Danube Flats

Danube Flats
General information
StatusCompleted
TypeResidential
Architectural style
Postmodern
LocationVienna, Austria, 2 Wagramer Strasse
Coordinates48°13′49″N 16°24′53″E / 48.23031°N 16.41470°E / 48.23031; 16.41470
Construction started
2020
Completed
2024
OwnerS+B Gruppe AG
Soravia Group
Height
Roof182 m (597 ft)
Technical details
Structural systemConcrete
Floor count48
Design and construction
ArchitectA01 architects
DeveloperS+B Gruppe AG
Structural engineer
KS Ingenieure ZT
Doka GmbH (framework)
Main contractorGranit Gesellschaft

The Danube Flats is a residential skyscraper in the Donau City district of Vienna, Austria. Built between 2020 and 2024, the tower stands at 182 m (597 ft) tall with 48 floors and is the current 3rd tallest building in both Vienna and Austria.

History

Architecture

The tower houses a total of approximately 600 privately financed condominiums and investment apartments spread across 48 floors. Since its inauguration, it has been the tallest residential building in Austria. Construction began in April 2019, and completion was planned for 2023, but was delayed until 2024.

On April 19, 2012, the tender documents for the Danube Flats project were handed over to a group of architectural teams. The objective of this competition was to develop a residential quarter with attractive uses, particularly on the ground and basement floors, on the approximately 1.24-hectare property at Wagramer Straße 2.

On September 5, 2012, the decision was made in favor of the design proposed by the Vienna architectural firm of A01 architects.

On November 16, 2018, the Supreme Administrative Court of Austria upheld the building permit for the "Danube Flats" high-rise project in Donaustadt, thereby rejecting complaints from local residents. The previous building was demolished by the end of 2018, and excavation work began in April 2019. Construction of the building itself started in the first quarter of 2021.

Criticism

The Kaisermühlen Initiative argues that the construction of the Danube Flats building could lead to a decline in the quality of life for the residents of the Hochhaus Neue Donau building, partly due to the obstructed view of the Danube and partly due to a feared increase in noise and wind.

The main criticism, however, is that in the important urban development area of ​​Donau City, the developers Soravia and S+B Group were primarily looking forward to creating privately financed luxury apartments instead of affordable housing units.

See also

References

  1. ↑ "Danube Flats". CVU Skyscraper Center. Retrieved 9 December 2024.
  2. ↑ "Im Wohnturm Danubeflats bleiben die Käufer unter sich" (in Austrian German). Retrieved 2025-01-04.
  3. 1 2 Danue Flats S+B Gruppe, abgerufen am 30. November 2021.
  4. ↑ Höchster Wohnturm Österreichs: Bau verzögert sich um Jahre. In: derStandard.at, 19. November 2017.
  5. ↑ Wien bekommt höchsten Skyscraper des Landes. In: krone.at, abgerufen am 15. Jänner 2019.
  6. ↑ Soravia: Danubeflats - the one and only. Pressemitteilung vom 8. September 2021
  7. ↑ "Danube Flats". Archello. Retrieved October 31, 2026.
  8. ↑ "Baubescheid für "Danube Flats"". wien.orf.at. 2019-11-16. Retrieved 2019-11-17.
  9. ↑ Soravia: SB Gruppe und Soravia präsentieren Danubeflats, Pressemitteilung vom 9. Juli 2021
  10. ↑ "Danube-Flats": Info-Abende und Petition. In: derstandard.at vom 21. März 2013.
  11. ↑ Höchster Wohnturm: Baubeginn im April. In: wien.orf.at, 15. Jänner 2019, abgerufen am 15. Jänner 2019.