Highways in Croatia

Map of the Croatian motorway network in 2025
A6 interchange in Orehovica near Rijeka
Dynamics of the development of the Croatian motorway network: the length of the motorway network in Croatia 1993-2009

Highways in Croatia are the main transport network in Croatia. The Croatian classification includes several categories of highways:

Other than the motorway routes, the national road classification includes the following enumerated categories of routes in the national highway system, with decreasing order of priority:

Road operators differ according to the classification system: The designated motorways are operated by three different concessionaires. The state roads are maintained almost exclusively by Hrvatske ceste, while the county and local roads are managed by various county authorities. The road maintenance agencies are governed by various laws issued by the Parliament as well as bylaws issued by the Ministry of Transport.

Motorways

Autoceste are marked with this sign in Croatia

The primary high-speed motorways are called autoceste (Croatian pronunciation: [ˈautot͡sesta] singular: autocesta), and they are defined as roads with at least three lanes in each direction (including hard shoulder) and a speed limit of not less than 80 kilometres per hour (50 mph). They are marked with a special road sign, similar to the road sign depicting a motorway/autoroute/autobahn in other parts of Europe. The Croatian motorway (autocesta) network is 1,360.5 kilometres (845.4 mi) long.

Motorways in Croatia are defined by the Ministry of Maritime Affairs, Transport and Infrastructure. The same applies to names of the motorway interchanges and rest areas.

History

A major reason for the motorway construction "mania" of the 2000s is a previous political halt of the major Croatian highway project, today's A1, in the 1970s and 1980s under former Yugoslavia. When Croatia declared independence in 1991, the only true motorways in the country were Rijeka–Kikovica (the westernmost part of today's A6), Zagreb–Karlovac (the northernmost part of today's A1) and Zagreb–Slavonski Brod (the central part of today's A3), the latter being part of the Brotherhood and Unity Highway. The dream to connect the two largest Croatian cities Zagreb and Split with a motorway (autocesta) went back to the times of the Croatian Spring, but construction of this project was never realized in the Yugoslav period.

A7 motorway, Croatian motorway network was largely built in the 2000s

In 2005, the Zagreb–Split route was constructed. In addition, the A1 was extended towards Dubrovnik (currently at Ploče), and the A3 was extended so it connects Zagreb to Croatian borders with both Serbia (near Lipovac) and Slovenia (near Bregana). There is also a motorway from Zagreb to Rijeka, the A6, as well as the A4 motorway from Zagreb to the northeast (Hungarian border) as well as the A2 motorway from Zagreb to the northwest (Slovenian border). The A9 between Pula and the Slovenian border is also largely completed.

The construction of additional motorways has noticeably slowed in the 2010s, but it continues. As of 2021, the Cerovlje–Rijeka section of A8, the remaining part of the Istrian Y, is being upgraded from semi-highway status. The other motorways are in various early stages of development, coming up to a total of 11 motorway routes. The A1 is considered unfinished as it is planned to be extended from Ploče to Dubrovnik.

Operators

The network is managed by 3 operators, of which one is under full government control and other two are operated by joint ventures.

Operator Ownership Motorway Length (in 2025) Notes
BINA Istra BINA Fincom (67%)
Bouygues (16%)
Hrvatske autoceste (14.8%)
Istarska autocesta (2.2%)
A8, A9 141.0 km (87.6 mi) Under concession until 2041.
Autocesta Zagreb – Macelj Pyhrn Concession Holding GmbH (51%)
Republic of Croatia (49%)
A2 60.0 km (37.3 mi) Under concession until 2032.
Hrvatske autoceste Republic of Croatia (100%) A1, A3, A4, A5, A6, A7, A10, A11, Krk bridge 1,159.5 km (720.5 mi) A6 and A7 were operated by Autocesta Rijeka – Zagreb until 31 December 2020.

Motorways and sections

List of motorways

Motorway Route Length (in
2025)
Description Notes
A1 Zagreb - Split - Dubrovnik 484.1 km (300.8 mi) The A1 starts in Lučko interchange, a part of Zagreb bypass where the A3 motorway junction is located. The motorway proceeds south from Zagreb to Karlovac and further on to Bosiljevo 2 interchange where the A6 motorway branches off towards Rijeka. The route continues south to Gospić, Zadar, Šibenik, Split. The southernmost sector of the motorway proceeds from Split to Ploče and Metković. Section between Ploče and Dubrovnik is planned
A2 Zagreb - Macelj 62.3 km (38.7 mi) The A2 starts on the border with Slovenia near Macelj. The motorway passes west of Krapina and proceeds south towards Zagreb. The southernmost section of the motorway forms a part of Zagreb bypass and it terminates at Jankomir interchange with the A3 motorway.
A3 Bregana - Zagreb - Lipovac 305.5 km (189.8 mi) The A3 starts on the border of Slovenia near Bregana. The motorway passes north of Samobor and proceeds west towards Zagreb, passing to the south of the city and forming a part of Zagreb bypass, where the route contains junctions with the A2, A1 and A4 motorways. It continues east to Kutina, Slavonski Brod, Sredanci interchange with the A5 motorway and further east to Županja and terminating on the border of Serbia near Lipovac.
A4 Zagreb - Goričan 97.7 km (60.7 mi) The A4 starts on the border of Hungary near Goričan. The motorway passes near Čakovec and Varaždin south towards Zagreb and the southernmost part of the route is a part of Zagreb bypass, where the motorway terminates in Ivanja Reka interchange, where the traffic defaults to the westbound A3 motorway.
A5 Beli Manastir - Osijek - Bosnian border 88.2 km (54.8 mi) The A5 starts on the border of Hungary near Beli Manastir and proceeds south bypassing Osijek and Đakovo, meets the A3 motorway at Zoljani interchange and proceeds south to Svilaj border bridge where it connects on Bosnian A1 motorway.
A6 Rijeka - Bosiljevo 2 81.5 km (50.6 mi) The A6 starts in Bosiljevo 2 interchange, branching off from the A1 motorway and proceeds west bypassing Delnice to Rijeka and the Orehovica interchange with the A7 motorway.
A7 Rupa - Rijeka - Žuta Lokva 49 km (30 mi) The A7 starts at the border of Slovenia and heads south to Rijeka, passes the city as Rijeka bypass. The Rijeka bypass section comprises an interchange with the A6 motorway and proceeds east terminating near Šmrika where the traffic defaults to the D8 state road. Section east of Rijeka is under construction.
A8 Kanfanar - Matulji 65.8 km (40.9 mi) The A8 spans between Kanfanar and Matulji, i.e. the A9 and A7 motorways. As of September 2024, the Kanfanar–Vranja section is brought to the motorway standards, with new tube of Učka tunnel opened and the rest is a limited access two-lane route.
A9 Umag - Pula 76.8 km (47.7 mi) The A9 starts near Umag and the Slovenian border, meets the A8 motorway at Kanfanar interchange, and proceeds south to Pula, forming the western arm of Istrian Y.
A10 Bosnian border - Ploče interchange 8.6 km (5.3 mi) The A10 starts at Bosnian border, where it connects to A1 motorway in Bosnia and runs to the Ploče interchange, where it connects to A1 motorway.
A11 Zagreb - Sisak 41 km (25 mi) The A11 starts at Jakuševec interchange and runs south to Sisak interchange. It was connected to A3 in November 2015 and it is opened to Sisak in October 2024.

Motorway sections under construction

Motorway County Length Section Description Scheduled completion
A7 Primorje-Gorski Kotar 5.2 km (3.2 mi) Križišće–Jadranovo Construction began in October 2026. The project consists of the 2,060-meter-long Križišće Tunnel, two viaducts and two carriageways, and the Jadranovo interchange, along with the reconstruction of the Križišće interchange and the construction of a connecting road to the Adriatic Highway. October 2029
6.5 km (4.0 mi) Novi Vinodolski bypass Construction began in September 2021 and will consist of two lane expressway that will match the left lane of the future motorway. Q4 2027
A8 11 km (6.8 mi) Učka Tunnel–Matulji Construction of additional two lanes started in September 2023. Q1 2027
A9 Istria 2.5 km (1.6 mi) Mirna Bridge Construction of bridge for upgrading motorway on four lanes in total, the construction started in February 2024. End of 2026

Planned motorway sections

Motorway County Length Section Notes
A1 City of Zagreb, Zagreb and Karlovac 38.6 km (24.0 mi) Zagreb–Karlovac Upgrade to six lanes, the start of the works is planned for second half of 2027.
Karlovac 28.2 km (17.5 mi) Karlovac–Bosiljevo 2 Upgrade to six lanes. Start of works after completion of the Zagreb-Karlovac section.
Dubrovnik-Neretva 18.4 km (11.4 mi) Metković–Pelješac As of July 2025, this section was undergoing field investigation works for the purpose of preparing an environmental impact study for the project.
29.5 km (18.3 mi) Rudine–Osojnik (Dubrovnik) The tender for the construction of two parts of this section (9 km and 11.5 km long, resp.) was open in July 2025. The remaining part was undergoing field investigation works for the purpose of preparing an environmental impact study for the project.
4.2 km (2.6 mi) Osojnik–Nova Mokošica border crossing Planning started.
A2 Krapina-Zagorje 3.7 km (2.3 mi) Đurmanec–Macelj The construction of tunnels Sveta Tri Kralja and Brezovica so the section is upgraded to four lane motorway was expected to begin in the fall of 2022.
A3 City of Zagreb 4.5 km (2.8 mi) Jankomir–Lučko Upgrade to six lanes. Construction starts at autumn 2026.
Zagreb and City of Zagreb 20.5 km (12.7 mi) Lučko–Ivanja Reka Upgrade to six lanes. Start of works after completion of the Jankomir-Lučko section.
A7 Primorje-Gorski Kotar 12.3 km (7.6 mi) Jadranovo–Selce Construction work on this section is expected to begin in September 2026, and the completion deadline is 42 months from the contractor's introduction into the work.
6.5 km (4.0 mi) Novi Vinodolski bypass Design started in 2023 and competition for construction will start on the end 2026 completing remaining two lanes that will match the right lane of the motorway.
Primorje-Gorski Kotar and Lika-Senj 21 km (13 mi) Novi Vinodolski–Senj A conceptual design has been developed and the coordination of spatial plans is underway. In parallel, an Environmental Impact Study is being prepared and field research is ongoing.
Lika-Senj 10.8 km (6.7 mi) Senj–Žuta Lokva The preparation of project documentation up to the location permit has been contracted, a conceptual design has been developed, and the Environmental Impact Study is being prepared, and field research is underway.

Traffic cost revenue

In 2025, the network had a traffic of 101,416,327 vehicles, including 89,134,555 light vehicles and 12,281,772 heavy vehicles (difference by axle height).

The travel cost is 0.08 euros per km for light vehicles in closed system and 0.06 euros in open toll system, while for heavy ones are 0.34 euros per km in closed system and 0.21 in open system.

Those costs generate a revenue of 569.5 millions of euros (without VAT) in 2025.

Accidents

Two third of motorway fatalities (67%) occurred in the third of the year between July and October.

2100240027003000330036003900201020132016201920222025Motorways, source HUKA, 2025
Traffic accidents. View chart definition.
15202530354045201020132016201920222025Motorways, source HUKA, 2025
Fatalities. View chart definition.
4567891011201020132016201920222025CroatiaEU 27
Motorways fatalities rate per population. View chart definition.

Expressways

Roads designated exclusively for motor vehicles are marked with this sign in Croatia

There is a wide variety of types of expressways in Croatia, in terms of number of lanes, accessibility and types of intersections comprised. They range from four lane expressways with grade-separated intersections and limited access - distinguished from the motorways by lack of emergency lanes only - to four or six lane urban expressways with numerous at-grade intersections and traffic lights or two lane limited access roads with grade separated intersections. The expressways include both incomplete motorways, built in stages, and some state roads (with either limited access, more than two traffic lanes, grade-separated intersections or any combination thereof). There are even some instances of county roads which may be regarded expressways such as Jadranska Avenue (Ž1040).

As a rule, the expressways are not tolled; however, major tunnels on the expressways are tolled.

List of completed expressways

Number Length Control cities Notes
D1 11.5 km (7.1 mi) Karlovac interchange (A1) - Cerovac Vukmanićki four lane dual carriageway / two lane single carriageway, with at-grade intersections
5.1 km (3.2 mi) Udbina western bypass two lane single carriageway, with grade separated intersections
15 km (9.3 mi) Dugopolje interchange (A1) - Split four lane dual carriageway, with grade separated intersections
D2 13 km (8.1 mi) Osijek southern bypass four lane dual carriageway, with grade separated intersections
D5 4.7 km (2.9 mi) Novi Varoš - Stara Gradiška four lane dual carriageway, with grade separated intersections
D8 11.4 km (7.1 mi) sections through and near Split four lane dual carriageway, with at-grade intersections
32.5 km (20.2 mi) Duboka interchange – Zaton Doli two lane single carriageway, with grade separated intersections
D10 34.9 km (21.7 mi) Sveta Helena interchange (A4) - Križevci four lane dual carriageway, with grade separated intersections
D12 10.6 km (6.6 mi) Vrbovec 2 interchange (D10) - Farkaševac four lane dual carriageway, with grade separated intersections
D14 17.4 km (10.8 mi) Zabok interchange (A2) – Zlatar Bistrica (D29) two lane single carriageway, with grade separated intersections
D33 7 km (4.3 mi) Šibenik interchange (A1) - Šibenik (Vidici interchange) two lane single carriageway, with grade separated intersections
D76 7.5 km (4.7 mi) Zagvozd (Biokovo toll booth) - Baška Voda (D8) two/four lane single carriageway with grade separated intersections
D220 5.4 km (3.4 mi) Bisko interchange (A1) - Čaporice (D60) four lane dual carriageway/two lane single carriageway, with grade separated intersections
D404 4.3 km (2.7 mi) Draga interchange (A7) - Rijeka (Brajdica interchange) three/four lane single carriageway, with grade separated intersections
D424 17.6 km (10.9 mi) Zadar 2 interchange (A1) - Zadar (Gaženica Port) four lane dual carriageway, with grade separated intersections
D425 9.8 km (6.1 mi) Karamatići toll station (A1) - Ploče (Čeveljuša interchange) four lane dual carriageway/two lane single carriageway, with grade separated intersections
D522 13 km (8.1 mi) Gornja Ploča interchange (A1) - Udbina two lane single carriageway, with grade separated intersections

Expressway sections constructed but not opened

Number Length Section Notes Completion
D12 5.1 km (3.2 mi) Farkaševac - Breza two lane single carriageway, with grade separated intersections Construction finished in Summer 2023.
5.6 km (3.5 mi) Špišić Bukovica - Virovitica interchange two lane single carriageway, with grade separated intersections Construction finished in End of 2025. and opening in Mid-2027

Expressway sections under constructions

Number Length Section Notes Scheduled completion
D5 3.7 km (2.3 mi) Okučani interchange (A3) - Novi Varoš four lane dual carriageway, with grade separated intersections October 2026
D8 2.6 km (1.6 mi) Mravince interchange (D1) - TTTS four lane dual carriageway, with grade separated intersections Spring 2027
5.2 km (3.2 mi) TTTS - Gornja Podstrana four lane dual carriageway, with grade separated intersections 2030
D10 7.5 km (4.7 mi) Križevci - Kloštar Vojakovački two lane single carriageway, with grade separated intersections December 2026
D12 11.8 km (7.3 mi) Breza - Bjelovar two lane single carriageway, with grade separated intersections Spring 2026
9.4 km (5.8 mi) Bjelovar - Bulinac two lane single carriageway, with grade separated intersections July 2028
D35 7.5 km (4.7 mi) Varaždin interchange (D2) - Cerje Tužno two lane single carriageway, with at-grade intersections April 2028
D51 14.75 km (9.17 mi) Brestovac Požeški - Godinjak two lane single carriageway, with grade separateds November 2029
1.4 km (0.87 mi) Godinjak - Požega interchange (A3) two lane single carriageway, with grade separateds
D55 9.8 km (6.1 mi) Nuštar - Vukovar two lane single carriageway, with grade separateds 2029

Planned expressway sections

Number Route Length Section Notes
D2 Varaždin - Koprivnice - Virovitica - Osijek - Vinkovci 22 km (14 mi) Ludbreg interchange (A4) - Koprivnice four lane dual carriageway & two lane single carriageway, with grade separated intersections
20 km (12 mi) Koprivnice bypass four lane dual carriageway & two lane single carriageway, with grade separated intersections
33.1 km (20.6 mi) Koprivnice - Pitomača four lane dual carriageway & two lane single carriageway, with grade separated intersections
21.9 km (13.6 mi) Pitomača - Virovitica four lane dual carriageway & two lane single carriageway, with grade separated intersections
9 km (5.6 mi) Virovitica - Suhopolje four lane dual carriageway, with grade separated intersections
23.3 km (14.5 mi) Suhopolje - Slatina four lane dual carriageway & two lane single carriageway, with grade separated intersections
46.2 km (28.7 mi) Slatina - Našice four lane dual carriageway & two lane single carriageway, with grade separated intersections
33.1 km (20.6 mi) Našice - Čepin four lane dual carriageway & two lane single carriageway, with grade separated intersections
39 km (24 mi) Čepin - Nuštar (Vinkovci) four lane dual carriageway & two lane single carriageway, with grade separated intersections
D5 Virovitica - Daruvar - Okučani 52.9 km (32.9 mi) Virovitica - Pakrac two lane single carriageway, with grade separated intersections
12 km (7.5 mi) Pakrac - Lipik two lane single carriageway, with grade separated intersections
20.7 km (12.9 mi) Lipik - Okučani two lane single carriageway, with grade separated intersections
D8 Split - Omiš 8 km (5.0 mi) Gornja Podstrana - Dugi Rat four lane dual carriageway, with grade separated intersections
3 km (1.9 mi) Dugi Rat - Omiš two lane single carriageway, with grade separated intersections
Dubrovnik - Cavtat - Čilipi - Karasovići - border crossing (Montenegro) 7.4 km (4.6 mi) Dubrovnik bypass two lane single carriageway, with grade separated intersections
13.2 km (8.2 mi) Dubrovnik - Cavtat two lane single carriageway, with grade separated intersections
9 km (5.6 mi) Cavtat - Čilipi two lane single carriageway, with grade separated intersections
D10 Križevci - Koprivnice - Gola - border crossing (Hungary) 10.5 km (6.5 mi) Kloštar Vojakovački - Velika Mučna two lane single carriageway, with grade separated intersections
12 km (7.5 mi) Velika Mučna - Koprivnice jug two lane single carriageway, with grade separated intersections
5.4 km (3.4 mi) Koprivnice jug - Koprivnice two lane single carriageway, with grade separated intersections
D12 Bjelovar - Virovitica - Terezino Polje - border crossing (Hungary) 11.2 km (7.0 mi) Bulinac - Velika Pisanica two lane single carriageway, with grade separated intersections
19 km (12 mi) Velika Pisanica - Špišić Bukovica two lane single carriageway, with grade separated intersections
D14 Zlatar Bistrica - Kašina - Soblinec 3.5 km (2.2 mi) Zlatar Bistrica - Marija Bistrica two lane single carriageway, with grade separated intersections
13.8 km (8.6 mi) Marija Bistrica - Kašina two lane single carriageway, with grade separated intersections
6.1 km (3.8 mi) Kašina - Popovec interchange (A4) two lane single carriageway, with grade separated intersections
D33 Šibenik - Drniš - Knin - Strmica - border crossing (Bosnia and Herzegovina) 19.1 km (11.9 mi) Tromilja (Šibenik northeast) - Drniš four lane dual carriageway & two lane single carriageway, with grade separated intersections)
1.1 km (0.68 mi) Drniš bypass four lane dual carriageway & two lane single carriageway, with grade separated intersections)
26.8 km (16.7 mi) Drniš - Knin four lane dual carriageway & two lane single carriageway, with grade separated intersections)
D35 Varaždin - Ivanec - Krapina 6.9 km (4.3 mi) Cerje Tužno - Ivanec four lane dual carriageway & two lane single carriageway, with grade separated intersections
7.5 km (4.7 mi) Ivanec - Lepoglava four lane dual carriageway & two lane single carriageway, with grade separated intersections
D55 Vinkovci - Županja - border crossing (Bosnia and Herzegovina) 21 km (13 mi) Županja 2 interchange (A3) - Vinkovci four lane dual carriageway, with grade separated intersections

State roads

State roads are defined by legislation as important routes for road traffic between various parts of the country. Classification of a road as a state road does not describe actual conditions of the road itself.

State roads in Croatia are assigned one, two or three digit numbers which generally comply with the following pattern (although there are some exceptions to the rules):

At the moment the state roads in Croatia have a combined length of 6,867.7 kilometres (4,267.4 mi).

D1 - D9

Number Control cities (or other appropriate route description) Length
D1 Gornji Macelj (A2) - Krapina - Zagreb - Karlovac - Gračac - Knin - Sinj - Split (D8) 419.15 km
D2 Dubrava Križovljanska border crossing (Slovenia) - Koprivnica - Virovitica - Sveti Đurađ- Našice - Osijek - Vukovar - Ilok border crossing (Serbia) 347.23 km
D3 Goričan border crossing (Hungary) - Hodošan (A4) - Čakovec - Varaždin - Breznički Hum - Popovec (A1) - Karlovac - Rijeka (D8) 220.65 km
D5 Terezino Polje border crossing (Hungary) - Virovitica - Veliki Zdenci - Donji Daruvar - Lipik - Stara Gradiška border crossing (Bosnia and Herzegovina) 123.19 km
D6 Jurovski Brod border crossing (Slovenia) - Ribnik - Karlovac - Brezova Glava - Vojnić - Glina - Dvor border crossing (Bosnia and Herzegovina) 134.65 km
D7 Duboševica border crossing (Hungary) - Beli Manastir - Osijek - Đakovo - Slavonski Šamac border crossing (Bosnia and Herzegovina) 115.26 km
D8 Pasjak border crossing (Slovenia) - Matulji - Rijeka - Zadar - Split - Pelješac - Dubrovnik - Karasovići border crossing (Montenegro) 657.70 km
D9 Metković border crossing (Bosnia and Herzegovina) - Opuzen (D8) 10.63 km

D10 - D77

Number Control cities (or other appropriate route description) Length
D10 Sveta Helena interchange (A4) - Cugovec - Križevci - Koprivnica - Gola border crossing (Hungary) 85.35 km
D12 Zabrđe (D10) - Haganj - Zvonik - Bjelovar - Virovitica - Terezino Polje border crossing (Hungary) 90.54 km
D14 Mokrice (D307) - Donja Zabočka - Bedekovičina - Selnica - Podgrađe (D29) 17.42 km
D20 Čakovec (D3) – Prelog – Donja Dubrava – Đelekovec – Koprivnica (D2) 50.4 km
D22 D3 - Novi Marof – Križevci – Sveti Ivan Žabno 42.7 km
D23 Duga Resa (D3) – Josipdol – Žuta Lokva – Senj (D8) 103.9 km
D24 Zabok (D1) – Zlatar Bistrica – Donja Konjšćina – Budinšćina – Novi Marof – Varaždinske Toplice – Poljanec (D2) 72.4 km
D25 Korenica (D1) – Bunić – Lički Osik – Gospić – Karlobag (D8) 83.6 km
D26 Dubrava (D10) - Čazma - Garešnica - Dežanovac - Daruvar (D5) 88.5 km
D27 Gračac (D1) - Obrovac - Benkovac - Stankovci - D8 96.9 km
D28 Gradec (D10) - Bjelovar - Veliki Zdenci (D5) 70.7 km
D29 Novi Golubovec (D35) - Zlatar Bistrica - Marija Bistrica - Soblinec (D3) 49.8 km
D30 Buzin interchange (A3) - Velika Gorica - Petrinja - Hrvatska Kostajnica border checkpoint (Bosnia and Herzegovina) 83.1 km
D31 Velika Gorica (D30) - Gornji Viduševac - D6 56.1 km
D32 Prezid border checkpoint (Slovenia) - Delnice (D3) 49.7 km
D33 Strmica border checkpoint (Bosnia and Herzegovina) - Knin - Drniš - Vidici (D8) 73.3 km
D34 Slatina (D2) - Donji Miholjac - Josipovac (D2) 79.0 km
D35 Varaždin (D2) - Lepoglava - Sveti Križ Začretje (D1) 46.0 km
D36 Karlovac (D1) - Pokupsko - Sisak - Popovača (Ž3124) 110.5 km
D37 Sisak (D36) - Petrinja - Glina (D6) 34.4 km
D38 Pakrac (D5) - Požega - Pleternica - Đakovo (D7) 120.7 km
D39 Bosnian Border - Aržano - Cista Provo - Šestanovac roundabout - Dubci (D8) 37.3 km
D40 Sveti Kuzam interchange (A7) - D8 - Port of Bakar (West) 3.1 km
D41 Gola border checkpoint - Koprivnica - Križevci (D22) 82.9 km
D42 Vrbovsko (D3) - Ogulin - Josipdol - Plaški - Grabovac (D1) 57.9 km
D43 Đurđevac (D2) - Bjelovar - Čazma - Ivanić Grad interchange (A3) 78.1 km
D44 Nova Vas interchange (A9) - Ponte Porton - Buzet - Lupoglav interchange (A8) 50.5 km
D45 Veliki Zdenci - (D5) - Garešnica - Kutina interchange A3 43.6 km
D46 Đakovo D7 -Vinkovci - Tovarnik border checkpoint (Serbia) 73.0 km
D47 Lipik (D5) - Novska - Hrvatska Dubica - Hrvatska Kostajnica - Dvor (D6) 94.5 km
D48 Baderna interchange (A9) - Pazin - Rogovići interchange (A8) 20.8 km
D49 Pleternica - Lužani interchange (A3) 19.2 km
D50 Žuta Lokva (D23) - Otočac - Gospić - Gračac (D40) 104.2 km
D51 Gradište (D53) - Požega - Nova Gradiška interchange (A3) 50.3 km
D52 Špilnik (D50) - Korenica (D1) 41.1 km
D53 Donji Miholjac border checkpoint (Hungary) - Našice - Slavonski Brod border checkpoint (Bosnia and Herzegovina) 91.6 km
D54 Maslenica (D8) - Zaton Obrovački D27 13.5 km
D55 Borovo (D2) - Vinkovci - Županja border checkpoint (Bosnia and Herzegovina) 48.6 km
D56 Tromilja interchange (D424) – Benkovac – Skradin – Drniš (D33) – Muć – Klis–Grlo interchange (D1) 119.6 km
D57 Vukovar (D2) - Orolik - Nijemci - Lipovac interchange A3 36.1 km
D58 Šibenik (port) - Boraja - Trogir (D8) 43.0 km
D59 Knin (D8) - Kistanje - Bribirske Mostine - Putičanje - Kapela (D8) 53.9 km
D60 Brnaze (D1) - Trilj - Cista Provo - Imotski - Vinjani Donji border checkpoint (Bosnia and Herzegovina) 66.1 km
D62 Šestanovac (D39) - Zagvozd - Vrgorac - Kula Norinska - Metković (D9) 89.5 km
D64 Pazin (D48) - Potpićan - Vozilići (D66) 26.9 km
D66 Pula (D400) - Labin - Opatija - Matulji (D8) 90.1 km
D69 Slatina (D2) - Čeralije - Voćin - Novo Zvečevo - Kamenska (D38) 53.4 km
D70 Omiš (D8) - Naklice - Gata - Blato na Cetini interchange (A1) 21.6 km
D72 Slavonski Brod: D53 - Svačićeva - I. G. Kovačića - N. Zrinskog (D423) 2.7 km
D74 Đurmanec (D207) - Krapina - Bednja - Lepoglava (D35) 22.0 km
D75 D200 - Savudrija - Umag - Novigrad - Poreč - Vrsar - Vrh Lima - Bale - Pula (D400) 101.7 km
D76 Baško Polje (D8) – Zagvozd (D62) – Grubine (D60) – Imotski – Gornji Vinjani border checkpoint (Bosnia and Herzegovina) 28.3 km
D77 Rogovići interchange (A8) – Žminj – Svetvinčenat – Vodnjan (D75) 33.2 km
D78 Čakovec (D209) – Mihovljan (Mihovljanska ulica) 1.79 km
D80 Donji Daruvar (D5) – Đulovac - Suhopolje (D2) 38.13 km
D99 Kraljevica (L58107) – Križišće (D501) – Bribir (Ž5062) – Novi Vinodolski (D8) 25.47 km

D100 - D128

Number Control cities (or other appropriate route description) Length
D100 Porozina (ferry port) - Cres - Mali Lošinj (Ž5159) 80.5 km
D101 D100 - Merag (ferry port) 10.9 km
D102 Šmrika (D8) - Krk - Baška 48.3 km
D103 D102 - Rijeka Airport 1.7 km
D104 D102- Valbiska (ferry port) 10.1 km
D105 Lopar (ferry port) - Rab - Mišnjak (ferry port) 22.7 km
D106 Žigljen (ferry port) - Novalja - Pag - Ražanac - Posedarje (D8) 73.8 km
D109 Veli Rat - Savar - Sali 41.9 km
D110 Muline (ferry port) - Ugljan - Tkon (ferry port) 41.6 km
D111 Maslinica - Grohote - Stomorska 17.8 km
D112 Rogač (ferry port) - D111 1.9 km
D113 Supetar - Nerežišće - Sumartin (ferry port) 39.4 km
D114 Milna - Sutivan - Supetar (D113) 18.8 km
D115 Gornji Humac (D113) - Bol 11.4 km
D116 Hvar - Milna - Starigrad (ferry port) - Sućuraj 77.8 km
D117 Komiža - Podhum - Vis 19.9 km
D118 Vela Luka - Kapja - Dubovo - Korčula 43.5 km
D119 Ubli - Lastovo 9.5 km
D120 Pomena - Polače - Sobra - Saplunara 42.9 km
D121 Murter - Tisno - D8 14.0 km
D123 Sobra (ferry port) - D120 1.1 km
D124 Brbinj (ferry port) - Brbinj - D109 1.7 km
D125 Zaglav (ferry port) - D109 1.1 km
D126 Trogir (D315) - Arbanija - Slatine 8.3 km
D128 Uvala Mikavica - Žirje (ferry port) 3.8 km

County Roads

In Croatia, county roads (županijska cesta) are designated with a 4 digit number, and they are usually labeled with the letter Ž.

Tolls

In the Republic of Croatia, primarily a closed toll system is applied to the entire motorway network tolls with multiple entrances and exits. The use of motorways is charged by mileage and vehicle category. At the entrance on the motorway, the user picks up the entrance card (or a record recorded on the ENC device) and the payment is made on exit toll stations according to the length of the trip. The open system is in use at toll stations Bregana(A3) and Rupa(A7).

New system under construction

The new electronic toll collection system Crolibertas is a strategic project with a completely different way of paying tolls. The Crolibertas system will be introduced on all motorways in the Republic of Croatia, operated by HAC), Bina-Istra and AZM. The Crolibertas toll collection system is based on the free flow of vehicles in multiple lanes (multi lane free flow – MLFF) with a combination of DSRC (ENC device) and ALPR (with cameras).

On 24 September 2024, Croatian Motorways signed a contract for the implementation of a new toll collection system with a consortium of bidders consisting of the Slovak company SkyToll and the Czech TollNet. The value of the contract is €79,913,480.52 excluding VAT, of which €64,167,383.70 relates to the design, construction and equipping of the toll collection system, and the rest relates to spare parts and a ten-year maintenance period for the system.

The system will consist of 208 toll booths on all highways, 140 fast lanes for registration and 74 mobile units (cars) for user supervision.

Safety

Croatia had 62 road deaths per million inhabitants estimated in 2025.

See also

Maps

  1. ↑ Overview map of the A1 (Map). OpenStreetMap. Retrieved December 14, 2012.
  2. ↑ Overview map of the A2 (Map). OpenStreetMap. Retrieved December 14, 2012.
  3. ↑ Overview map of the A3 (Map). OpenStreetMap. Retrieved December 14, 2012.
  4. ↑ Overview map of the A4 (Map). OpenStreetMap. Retrieved December 14, 2012.
  5. ↑ Overview map of the A5 (Map). OpenStreetMap. Retrieved December 14, 2012.
  6. ↑ Overview map of the A6 (Map). OpenStreetMap. Retrieved December 14, 2012.
  7. ↑ Overview map of the A7 (Map). OpenStreetMap. Retrieved December 14, 2012.
  8. ↑ Overview map of the A8 (Map). OpenStreetMap. Retrieved December 14, 2012.
  9. ↑ Overview map of the A9 (Map). OpenStreetMap. Retrieved December 14, 2012.
  10. ↑ Overview map of the A10 (Map). OpenStreetMap. Retrieved July 7, 2013.
  11. ↑ Overview map of the A11 (Map). OpenStreetMap. Retrieved December 14, 2012.