Blue Ghost Mission 1

Blue Ghost Mission 1
View from Blue Ghost M1 on the Moon
Names
Mission typeLunar landing
OperatorFirefly Aerospace
COSPAR ID2025-010A Edit this at Wikidata
SATCAT no.62716Edit this on Wikidata
Mission duration2 months and 1 day
Spacecraft properties
Spacecraft typeBlue Ghost
ManufacturerFirefly Aerospace
Launch mass1,517 kg (3,344 lb)
BOL mass1,469 kg (3,239 lb)
Dry mass469 kg (1,034 lb)
DimensionsHeight: 2 m (6 ft 7 in)
Width: 3.5 m (11 ft)
Power400 watts
Start of mission
Launch dateJanuary 15, 2025, 1:11:39 am EST (06:11:39 UTC)
RocketFalcon 9 Block 5 (B1085‑5), Flight 425
Launch siteKennedy, LC-39A
ContractorSpaceX
End of mission
Last contactMarch 16, 2025, 23:25 UTC
Lunar lander
Landing dateMarch 2, 2025, 08:34 UTC
Landing siteMare Crisium near Mons Latreille
18°34′N 61°49′E / 18.56°N 61.81°E / 18.56; 61.81

Mission insignia

Blue Ghost Mission 1 was a robotic Moon landing mission conducted by Firefly Aerospace (Firefly). The spacecraft soft-landed on the lunar surface on March 2, 2025, making Firefly the first commercial company to complete a fully successful soft landing on the Moon. As part of NASA's Commercial Lunar Payload Services program, the mission delivered ten scientific and technological experiments to advance future human exploration under the Artemis program. About 5 hours after lunar sunset on March 16, 2025, the solar-powered lander's batteries depleted and communications were lost. The mission's end was officially declared at 23:25 UTC.

The Blue Ghost lunar lander was launched from Kennedy Space Center on January 15, 2025, using a SpaceX Falcon 9 Block 5 rocket that also carried the Hakuto-R Mission 2 lander. At 08:34 UTC on March 2, 2025, it delivered 10 payloads to the lunar surface within Mare Crisium, a 500-kilometer-wide (310 mi) lunar basin. Its 60-day mission aimed to analyze lunar regolith, study geophysical characteristics, and investigate interactions between the solar wind and Earth's magnetic field. The lander's scientific payloads included a regolith adherence characterization experiment, a lunar retroreflector for precision distance measurements, a radiation-tolerant computer, thermal exploration probes, and more.

All 10 NASA payloads (including GNSS tracking, heliospheric X-ray imaging, magnetotelluric sounder, and a radiation‑tolerant computer) powered on, collected data, and transmitted over 110 GB back to Earth.

Mission

Falcon 9 rocket at Kennedy Space Center shortly before the launch of Blue Ghost Mission 1 and Hakuto-R Mission 2

On February 4, 2021, NASA awarded Firefly a US$93.3 million contract to deliver ten science investigations and technology demonstrations to the Moon in 2023. The award was part of NASA's Commercial Lunar Payload Services (CLPS), a contract vehicle used to pay companies to quickly land science and technology payloads on the lunar surface as part of the Artemis program.

On May 20, 2021, Firefly announced its selection of SpaceX's Falcon 9 Block 5 as the launch vehicle for the inaugural Blue Ghost lunar lander mission. This decision was made due to the Falcon 9's performance and payload capacity, which Firefly's Alpha rocket could not provide. The company indicated that its future Eclipse vehicle (then named "Firefly Beta") would be used in subsequent Blue Ghost missions.

Development milestones for the Blue Ghost lander progressed over the following years. On April 26, 2022, Firefly completed the Integration Readiness Review for the lander, with a tentative launch date set for 2024. In November 2023, Firefly refined the schedule, specifying a launch window between the third and fourth quarters of 2024.

By May 2024, the Nammo UK LEROS 4-ET engines for Blue Ghost were completed, and their integration into the lander was confirmed in June. Firefly announced that preparations were proceeding as planned, with the company reaffirming a Q4 2024 launch target in July. Environmental testing of the lander commenced in August at NASA's Jet Propulsion Laboratory (JPL), ensuring the spacecraft's readiness for flight.

