Trail.: 10–11 As of 2026[update], the MCRT—Wayside has 16 miles (26 km) open—representing 71% of the total route—while the remaining 29% is currently in design. All completed sections of the MCRT—Wayside are paved, and DCR plans to pave both all sections under construction and the only section that is currently stone dust in Wayland.: 45 While the MBTA ROW is 50 to 100 feet (15 to 30 m) wide, DCR leased trail sections are 19 feet (5.8 m) wide, known as the "Path Development Corridor", consisting of a paved path, typically 10 or 12 feet (3.0 or 3.7 m) wide, with grass shoulders, grading, and additional side clearance.: 8 : 5 : 11–7, 11–8
| Segment endpoints | Municipality | Length | Surface | Status | Year opened |
|---|---|---|---|---|---|
| Beaver Street to Border Road (Except Linden Street Bridge) | Waltham | 2.75 miles (4.4 km) | Paved | Complete | 2023 |
| ↳ Linden Street Bridge | Waltham | 0.02 miles (0.04 km) | Paved | Complete | 2025 |
| Border Road to Hillside Road | Waltham | 0.3 miles (0.48 km) | Paved | Complete | 2014 |
| Hillside Road to Jones Road | Waltham | 0.5 miles (0.80 km) | Unimproved | In Design | |
| Jones Road to Stony Brook Bridge | Waltham, Weston | 0.3 miles (0.48 km) | Paved | Complete | 2025 |
| Stony Brook Bridge to Cochituate Road | Weston, Wayland | 4.4 miles (7.1 km) | Paved | Complete | 2019 |
| Cochituate Road to Route 20 | Wayland | 0.5 miles (0.80 km) | Stone dust | Complete (paving in design) | 2017 |
| Route 20 to Sudbury substation | Wayland, Sudbury | 1.4 miles (2.3 km) | Unimproved | In Design | |
| Sudbury substation to Wilkins Street | Sudbury, Marlborough, Stow, Hudson | 7.6 miles (12.2 km) | Paved | Complete | 2026 |
| Wilkins Street to Priest Street (Shared with Assabet River Rail Trail) | Hudson | 0.75 miles (1.2 km) | Paved | Complete | 2005 |
| Priest Street to Felton Street | Hudson | 1.0 mile (1.6 km) | Unimproved | In Design | |
| Felton Street to Central Street | Hudson | 1.6 miles (2.6 km) | Unimproved | In Design | |
| Central Street to Coburn Road | Hudson, Bolton, Berlin | 2.3 miles (3.7 km) | Unimproved | In Design |



Mass Central Rail Trail—Wayside | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
As a part of the Mass Central Rail Trail (MCRT) from Boston to Northampton, in design segments of the MCRT will connect to the MCRT—Wayside in both directions. Heading east, after a short unimproved section from Beaver Street to the Belmont border, the Belmont Community Path (BCP) is in design. After the BCP, the MCRT is complete to Boston through many paths and parks, including the Fitchburg Cutoff Path, the Cambridge Linear Park, and the Somerville Community Path. Heading west, the Berlin Rail Trail is in design, as is the MCRT in Clinton, before reaching completed MCRT sections starting with the Wachusett Dam Hike and the MCRT sections built by Wachusett Greenways.
In Hudson, the MCRT—Wayside connects with the Assabet River Rail Trail and the Marlborough-Sudbury State Forest/Goodale Lot hiking trails. In Sudbury, it connects with the Bruce Freeman Rail Trail Phase 2D, at the site of the Sudbury diamond. There are also many connections to hiking trails including the Assabet River National Wildlife Refuge, the City of Marlborough Desert Natural Area, the Town of Sudbury Hop Brook Marsh Conservation Land, and Sudbury Valley Trustees Memorial Forest. In Wayland, a portion of the trail is shared with the Bay Circuit Trail and the East Coast Greenway. In Weston, there are many connections to hiking trails including Jericho Town Forest and Sears Conservation Land. In Waltham, there is a connection to the hiking trails in Prospect Hill Park. The Western Greenway to MCRT connection received a 2023 MassTrails grant for design and permitting.: 11
By 1971, passenger service on the Central Mass Branch west of Waltham, subsidized by the Massachusetts Bay Transportation Authority (MBTA) since 1964, had ended due to low ridership.: 369–370, 373 In 1972, Governor Francis Sargent initiated a Commuter Rail Improvement Program which concluded that, while too early to restore service on the Central Mass Branch, acquisition from the Boston and Maine Railroad (B&M) to preserve the Central Mass Branch ROW and other ROWs would be prudent.: 143 In December 1976, the MBTA purchased from B&M 270 miles (430 km) of ROW across Massachusetts for $39.5 million, although 130 miles (210 km), including the Central Mass Branch, were not in commuter rail service. B&M retained various freight rail service obligations over the ROWs for several more years. By 1977, the MBTA had acquired title ownership of all of these ROWs in fee simple, a portion from the 1976 purchase and a portion by order of taking. By 1980, a permanent discontinuance of the B&M's freight obligations for the Central Mass Branch west of Waltham was approved. The final train on the Central Mass Branch ROW, freight in Waltham between Bacon Street and Clematis Brook, ran in 1994.: 137–138 In 1996, the MBTA produced the "Central Mass. Commuter Rail Feasibility Study", which advised reactivation of the Central Mass Branch between Berlin and Waltham would not be cost effective.: 51 In 1997, a "Central Massachusetts Rail Trail Feasibility Study" was commissioned for $30k by the Massachusetts Turnpike Authority, which found construction of a 25-mile (40 km) trail to be feasible.: vii-viii The proposed trail was quickly renamed the Wayside Rail Trail by the Wayside Rail Trail Committee, a 501(c)(3) nonprofit, as the Wayside Inn / Wayside Inn Railroad Waiting Room was a B&M station at the crossing with Dutton Road. All seven municipalities from Berlin to Belmont (excepting Bolton, Stow, and Marlborough, as their shortest sections were expected to be bundled with their surrounding sections) initially approved the trail by large margins. However, a follow up Weston Special Town meeting voted 698 against and 410 in favor, which derailed progress on the Wayside Rail Trail for at least two decades.: 23–24, 26 In 2006, theft of a section of rail was discovered in Berlin, which encouraged the MBTA to take a more active role maintaining the property. By 2010, the DCR executed a 99-year lease with the MBTA to build what was finally renamed the Mass Central Rail Trail—Wayside, combining the Wayside name with the future vision of the Mass Central Rail Trail from Boston to Northampton. The MCRT—Wayside lease is 23 miles (37 km) from Berlin to Waltham.: 6 Under the terms of the lease with DCR, the MBTA retains the right to reactivate commuter rail.: 4 While this arrangement is similar to federal railbanking law, a request from Sudbury to act as a railbanking trail sponsor was denied by the Surface Transportation Board. Railbanking is a voluntary process, and the MBTA did not consent to it.: 6 In 2014, the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) determined the trail did not require further Massachusetts Environmental Policy Act review, simplifying permitting.: 6

In 1951, the Boston Edison Company (BECo) acquired an easement along this section of the B&M's ROW and built overhead power lines.: 57 In 2016, BECo's successor, Eversource, filed permits to build a gravel access road for the power lines over what had become the MBTA's ROW. This included a trail section running from Cochituate Road in Wayland to slightly west of the Stony Brook Bridge over the MBTA Fitchburg Line in Weston.: 27–28 This reduced construction costs of the trail by about $2 million, and in partnership, the DCR made the decision in January 2017 to build the trail by paving the access road and installing safe road crossings, which completed in 2019.: 28 Eversource approached Weston for cooperation, sparking Weston's decision to participate, reversing the negative 1997 Town vote. Weston assisted construction by forming a Rail Trail Committee and providing recommendations, officially thanked DCR and Eversource for their contributions to the trail, and now supports the completion of the entire MCRT.: 44–45 At Conant Road, the former wooden bridge built in 1937 was demolished and filled with dirt in 1988.: 43–44 With public concern the original design lacked funding for a safe passing of Conant Road,: 44 Weston performed a feasibility study for the underpass in 2017, which was completed in partnership with DCR in 2019.
