Highways in Croatia are the main transport network in Croatia. The Croatian classification includes several categories of highways:
Other than the motorway routes, the national road classification includes the following enumerated categories of routes in the national highway system, with decreasing order of priority:
Road operators differ according to the classification system: The designated motorways are operated by three different concessionaires. The state roads are maintained almost exclusively by Hrvatske ceste, while the county and local roads are managed by various county authorities. The road maintenance agencies are governed by various laws issued by the Parliament as well as bylaws issued by the Ministry of Transport.

The primary high-speed motorways are called autoceste (Croatian pronunciation: [ˈautot͡sesta] singular: autocesta), and they are defined as roads with at least three lanes in each direction (including hard shoulder) and a speed limit of not less than 80 kilometres per hour (50 mph). They are marked with a special road sign, similar to the road sign depicting a motorway/autoroute/autobahn in other parts of Europe. The Croatian motorway (autocesta) network is 1,360.5 kilometres (845.4 mi) long.
Motorways in Croatia are defined by the Ministry of Maritime Affairs, Transport and Infrastructure. The same applies to names of the motorway interchanges and rest areas.
A major reason for the motorway construction "mania" of the 2000s is a previous political halt of the major Croatian highway project, today's A1, in the 1970s and 1980s under former Yugoslavia. When Croatia declared independence in 1991, the only true motorways in the country were Rijeka–Kikovica (the westernmost part of today's A6), Zagreb–Karlovac (the northernmost part of today's A1) and Zagreb–Slavonski Brod (the central part of today's A3), the latter being part of the Brotherhood and Unity Highway. The dream to connect the two largest Croatian cities Zagreb and Split with a motorway (autocesta) went back to the times of the Croatian Spring, but construction of this project was never realized in the Yugoslav period.

In 2005, the Zagreb–Split route was constructed. In addition, the A1 was extended towards Dubrovnik (currently at Ploče), and the A3 was extended so it connects Zagreb to Croatian borders with both Serbia (near Lipovac) and Slovenia (near Bregana). There is also a motorway from Zagreb to Rijeka, the A6, as well as the A4 motorway from Zagreb to the northeast (Hungarian border) as well as the A2 motorway from Zagreb to the northwest (Slovenian border). The A9 between Pula and the Slovenian border is also largely completed.
The construction of additional motorways has noticeably slowed in the 2010s, but it continues. As of 2021[update], the Cerovlje–Rijeka section of A8, the remaining part of the Istrian Y, is being upgraded from semi-highway status. The other motorways are in various early stages of development, coming up to a total of 11 motorway routes. The A1 is considered unfinished as it is planned to be extended from Ploče to Dubrovnik.
The network is managed by 3 operators, of which one is under full government control and other two are operated by joint ventures.
| Operator | Ownership | Motorway | Length (in 2025) | Notes |
|---|---|---|---|---|
| BINA Istra | BINA Fincom (67%) Bouygues (16%) Hrvatske autoceste (14.8%) Istarska autocesta (2.2%) |
A8, A9 | 141.0 km (87.6 mi) | Under concession until 2041. |
| Autocesta Zagreb – Macelj | Pyhrn Concession Holding GmbH (51%) Republic of Croatia (49%) |
A2 | 60.0 km (37.3 mi) | Under concession until 2032. |
| Hrvatske autoceste | Republic of Croatia (100%) | A1, A3, A4, A5, A6, A7, A10, A11, Krk bridge | 1,159.5 km (720.5 mi) | A6 and A7 were operated by Autocesta Rijeka – Zagreb until 31 December 2020. |
| Motorway | Route | Length (in 2025) |
Description | Notes |
|---|---|---|---|---|
| Zagreb - Split - Dubrovnik | 484.1 km (300.8 mi) | The A1 starts in Lučko interchange, a part of Zagreb bypass where the A3 motorway junction is located. The motorway proceeds south from Zagreb to Karlovac and further on to Bosiljevo 2 interchange where the A6 motorway branches off towards Rijeka. The route continues south to Gospić, Zadar, Šibenik, Split. The southernmost sector of the motorway proceeds from Split to Ploče and Metković. | Section between Ploče and Dubrovnik is planned | |
| Zagreb - Macelj | 62.3 km (38.7 mi) | The A2 starts on the border with Slovenia near Macelj. The motorway passes west of Krapina and proceeds south towards Zagreb. The southernmost section of the motorway forms a part of Zagreb bypass and it terminates at Jankomir interchange with the A3 motorway. | ||
| Bregana - Zagreb - Lipovac | 305.5 km (189.8 mi) | The A3 starts on the border of Slovenia near Bregana. The motorway passes north of Samobor and proceeds west towards Zagreb, passing to the south of the city and forming a part of Zagreb bypass, where the route contains junctions with the A2, A1 and A4 motorways. It continues east to Kutina, Slavonski Brod, Sredanci interchange with the A5 motorway and further east to Županja and terminating on the border of Serbia near Lipovac. | ||
| Zagreb - Goričan | 97.7 km (60.7 mi) | The A4 starts on the border of Hungary near Goričan. The motorway passes near Čakovec and Varaždin south towards Zagreb and the southernmost part of the route is a part of Zagreb bypass, where the motorway terminates in Ivanja Reka interchange, where the traffic defaults to the westbound A3 motorway. | ||
| Beli Manastir - Osijek - Bosnian border | 88.2 km (54.8 mi) | The A5 starts on the border of Hungary near Beli Manastir and proceeds south bypassing Osijek and Đakovo, meets the A3 motorway at Zoljani interchange and proceeds south to Svilaj border bridge where it connects on Bosnian A1 motorway. | ||
| Rijeka - Bosiljevo 2 | 81.5 km (50.6 mi) | The A6 starts in Bosiljevo 2 interchange, branching off from the A1 motorway and proceeds west bypassing Delnice to Rijeka and the Orehovica interchange with the A7 motorway. | ||
| Rupa - Rijeka - Žuta Lokva | 49 km (30 mi) | The A7 starts at the border of Slovenia and heads south to Rijeka, passes the city as Rijeka bypass. The Rijeka bypass section comprises an interchange with the A6 motorway and proceeds east terminating near Šmrika where the traffic defaults to the D8 state road. | Section east of Rijeka is under construction. | |
| Kanfanar - Matulji | 65.8 km (40.9 mi) | The A8 spans between Kanfanar and Matulji, i.e. the A9 and A7 motorways. As of September 2024, the Kanfanar–Vranja section is brought to the motorway standards, with new tube of Učka tunnel opened and the rest is a limited access two-lane route. | ||
| Umag - Pula | 76.8 km (47.7 mi) | The A9 starts near Umag and the Slovenian border, meets the A8 motorway at Kanfanar interchange, and proceeds south to Pula, forming the western arm of Istrian Y. | ||
| Bosnian border - Ploče interchange | 8.6 km (5.3 mi) | The A10 starts at Bosnian border, where it connects to A1 motorway in Bosnia and runs to the Ploče interchange, where it connects to A1 motorway. | ||
| Zagreb - Sisak | 41 km (25 mi) | The A11 starts at Jakuševec interchange and runs south to Sisak interchange. It was connected to A3 in November 2015 and it is opened to Sisak in October 2024. |
| Motorway | County | Length | Section | Description | Scheduled completion |
|---|---|---|---|---|---|
| Primorje-Gorski Kotar | 5.2 km (3.2 mi) | Križišće–Jadranovo | Construction began in October 2026. The project consists of the 2,060-meter-long Križišće Tunnel, two viaducts and two carriageways, and the Jadranovo interchange, along with the reconstruction of the Križišće interchange and the construction of a connecting road to the Adriatic Highway. | October 2029 | |
| 6.5 km (4.0 mi) | Novi Vinodolski bypass | Construction began in September 2021 and will consist of two lane expressway that will match the left lane of the future motorway. | Q4 2027 | ||
| 11 km (6.8 mi) | Učka Tunnel–Matulji | Construction of additional two lanes started in September 2023. | Q1 2027 | ||