In November 2024, Firefly announced that the Blue Ghost lander was fully prepared for launch, setting a mid-January 2025 launch date. Payload encapsulation was completed on January 10, marking one of the final steps in the pre-launch sequence. On January 15, 2025, the Blue Ghost lander successfully launched from Kennedy Space Center Launch Complex 39A at 06:11:39 UTC (1:11:39 a.m.EST, local time at the launch site) aboard a SpaceX Falcon 9 Block 5 rocket. The mission also included Hakuto-R Mission 2 as a co-manifested payload, and the Falcon 9 rocket, which carried both spacecraft, later collided with the Moon a year after.

The spacecraft orbited Earth for 25 days, before performing a trans-lunar injection maneuver, followed four days later by a lunar orbit insertion burn to capture the spacecraft into lunar orbit. After a further 16 days in lunar orbit, on March 2, 2025, at 2:34 a.m. CST, the spacecraft performed a powered descent and successfully landed on the lunar surface northwest of Mons Latreille. Firefly thus became the first commercial company to execute a fully successful soft-landing of a spacecraft on the Moon. Three solar panels powered the lander's research instruments and Spacecraft bus during that time.

Hardware

Blue Ghost featured in-house manufactured composite decks, struts, landing legs, and footpads. Its thermal control system used a combination of heaters, temperature sensors, and multi-layer insulation. The onboard avionics and batteries were designed and built by Firefly, while the solar panels from subcontractor SolAero By Rocket Lab provide a maximum of 400 watts of power. ASI by Rocket Lab provided ground and flight software, trajectory design, orbit determination, and software testbed integration. Blue Ghost featured a Nammo LEROS-4 main engine, eight smaller Firefly Spectre biprop thrusters, and four sets of Firefly cold-gas attitude control system thrusters. The spacecraft featured both S band and X band radios and communicated with Swedish Space Corporation ground stations over the course of the mission. Two Firefly gimbals provided pointing for the X-band antenna, LuGRE antenna, LEXI telescope, and NGLR retroreflector. Firefly also performed vehicle integration in its Cedar Park, Texas cleanroom facility and, following integration, at the Jet Propulsion Laboratory thermal vacuum chamber.

Firefly asserts that its in-house end-to-end manufacturing and testing of the Blue Ghost structure is a differentiator among the CLPS landers.

Payloads

Location of Mare Crisium on the Moon, highlighted in red
Regolith Adherence Characterization (RAC) payload

The mission landed at Mare Crisium, a 500-kilometer-wide (310 mi) basin visible from Earth. The lander's scientific instruments collected data on the properties of the Moon's regolith—its loose, fragmented rock and soil—as well as its geophysical characteristics and the interactions between the solar wind and Earth's magnetic field. These findings will contribute to the preparation and planning of future human missions to the lunar surface.

The payloads, collectively totaling about 94 kilograms (207 lb) in mass, include:

See also

References

  1. 1 2 3 4 5 "Blue Ghost Component Graphic". Firefly Aerospace. January 14, 2025. Archived from the original on January 15, 2025.
  2. ↑ "Blue Ghost Mission 1 (Firefly)". nssdc.gsfc.nasa.gov. NASA. Retrieved March 2, 2025.
  3. ↑ "Blue Ghost Mission 1". Firefly Aerospace. Retrieved March 4, 2025.
  4. ↑ "APOD: 2025 March 3 – Blue Ghost on the Moon". apod.nasa.gov. Archived from the original on March 8, 2025. Retrieved March 4, 2025.
  5. ↑ "NASA Science Continues After Firefly's First Moon Mission Concludes - NASA". Retrieved August 4, 2025.
  6. ↑ Tingley, Brett (January 7, 2025). "SpaceX launch of private Blue Ghost moon lander set for January 15". Space.com. Retrieved January 9, 2025.
  7. ↑ Foust, Jeff (May 20, 2021). "Firefly selects SpaceX to launch its lunar lander". SpaceNews. Retrieved May 22, 2021.
  8. ↑ Firefly Aerospace [@firefly_space] (May 20, 2021). "Alpha rocket does not have the performance or payload volume needed to launch Blue Ghost – F9 does. Our future Beta launch vehicle will support Blue Ghost launch" (Tweet). Retrieved May 20, 2021 – via Twitter.
  9. ↑ "Firefly Aerospace Completes Blue Ghost Lunar Lander Structure Ahead of Moon Landing for NASA". fireflyspace.com. October 4, 2023.
  10. ↑ Parsonson, Andrew (April 29, 2024). "Nammo UK Prepares to Deliver Engine for US Lunar Lander". European Spaceflight. Retrieved May 4, 2024.
  11. ↑ "One step closer to launch and landing as our Firefly team installed Blue Ghost's main engine". x.com.
  12. ↑ @Firefly_Space (July 30, 2024). "We're going to the Moon! As Blue Ghost gets ready to ship for final environmental testing, get a behind-the-scenes look of how we got here and the mission ahead. Stay tuned for more on Blue Ghost Mission 1 in the coming months ahead of the Q4 2024 launch" (Tweet). Retrieved October 2, 2024 – via X (formerly Twitter).
  13. ↑ Foust, Jeff (August 26, 2024). "Firefly Aerospace's lunar lander begins pre-launch environmental tests". SpaceNews. Retrieved August 27, 2024.
  14. ↑ "Firefly Aerospace Blue Ghost Mission 1 to the Moon Readies for Launch". Firefly Aerospace. November 25, 2024. Retrieved November 30, 2024.
  15. ↑ @Firefly_Space (January 7, 2025). "Buckle up! Our road trip to the Moon is set to launch at 1:11 a.m. EST on Wednesday, Jan. 15" (Tweet) – via X (formerly Twitter).
  16. ↑ Schnautz, Risa (January 10, 2025). "Blue Ghost Mission 1: Live Updates". Firefly Aerospace. Retrieved January 14, 2025.
  17. ↑ Wattles, Jackie; Strickland, Ashley (August 18, 2026). "New images reveal the impact site of SpaceX rocket's moon collision". CNN. CNN.
  18. ↑ Schnautz, Risa (March 1, 2025). "Blue Ghost Mission 1: Live Updates". Firefly Aerospace. Retrieved March 2, 2025.
  19. ↑ "Firefly's Blue Ghost lander successfully touches down on the moon". CNN. March 2, 2025. Retrieved March 2, 2025.
  20. ↑ "Firefly Aerospace Becomes First Commercial Company to Successfully Land on the Moon". fireflyspace.com. March 3, 2025.
  21. ↑ Chang, Kenneth (March 2, 2025). "Firefly's Blue Ghost Mission 1 Successfully Lands on the Moon". The New York Times. ISSN 0362-4331. Retrieved March 4, 2025.
  22. ↑ Roulette, Joey (March 3, 2025). "US firm Firefly scores its first moon landing with Blue Ghost spacecraft". Reuters. Retrieved March 4, 2025.
  23. ↑ "Firefly Aerospace Completes Blue Ghost Lunar Lander Structure Ahead of Moon Landing for NASA". prnewswire.com (Press release). Retrieved May 13, 2024.
  24. ↑ "Firefly Aerospace's Blue Ghost Lunar Lander is Assembled". compositesmanufacturingmagazine.com. October 16, 2023.
  25. ↑ "NASA Selects Firefly Aerospace for Artemis Commercial Moon Delivery in 2023" (Press release). NASA. February 4, 2021. Archived from the original on February 4, 2021. Retrieved March 5, 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  26. ↑ Colarossi, Jessica; Hahn, Devin (August 8, 2025). "The Moon Landing that Made Boston University History". Bostonia. Retrieved August 26, 2025.
  27. ↑ Billings, Lee. "Blue Ghost, a Private U.S. Spacecraft, Sticks Its Lunar Landing". Scientific American. Retrieved March 2, 2025.
  28. ↑ Parker, Joel J. K.; Dovis, Fabio; Konitzer, Lauren; Esantsi, Nathan; Ashman, Benjamin; Minetto, Alex; Nardin, Andrea; Vouch, Oliviero; Zocca, Simone; Bernardi, Fabio; Boschiero, Matilde; Fantinato, Samuele; Miotti, Efer; Facchinetti, Claudia; Mario Musmeci (March 26, 2026). "GNSS Reception at the Moon: First Results of the Lunar GNSS Receiver Experiment (LuGRE)". NAVIGATION: Journal of the Institute of Navigation. 73 (1). doi:10.33012/navi.756. hdl:11583/3011793. ISSN 0028-1522.
  29. ↑ "LuGRE: The Lunar GNSS Receiver Experiment" (PDF). NASA Technical Reports Server (NTRS). 2022. Retrieved March 6, 2025.