Based on a 2013 forecast, in 2015 ISO New England issued a Greater Boston area needs assessment, directing utility companies to investigate a series of transmission projects to improve electrical grid reliability, including a connection of the Eversource substation in Sudbury to Hudson Light & Power.: 16–17 Beginning in January 2014, Eversource conducted meetings with federal, state, and municipal officials regarding routing the potential Sudbury to Hudson Transmission Reliability Project.: 70 In September 2014, Sudbury Town Meeting voted in overwhelming support of advancing the MCRT, and in December 2014 voted in overwhelming support to make all reasonable efforts to secure funding for a paved surface MCRT.: 160–161 : 113–115 In January 2015, Sudbury officials noted a Eversource route along the MBTA ROW, either overhead or underground, was an opportunity for construction of the MCRT—Wayside at no cost to the town. With the news of a possibility to build the trail without local funding, Sudbury officials and a May 2015 Town vote decided against local funding efforts to accelerate a proposed trail build with a crushed stone surface first.: 85 : 161 By November 2015, Sudbury and Hudson officials had formally requested Eversource evaluate an underground design for the transmission lines along the MBTA ROW, which Eversource did by February 2016.: 4, 6 By January 2017, the MBTA required this underground route as part of an option agreement with Eversource, at the cost of forgoing approximately $2 million compared to an overhead option. The MBTA also required Eversource to work with DCR to create a trail. In turn, in April 2017, when Eversource sought project approval from the Massachusetts Energy Facilities Siting Board (EFSB), Eversource preferred such an underground MBTA ROW route, though as part of the approval process, Eversource was required to evaluate alternative options. Only the preferred, underground MBTA ROW route was endorsed by the DCR. The underground transmission project benefited DCR by reducing trail construction costs in the range of $6 to $10 million, and required Eversource to make several bridge improvements the trail required.: 160 The Town of Stow Conservation Commission unanimously endorsed the buried transmission project in 2017, in part because it would help build the MCRT.: 162 The preferred underground MBTA ROW route was approved by the EFSB in 2019. The EFSB decision noted the associated benefits of the trail, but stated the EFSB's approval of the transmission project was independent of the trail benefits.: 163–164 Designed and permitted in partnership with the DCR, the Eversource project built a gravel sub-base for the trail and grass shoulders, restored or rebuilt three trail bridges, and built a trail tunnel under Chestnut Street in Hudson. Restorative work included mechanical removal of 3.5 acres of invasive plants, the installation of over 2000 native woody plants, and existing vernal pool enhancements. Eversource originally expected to complete the buried power project in December 2019, however the start of construction was pushed to October 2022 and completed in November 2024, due to an unexpectedly lengthy permitting process. DCR acquired American Rescue Plan Act funding for construction, which began in February 2025 and paved the trail surface. DCR completed the trail segment in 2025, which included the restoration of selected historical railroad features. Additional roadway crossing improvements pushed the official opening to July 2026.
From 2017 to 2022, many lawsuits and petitions were filed by the Town of Sudbury and various abutters alleging the overlapping and jointly permitted construction suffered from varied legal defects, including allegations that the MBTA-DCR trail easement was unlawful and void.: 1 : 4, 6 However, in every ruling, all judges determined all plaintiffs could not succeed with any claim. In 2022 and 2023, abutters sued the MBTA in Massachusetts Land Court twice alleging property rights over the MBTA's Central Mass Branch property in furtherance of such allegations, but withdrew both cases before a judicial ruling.: 6 In 2024, Hudson Town meeting voters rejected four citizen petitions to sell or lease the MBTA's Central Mass Branch property. The Hudson Finance Committee stated this was an attempt to bring the town into "unnecessary and costly" conflict with the MBTA regarding the ownership of the parcel.: 3, 27–28 : 3 While the Towns of Sudbury and Hudson initially opposed construction of the trail at least as jointly permitted with the power reliability project, by 2025 both Town governments had officially endorsed the Sudbury-Hudson trail, and lobbied for the completion of the entire 104-mile (167 km) MCRT.
In Hudson, a 0.75-mile (1.21 km) section of the MCRT—Wayside is shared with the Assabet River Rail Trail along the former Marlborough Branch of the Fitchburg Railroad.: 10–11 Like this trail section, the predecessor railroads also shared this ROW, as some B&M Central Mass passenger trains were run via the Marlborough Branch starting in 1902. This was reduced to Hudson station in 1958, and while subsidized by the MBTA starting in 1964, the final passenger train on the Marlborough Branch ran in 1965.: 369–370 : 161 The MBTA's 1976/1977 purchase/acquisition of various ROWs included the Marlborough Branch along with the Central Mass Branch.: 375–376 B&M ran the final freight train to Hudson on the Marlborough Branch in 1980.: 137