View from Blue Ghost M1 on the Moon | |
| Names |
|
|---|---|
| Mission type | Lunar landing |
| Operator | Firefly Aerospace |
| COSPAR ID | 2025-010A |
| SATCAT no. | 62716 |
| Mission duration | 2 months and 1 day |
| Spacecraft properties | |
| Spacecraft type | Blue Ghost |
| Manufacturer | Firefly Aerospace |
| Launch mass | 1,517 kg (3,344 lb) |
| BOL mass | 1,469 kg (3,239 lb) |
| Dry mass | 469 kg (1,034 lb) |
| Dimensions | Height: 2 m (6 ft 7 in) Width: 3.5 m (11 ft) |
| Power | 400 watts |
| Start of mission | |
| Launch date | January 15, 2025, 1:11:39 am EST (06:11:39 UTC) |
| Rocket | Falcon 9 Block 5 (B1085‑5), Flight 425 |
| Launch site | Kennedy, LC-39A |
| Contractor | SpaceX |
| End of mission | |
| Last contact | March 16, 2025, 23:25 UTC |
| Lunar lander | |
| Landing date | March 2, 2025, 08:34 UTC |
| Landing site | Mare Crisium near Mons Latreille 18°34′N 61°49′E / 18.56°N 61.81°E |
Mission insignia | |
Blue Ghost Mission 1 was a robotic Moon landing mission conducted by Firefly Aerospace (Firefly). The spacecraft soft-landed on the lunar surface on March 2, 2025, making Firefly the first commercial company to complete a fully successful soft landing on the Moon. As part of NASA's Commercial Lunar Payload Services program, the mission delivered ten scientific and technological experiments to advance future human exploration under the Artemis program. About 5 hours after lunar sunset on March 16, 2025, the solar-powered lander's batteries depleted and communications were lost. The mission's end was officially declared at 23:25 UTC.
The Blue Ghost lunar lander was launched from Kennedy Space Center on January 15, 2025, using a SpaceX Falcon 9 Block 5 rocket that also carried the Hakuto-R Mission 2 lander. At 08:34 UTC on March 2, 2025, it delivered 10 payloads to the lunar surface within Mare Crisium, a 500-kilometer-wide (310 mi) lunar basin. Its 60-day mission aimed to analyze lunar regolith, study geophysical characteristics, and investigate interactions between the solar wind and Earth's magnetic field. The lander's scientific payloads included a regolith adherence characterization experiment, a lunar retroreflector for precision distance measurements, a radiation-tolerant computer, thermal exploration probes, and more.
All 10 NASA payloads (including GNSS tracking, heliospheric X-ray imaging, magnetotelluric sounder, and a radiation‑tolerant computer) powered on, collected data, and transmitted over 110 GB back to Earth.

On February 4, 2021, NASA awarded Firefly a US$93.3 million contract to deliver ten science investigations and technology demonstrations to the Moon in 2023. The award was part of NASA's Commercial Lunar Payload Services (CLPS), a contract vehicle used to pay companies to quickly land science and technology payloads on the lunar surface as part of the Artemis program.
On May 20, 2021, Firefly announced its selection of SpaceX's Falcon 9 Block 5 as the launch vehicle for the inaugural Blue Ghost lunar lander mission. This decision was made due to the Falcon 9's performance and payload capacity, which Firefly's Alpha rocket could not provide. The company indicated that its future Eclipse vehicle (then named "Firefly Beta") would be used in subsequent Blue Ghost missions.
Development milestones for the Blue Ghost lander progressed over the following years. On April 26, 2022, Firefly completed the Integration Readiness Review for the lander, with a tentative launch date set for 2024. In November 2023, Firefly refined the schedule, specifying a launch window between the third and fourth quarters of 2024.
By May 2024, the Nammo UK LEROS 4-ET engines for Blue Ghost were completed, and their integration into the lander was confirmed in June. Firefly announced that preparations were proceeding as planned, with the company reaffirming a Q4 2024 launch target in July. Environmental testing of the lander commenced in August at NASA's Jet Propulsion Laboratory (JPL), ensuring the spacecraft's readiness for flight.
In November 2024, Firefly announced that the Blue Ghost lander was fully prepared for launch, setting a mid-January 2025 launch date. Payload encapsulation was completed on January 10, marking one of the final steps in the pre-launch sequence. On January 15, 2025, the Blue Ghost lander successfully launched from Kennedy Space Center Launch Complex 39A at 06:11:39 UTC (1:11:39 a.m.EST, local time at the launch site) aboard a SpaceX Falcon 9 Block 5 rocket. The mission also included Hakuto-R Mission 2 as a co-manifested payload, and the Falcon 9 rocket, which carried both spacecraft, later collided with the Moon a year after.
The spacecraft orbited Earth for 25 days, before performing a trans-lunar injection maneuver, followed four days later by a lunar orbit insertion burn to capture the spacecraft into lunar orbit. After a further 16 days in lunar orbit, on March 2, 2025, at 2:34 a.m. CST, the spacecraft performed a powered descent and successfully landed on the lunar surface northwest of Mons Latreille. Firefly thus became the first commercial company to execute a fully successful soft-landing of a spacecraft on the Moon. Three solar panels powered the lander's research instruments and Spacecraft bus during that time.
Blue Ghost featured in-house manufactured composite decks, struts, landing legs, and footpads. Its thermal control system used a combination of heaters, temperature sensors, and multi-layer insulation. The onboard avionics and batteries were designed and built by Firefly, while the solar panels from subcontractor SolAero By Rocket Lab provide a maximum of 400 watts of power. ASI by Rocket Lab provided ground and flight software, trajectory design, orbit determination, and software testbed integration. Blue Ghost featured a Nammo LEROS-4 main engine, eight smaller Firefly Spectre biprop thrusters, and four sets of Firefly cold-gas attitude control system thrusters. The spacecraft featured both S band and X band radios and communicated with Swedish Space Corporation ground stations over the course of the mission. Two Firefly gimbals provided pointing for the X-band antenna, LuGRE antenna, LEXI telescope, and NGLR retroreflector. Firefly also performed vehicle integration in its Cedar Park, Texas cleanroom facility and, following integration, at the Jet Propulsion Laboratory thermal vacuum chamber.
Firefly asserts that its in-house end-to-end manufacturing and testing of the Blue Ghost structure is a differentiator among the CLPS landers.


The mission landed at Mare Crisium, a 500-kilometer-wide (310 mi) basin visible from Earth. The lander's scientific instruments collected data on the properties of the Moon's regolith—its loose, fragmented rock and soil—as well as its geophysical characteristics and the interactions between the solar wind and Earth's magnetic field. These findings will contribute to the preparation and planning of future human missions to the lunar surface.
The payloads, collectively totaling about 94 kilograms (207 lb) in mass, include: