Line 6 (Changsha Metro)

Line 6
Overview
StatusOperational
OwnerChangsha Government
LocaleChangsha, Hunan, China
Termini
Stations34
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Shuicheng Rail Transit Co., Ltd
Guangzhou Metro Group Co., Ltd
History
Opened28 June 2022; 4 years ago (2022-06-28)
Technical
Line length48.11 km (29.89 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)

Line 6 of the Changsha Metro (Chinese: 长沙地铁六号线; pinyin: Chǎngshā Dìtiě Liù Hào Xiàn) is a rapid transit line in Changsha, Hunan, China. The line opened on 28 June 2022, running 48.11 kilometres (29.89 mi) with 34 stations.. This is the first line of Changsha Metro system operating under PPP contract with 25-year tenure.

History

Construction started on 28 December 2016 with estimated investment of 38.84 billion RMB. Test operations without passengers started in December 2021. Phase 1 of Line 6 opened on 28 June 2022.

Opening timeline

Segment Commencement Length Station(s) Name
Xiejiaqiao — Huanghua Airport T1 & T2 28 June 2022 48.11 km (29.89 mi) 34 Phase 1

Rolling stock

The line is operated using six-car Type A trains manufactured by CRRC Zhuzhou Locomotive, with a capacity for 2592 passengers. The maximum service speed of the trains is 80 km/h.

Stations

Section Station name Connections Distance
km
Location
English Chinese
Phase 1
Xiejiaqiao谢家桥
Xiangbiwo象鼻窝
Zhongtang中塘 2 
Hunan First Normal University (West Campus)一师范西校区
Changqing长庆
Hexinyuan和馨园
Changfeng长丰
Lugu Sports Park麓谷体育公园
Lugu Park麓谷公园
Jiantang涧塘
Hunan University of Technology and Business湖南工商大学
Baigezui白鸽咀
The Third Xiangya Hospital湘雅三医院
Liugoulong六沟垅 4 
Wenchangge文昌阁 1 
Xiangya Hospital湘雅医院
South Martyrs Park烈士公园南
Yingbin Road迎宾路口 2 
Yaoling & The Second Xiangya Hospital窑岭湘雅二医院 7 
Chaoyangcun朝阳村 3 
Furong District Government芙蓉区政府 5 
Renmin East Road人民东路 2 
Huaqiao花桥
Longping Rice Museum隆平水稻博物馆
Acad. of Agri-Sciences & Agri-University农科院农大
Donghu东湖
Shaoguang韶光
Longhua龙华
Tanmuqiao檀木桥
Caojiaping曹家坪
Longfeng龙峰
Dalucun大路村
Mumaduan木马塅
Huanghua Airport T1 & T2黄花机场T1T2 Maglev 
Changsha Huanghua International Airport CSX
East extension Huanghua Airport T3黄花机场T3Changsha Huanghua International Airport CSX

References

  1. 1 2 "好消息!长沙地铁6号线全线"轨通"". Retrieved 30 October 2021.
  2. 1 2 "长沙穗城五载征程:一条地铁线,助力激活城市发展"强引擎"". Retrieved 22 May 2025.
  3. 1 2 3 "拥有多项之"最"头衔的长沙地铁6号线,明天开通初期运营". 2022-06-27. Retrieved 2022-06-28.
  4. 1 2 "【长沙市】地铁6号线PPP项目正式签约 系长沙首个轨道交通PPP项目". 14 June 2020.
  5. ↑ Jiang Jun (蒋俊), ed. (28 December 2016). 长沙地铁6号线(配套工程)今日开工建设 共设站34座. hunan.voc.com.cn (in Chinese). Retrieved 22 December 2021.
  6. ↑ "长沙市轨道交通集团官网-官宣 | 长沙地铁7号线一期工程今日正式开工 6号线同步通车试运行". www.hncsmtr.com. 2021-12-31.
  7. ↑ "一车能装2592人,车厢里还能充电!长沙地铁6号线首列车抵达长沙". Archived from the original on 2022-07-27. 长沙地铁6号线车辆外观以"蓝色"为主色调,采用6节编组A型车,最大载客量为2592人/列,最高运行速度为80千米/小时