Baseline station

Baseline
General information
Other namesAlgonquin station (O-Train)
LocationOttawa, Ontario
Canada
Coordinates45°20′51″N 75°45′39″W / 45.34750°N 75.76083°W / 45.34750; -75.76083
OwnerOC Transpo
Construction
Structure type
At-grade (Transitway station)
Underground (LRT station)
History
Opened1984 (original station)
October 1, 2009 (temporary location)
2027 (O-Train)
Services
Preceding station OC Transpo Following station
Fallowfield
toward Limebank
Route 74 Iris
Fallowfield
toward Cambrian
Route 75
Future services
Preceding station OC Transpo Following station
Terminus Line 1
Opens 2027
Iris
toward Trim
Location

Baseline station (Transitway) or Algonquin station (O-Train) is a public transit station directly across from the main campus of Algonquin College in Ottawa's west end, near the intersection of Woodroffe Avenue and Baseline Road. Several residential and business areas such as Centrepointe and College Square are also served by this station.

It is also a major transfer point for communities in the inner southwest part of Ottawa, making it one of the busiest stations. A small park and ride is also located here, which was the terminus for route 95 for many years until it was extended to Barrhaven. After this station, Route 74 and 75 buses leave the Transitway to travel on reserved bus lanes on Woodroffe Avenue, and re-enter the Transitway at the Nepean Sportsplex. Baseline station was the first station to be constructed in 1983 when the Transitway was undergoing initial construction.

Expansion

[needs update]

The original Baseline station, prior to moving

Baseline station has undergone a series of renovations, as part of the expansion of the Southwest Transitway, expansion of Algonquin College and future proofing for the expansion of O-Train Line 1. The current station involved the construction of a temporary station west of the original station, making room for the new Algonquin Centre for Construction Excellence (ACCE). The ultimate concept for the updated BRT station loop south of the LRT station will allow passengers to transfer from buses when the Line 1 extension is completed in 2027.

Phase 1A (May 2009 – August 2011)

LRT construction to the left and ACCE under construction to the right (2010)

Phase 1B (April 2010 – November 2010)

Phase 2 (2011–2013)

Light rail expansion and integration (2019–2027)

Service

The following routes currently serve Baseline station as of April 27, 2025:

O-Train
 E1  Shuttle Express
 R1   R2   R4  O-Train replacement bus routes
 N75  Night routes
 40   12  Frequent routes
 99   162  Local routes
 275  Connexion routes
 303  Shopper routes
 405  Event routes
 646  School routes
 STO  Société de transport de l'Outaouais routes
Additional info:
Baseline station service
North O-Train Under construction (opening in 2027)
Frequent routes

 68   74   75   87   88   111 

Local routes 53   73   82   84   112   116   117   187 
Connexion routes 275   277   279 
Shopper routes 305 
Event routes 406   456 
School routes 83   111   187   646   686   688 

Notes

References

  1. ↑ "Baseline" (PDF). Station Layout. OC Transpo. September 2015. Retrieved 1 March 2016.
  2. ↑ "Home".
  3. ↑ "City of Ottawa - Southwest Transitway Extension (Baseline Rd. To Norice St.)". Archived from the original on 2010-08-16. Retrieved 2010-07-02.>
  4. ↑ Environmental Assessment Study for a Line 1 Extension to Barrhaven
  5. ↑ Stage 3 LRT expansion plans
  6. ↑ "Baseline | OC Transpo". www.octranspo.com. Retrieved 2023-10-26.