| Istria | 2.5 km (1.6 mi) | Mirna Bridge | Construction of bridge for upgrading motorway on four lanes in total, the construction started in February 2024. | End of 2026 |
| Motorway | County | Length | Section | Notes |
|---|---|---|---|---|
| City of Zagreb, Zagreb and Karlovac | 38.6 km (24.0 mi) | Zagreb–Karlovac | Upgrade to six lanes, the start of the works is planned for second half of 2027. | |
| Karlovac | 28.2 km (17.5 mi) | Karlovac–Bosiljevo 2 | Upgrade to six lanes. Start of works after completion of the Zagreb-Karlovac section. | |
| Dubrovnik-Neretva | 18.4 km (11.4 mi) | Metković–Pelješac | As of July 2025[update], this section was undergoing field investigation works for the purpose of preparing an environmental impact study for the project. | |
| 29.5 km (18.3 mi) | Rudine–Osojnik (Dubrovnik) | The tender for the construction of two parts of this section (9 km and 11.5 km long, resp.) was open in July 2025. The remaining part was undergoing field investigation works for the purpose of preparing an environmental impact study for the project. | ||
| 4.2 km (2.6 mi) | Osojnik–Nova Mokošica border crossing | Planning started. | ||
| Krapina-Zagorje | 3.7 km (2.3 mi) | Đurmanec–Macelj | The construction of tunnels Sveta Tri Kralja and Brezovica so the section is upgraded to four lane motorway was expected to begin in the fall of 2022. | |
| City of Zagreb | 4.5 km (2.8 mi) | Jankomir–Lučko | Upgrade to six lanes. Construction starts at autumn 2026. | |
| Zagreb and City of Zagreb | 20.5 km (12.7 mi) | Lučko–Ivanja Reka | Upgrade to six lanes. Start of works after completion of the Jankomir-Lučko section. | |
| Primorje-Gorski Kotar | 12.3 km (7.6 mi) | Jadranovo–Selce | Construction work on this section is expected to begin in September 2026, and the completion deadline is 42 months from the contractor's introduction into the work. | |
| 6.5 km (4.0 mi) | Novi Vinodolski bypass | Design started in 2023 and competition for construction will start on the end 2026 completing remaining two lanes that will match the right lane of the motorway. | ||
| Primorje-Gorski Kotar and Lika-Senj | 21 km (13 mi) | Novi Vinodolski–Senj | A conceptual design has been developed and the coordination of spatial plans is underway. In parallel, an Environmental Impact Study is being prepared and field research is ongoing. | |
| Lika-Senj | 10.8 km (6.7 mi) | Senj–Žuta Lokva | The preparation of project documentation up to the location permit has been contracted, a conceptual design has been developed, and the Environmental Impact Study is being prepared, and field research is underway. |
In 2025, the network had a traffic of 101,416,327 vehicles, including 89,134,555 light vehicles and 12,281,772 heavy vehicles (difference by axle height).
The travel cost is 0.08 euros per km for light vehicles in closed system and 0.06 euros in open toll system, while for heavy ones are 0.34 euros per km in closed system and 0.21 in open system.
Those costs generate a revenue of 569.5 millions of euros (without VAT) in 2025.
Two third of motorway fatalities (67%) occurred in the third of the year between July and October.

There is a wide variety of types of expressways in Croatia, in terms of number of lanes, accessibility and types of intersections comprised. They range from four lane expressways with grade-separated intersections and limited access - distinguished from the motorways by lack of emergency lanes only - to four or six lane urban expressways with numerous at-grade intersections and traffic lights or two lane limited access roads with grade separated intersections. The expressways include both incomplete motorways, built in stages, and some state roads (with either limited access, more than two traffic lanes, grade-separated intersections or any combination thereof). There are even some instances of county roads which may be regarded expressways such as Jadranska Avenue (Ž1040).
As a rule, the expressways are not tolled; however, major tunnels on the expressways are tolled.
| Number | Length | Control cities | Notes |
|---|---|---|---|
| 11.5 km (7.1 mi) | Karlovac interchange (A1) - Cerovac Vukmanićki | four lane dual carriageway / two lane single carriageway, with at-grade intersections | |
| 5.1 km (3.2 mi) | Udbina western bypass | two lane single carriageway, with grade separated intersections | |
| 15 km (9.3 mi) | Dugopolje interchange (A1) - Split | four lane dual carriageway, with grade separated intersections | |
| 13 km (8.1 mi) | Osijek southern bypass | four lane dual carriageway, with grade separated intersections | |
| 4.7 km (2.9 mi) | Novi Varoš - Stara Gradiška | four lane dual carriageway, with grade separated intersections | |
| 11.4 km (7.1 mi) | sections through and near Split | four lane dual carriageway, with at-grade intersections | |
| 32.5 km (20.2 mi) | Duboka interchange – Zaton Doli | two lane single carriageway, with grade separated intersections | |
| 34.9 km (21.7 mi) | Sveta Helena interchange (A4) - Križevci | four lane dual carriageway, with grade separated intersections | |
| 10.6 km (6.6 mi) | Vrbovec 2 interchange (D10) - Farkaševac | four lane dual carriageway, with grade separated intersections | |
| 17.4 km (10.8 mi) | Zabok interchange (A2) – Zlatar Bistrica (D29) | two lane single carriageway, with grade separated intersections | |
| 7 km (4.3 mi) | Šibenik interchange (A1) - Šibenik (Vidici interchange) | two lane single carriageway, with grade separated intersections | |
| 7.5 km (4.7 mi) | Zagvozd (Biokovo toll booth) - Baška Voda (D8) | two/four lane single carriageway with grade separated intersections | |
| 5.4 km (3.4 mi) | Bisko interchange (A1) - Čaporice (D60) | four lane dual carriageway/two lane single carriageway, with grade separated intersections | |
| 4.3 km (2.7 mi) | Draga interchange (A7) - Rijeka (Brajdica interchange) | three/four lane single carriageway, with grade separated intersections | |
| 17.6 km (10.9 mi) | Zadar 2 interchange (A1) - Zadar (Gaženica Port) | four lane dual carriageway, with grade separated intersections | |
| 9.8 km (6.1 mi) | Karamatići toll station (A1) - Ploče (Čeveljuša interchange) | four lane dual carriageway/two lane single carriageway, with grade separated intersections | |
| 13 km (8.1 mi) | Gornja Ploča interchange (A1) - Udbina | two lane single carriageway, with grade separated intersections |
| Number | Length | Section | Notes | Completion |
|---|---|---|---|---|
| 5.1 km (3.2 mi) | Farkaševac - Breza | two lane single carriageway, with grade separated intersections | Construction finished in Summer 2023. | |
| 5.6 km (3.5 mi) | Špišić Bukovica - Virovitica interchange | two lane single carriageway, with grade separated intersections | Construction finished in End of 2025. and opening in Mid-2027 |
| Number | Length | Section | Notes | Scheduled completion |
|---|---|---|---|---|
| 3.7 km (2.3 mi) | Okučani interchange (A3) - Novi Varoš | four lane dual carriageway, with grade separated intersections | October 2026 | |
| 2.6 km (1.6 mi) | Mravince interchange (D1) - TTTS | four lane dual carriageway, with grade separated intersections | Spring 2027 | |
| 5.2 km (3.2 mi) | TTTS - Gornja Podstrana | four lane dual carriageway, with grade separated intersections | 2030 | |
| 7.5 km (4.7 mi) | Križevci - Kloštar Vojakovački | two lane single carriageway, with grade separated intersections | December 2026 | |
| 11.8 km (7.3 mi) | Breza - Bjelovar | two lane single carriageway, with grade separated intersections | Spring 2026 | |
| 9.4 km (5.8 mi) | Bjelovar - Bulinac | two lane single carriageway, with grade separated intersections | July 2028 | |
| 7.5 km (4.7 mi) | Varaždin interchange (D2) - Cerje Tužno | two lane single carriageway, with at-grade intersections | April 2028 | |
| 14.75 km (9.17 mi) | Brestovac Požeški - Godinjak | two lane single carriageway, with grade separateds | November 2029 | |
| 1.4 km (0.87 mi) | Godinjak - Požega interchange (A3) | two lane single carriageway, with grade separateds | ||
| 9.8 km (6.1 mi) | Nuštar - Vukovar | two lane single carriageway, with grade separateds | 2029 |
| Number | Route | Length | Section | Notes |
|---|---|---|---|---|
| Varaždin - Koprivnice - Virovitica - Osijek - Vinkovci | 22 km (14 mi) | Ludbreg interchange (A4) - Koprivnice | four lane dual carriageway & two lane single carriageway, with grade separated intersections | |
