Huntington Bank Pavilion

The Pavilion at Northerly Island
The Pavilion at Northerly Island
The Venue with a View
Overhead shot of the venue and surrounding Museum Campus
Interactive map of The Pavilion at Northerly Island
Former namesLakefront Pavilion (planning/construction)
Charter One Pavilion (2005–13)
FirstMerit Bank Pavilion (2013–17)
Huntington Bank Pavilion (2017-2026)
Address1300 S Lynn White Dr
Chicago, Illinois 60605
Chicago
United States
LocationNortherly Island
Coordinates41°51′48″N 87°36′31″W / 41.86342°N 87.6085°W / 41.86342; -87.6085
OwnerChicago Park District
OperatorLive Nation
Seating type
Reserved, Lawn
Capacityup to 30,000 (current)
8,166 (2005–12)
TypeOutdoor amphitheater
Public transit Red Orange Green
at Roosevelt
Construction
GroundbreakingDecember 2004
OpenedJune 24, 2005 (2005-06-24)
ExpandedJune 2013
Cost$1.7 million (initial construction)
$3 million (2013 expansion)
Website
www.thepavilionatnortherlyisland.com

The Pavilion at Northerly Island is an outdoor amphitheater located on Northerly Island in Chicago, Illinois. The venue is a temporary structure, with the summer concert season running from May or June until September or October. The amphitheater, which opened in June 2005, was originally called the Lakefront Pavilion during its planning and construction. The name was changed to Charter One Pavilion in 2005; FirstMerit Bank Pavilion in 2013; then to Huntington Bank Pavilion in 2017, and then to "The Pavilion at Northerly Island" in 2026.[citation needed ] The venue is owned by the Chicago Park District and operated by the large venue operating company Live Nation.

Promoted as the "venue with a view", the amphitheater has views of Lake Michigan, Burnham Harbor, Soldier Field, and the Chicago skyline.

History

The venue lies on the former site of the Meigs Field airport. On March 30, 2003, Mayor Richard M. Daley secretly ordered a midnight demolition of the airfield, and his demolition crew destroyed the main runway by excavating six large X's through it. Daley justified the action by saying the continued operation of the airfield was a threat to Chicago's cityscape, using the events of 9/11 as a reference. The airfield had been planned to continue operation until 2011 and then to be turned over to the city of Chicago. No one in the state or city government had been consulted about the demolition besides Daley. In a negotiated settlement deal, the Federal Aviation Administration fined the city $33,000 for closing the airport without a required 30-day notice, and required repayment of a million dollars of federal airport improvement funds that had been diverted to pay for demolishing the airport rather than improving it.

In August 2003, construction crews were sent in to continue demolition of the airfield. Originally, the space had been planned to become an aviation museum. Daley rejected the plan and said the space should instead become a lakefront park and nature reserve. The result was the creation of the 91-acre (37 ha) Northerly Island park, and over 4 acres (1.6 ha) were set aside for the forthcoming music venue.

Initially constructed music venue

With the new advent of the nature reserve to replace Meigs Field, the Chicago Park District proposed an outdoor music venue, similar to the Ravinia Pavilion. Construction began in December 2004. Since the venue would be located on the nature reserve, the structure was designed to be temporarily erected in June and disassembled in September of each year. The venue was designed by Mark Dewalt of Valerio Dewalt Train Associates; costing $1.7 million to construct. The amphitheater features a 56-by-40-foot (17 m × 12 m) stage and was built with 15-by-20-foot (5 m × 6 m) video screens on either side of the stage. It originally featured three grandstands totaling 3,666 seats and a general admission area totaling 4,500 seats. As of 2013, the Chicago Park District was receiving roughly $250,000 from the venue (through sponsorship deals) and $1 from every ticket sold during concert season. The venue opened June 24, 2005, with a concert by American band Earth, Wind & Fire.

2013 expansion

Entrance of venue, 2007

The Chicago Park District originally sought expansion in 2010, wanting to increase capacity from 8,000 to 14,000 and attract mainstream acts to the venue. However, the city voted against the expansion in 2011. Then in March 2013, the Chicago Plan Commission approved a $3 million plan to expand the venue's capacity from 8,000 to 30,000 seats. This would mean rotating the stage to feature a lawn seating area, increasing the overall space of the venue from 4.78 acres (1.93 ha) to 6.9 acres (2.8 ha). Additionally, two 300-seat[clarification needed] grandstands were added, while the lawn arena can accommodate 22,000. There is a 12-foot (4 m) slope from the front of stage to the rear of lawn, providing the proper elevation change so that the lawn can be used as a park area when not in use by the pavilion. The main entrance was widened to accommodate the capacity expansion. Delay systems for sound were added to the stage and lawn area. The original video screens were replaced by two 14-by-27-foot (4 m × 8 m) LED screens next to the stage and two 11-by-17-foot (3 m × 5 m) LED screens in the lawn area.

Naming

Upon original conception, the venue was known as the Lakefront Pavilion. On June 22, 2005, it was announced Charter One Financial purchased naming rights for five years, for $2.5 million. From 2005 until 2013, the venue was known as the Charter One Pavilion at Northerly Island. With new construction underway, it was revealed the venue was seeking a new sponsorship deal. In June 2013, Ohio-based FirstMerit Corporation purchased a multi-year naming rights agreement. The length of the contract and amount were not disclosed. From June 27, 2013, until January 8, 2017, the venue was known as the FirstMerit Bank Pavilion. Huntington Bank acquired FirstMerit Bank near the end of 2016. On January 9, 2017, the venue name was changed to reflect this. The venue is now sometimes referred to as The Pavilion at Northerly Island.[citation needed ]

See also