| Capella Tower | |
|---|---|
Capella Tower seen from the ground | |
![]() | |
| Former names |
|
Alternative names | 225 South Sixth |
General information | |
| Status | Completed |
| Location | 225 6th Street S. Minneapolis, Minnesota, US |
| Coordinates | 44°58′35″N 93°16′07″W / 44.9763°N 93.2686°W |
Construction started | 1989 |
Completed | 1992 |
| Operator | Shorenstein Realty Services |
| Height | |
| Roof | 775 ft (236 m) |
| Technical details | |
| Floor count | 56 (53 occupied) |
| Floor area | 1,499,994 ft2 (139,354.0 m2) |
| Design and construction | |
| Architects | James Ingo Freed Pei Cobb Freed & Partners |
| Developer | Joint Venture of IBM Corporation and The OPUS Corporation |
Structural engineer | CBM Engineers Inc. Cosentini Associates |
| Website | |
| www | |
Capella Tower (also 225 South Sixth) is an office skyscraper in Minneapolis, Minnesota, United States. The building opened in 1992 as First Bank Place, replacing One Financial Plaza as the headquarters for First Bank System. In 1997, First Bank System acquired US Bancorp and changed the name of the building to US Bancorp Place. The headquarters of US Bancorp moved into the US Bancorp Center in 2000, whereupon the tower changed to 225 South 6th Street. In March 2009, the building took its present name.
Capella Tower is connected to the Minneapolis Skyway System and has 1.4 million square feet (130,000 m2). of office space.
Capella Tower was originally announced in October 1989. The complex was unveiled as two towers, one 53-story tall building belonging to First Bank System, and a smaller, 18-story tall building for IBM to be known as First Bank Place. The building would become the headquarters of First Bank System and regional offices for IBM's Minnesota and North Dakota operations. Designed by New York-based firm I.M. Pei, it was the group's first skyscraper in the Twin Cities area. The original design was noted for having a 14-story cylinder tying the complex together.
Additionally, First Bank Place was intentionally designed to be exactly one foot shorter than IDS Center, the tallest building in Minneapolis. Construction for First Bank Place began in August 1989. A five-story glass atrium was added to the side of the IBM part of the complex, bringing the size of the building to 1,400,000 square feet (130,000 m2). By July 1991, the building was 66% leased. Construction was officially completed in 1992 and the building officially opened later that year. In 1997, First Bank System acquired the Oregon-based U.S. Bancorp and re-branded under the name. Following this, First Bank Place was re-branded to US Bancorp Place. In 2000, U.S. Bancorp moved its headquarters to the nearby U.S. Bancorp Center.
In March 2008, Capella Education Co., longtime occupant of the building and owner of the for-profit online Capella University, signed a lease that changed the name of the tower to Capella Tower. The new lease expands Capella's square footage in the building from 203,000 sq ft (18,900 m2) to about 400,000 sq ft (37,000 m2), making it the largest tenant in the building. The expanded facility houses all of the company's 1,150 downtown Minneapolis employees; as the online school does not have classrooms, the space houses administrative staff and faculty. The name change took place in March 2009.

The office building, designed by Pei, Cobb, Freed & Partners, is laid out on an L-shaped site with the 58-story tower connected to the 20-story Star Tribune Building by an atrium. The building combines six-story cubes and various round towers which echo the different styles of buildings in downtown Minneapolis. The illuminated semicircle located atop the tower is not only decorative but also houses an antenna farm and communications network. This feature has given the building the nickname the "Halo Building".
First Bank Place officially opens with a grand celebration tonight. The 53-story skyscraper complex on 3rd Av. between 6th and 7th Sts., designed by architect James Freed of Pei, Cobb, Freed & Partners of New York, has been part of the downtown Minneapolis skyline for two years but the interior was just finished this month. The taller of its towers, on 6th St., has been occupied by First Bank System.
First Bank System closed on its acquisition of Portland, Ore.-based U.S. Bancorp. Friday and changed its name to U.S. Bancorp. The new combined company will be headquartered in Minneapolis. The deal creates a robust financial institution operating in 17 states with $72 billion in assets and a market capitalization of $22 billion. It becomes the 14th-largest bank holding company in the country based on assets, and the 10th-largest based on market capitalization. Effective Monday, the ticker symbol will change to USB and the stock will trade on the New York Stock Exchange. "While this is a defining moment in the history of First Bank System as a bank holding company, it will be business as usual for customers at all our bank branches for the immediate future," said John F. Grundhofer, who will serve as president and chief executive officer of the new U.S. Bancorp.