| 20 km (12 mi) | Koprivnice bypass | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| 33.1 km (20.6 mi) | Koprivnice - Pitomača | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| 21.9 km (13.6 mi) | Pitomača - Virovitica | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| 9 km (5.6 mi) | Virovitica - Suhopolje | four lane dual carriageway, with grade separated intersections | ||
| 23.3 km (14.5 mi) | Suhopolje - Slatina | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| 46.2 km (28.7 mi) | Slatina - Našice | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| 33.1 km (20.6 mi) | Našice - Čepin | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| 39 km (24 mi) | Čepin - Nuštar (Vinkovci) | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| Virovitica - Daruvar - Okučani | 52.9 km (32.9 mi) | Virovitica - Pakrac | two lane single carriageway, with grade separated intersections | |
| 12 km (7.5 mi) | Pakrac - Lipik | two lane single carriageway, with grade separated intersections | ||
| 20.7 km (12.9 mi) | Lipik - Okučani | two lane single carriageway, with grade separated intersections | ||
| Split - Omiš | 8 km (5.0 mi) | Gornja Podstrana - Dugi Rat | four lane dual carriageway, with grade separated intersections | |
| 3 km (1.9 mi) | Dugi Rat - Omiš | two lane single carriageway, with grade separated intersections | ||
| Dubrovnik - Cavtat - Čilipi - Karasovići - border crossing (Montenegro) | 7.4 km (4.6 mi) | Dubrovnik bypass | two lane single carriageway, with grade separated intersections | |
| 13.2 km (8.2 mi) | Dubrovnik - Cavtat | two lane single carriageway, with grade separated intersections | ||
| 9 km (5.6 mi) | Cavtat - Čilipi | two lane single carriageway, with grade separated intersections | ||
| Križevci - Koprivnice - Gola - border crossing (Hungary) | 10.5 km (6.5 mi) | Kloštar Vojakovački - Velika Mučna | two lane single carriageway, with grade separated intersections | |
| 12 km (7.5 mi) | Velika Mučna - Koprivnice jug | two lane single carriageway, with grade separated intersections | ||
| 5.4 km (3.4 mi) | Koprivnice jug - Koprivnice | two lane single carriageway, with grade separated intersections | ||
| Bjelovar - Virovitica - Terezino Polje - border crossing (Hungary) | 11.2 km (7.0 mi) | Bulinac - Velika Pisanica | two lane single carriageway, with grade separated intersections | |
| 19 km (12 mi) | Velika Pisanica - Špišić Bukovica | two lane single carriageway, with grade separated intersections | ||
| Zlatar Bistrica - Kašina - Soblinec | 3.5 km (2.2 mi) | Zlatar Bistrica - Marija Bistrica | two lane single carriageway, with grade separated intersections | |
| 13.8 km (8.6 mi) | Marija Bistrica - Kašina | two lane single carriageway, with grade separated intersections | ||
| 6.1 km (3.8 mi) | Kašina - Popovec interchange (A4) | two lane single carriageway, with grade separated intersections | ||
| Šibenik - Drniš - Knin - Strmica - border crossing (Bosnia and Herzegovina) | 19.1 km (11.9 mi) | Tromilja (Šibenik northeast) - Drniš | four lane dual carriageway & two lane single carriageway, with grade separated intersections) | |
| 1.1 km (0.68 mi) | Drniš bypass | four lane dual carriageway & two lane single carriageway, with grade separated intersections) | ||
| 26.8 km (16.7 mi) | Drniš - Knin | four lane dual carriageway & two lane single carriageway, with grade separated intersections) | ||
| Varaždin - Ivanec - Krapina | 6.9 km (4.3 mi) | Cerje Tužno - Ivanec | four lane dual carriageway & two lane single carriageway, with grade separated intersections | |
| 7.5 km (4.7 mi) | Ivanec - Lepoglava | four lane dual carriageway & two lane single carriageway, with grade separated intersections | ||
| Vinkovci - Županja - border crossing (Bosnia and Herzegovina) | 21 km (13 mi) | Županja 2 interchange (A3) - Vinkovci | four lane dual carriageway, with grade separated intersections |
State roads are defined by legislation as important routes for road traffic between various parts of the country. Classification of a road as a state road does not describe actual conditions of the road itself.
State roads in Croatia are assigned one, two or three digit numbers which generally comply with the following pattern (although there are some exceptions to the rules):
At the moment the state roads in Croatia have a combined length of 6,867.7 kilometres (4,267.4 mi).
| Number | Control cities (or other appropriate route description) | Length |
|---|---|---|
| Gornji Macelj (A2) - Krapina - Zagreb - Karlovac - Gračac - Knin - Sinj - Split (D8) | 419.15 km | |
| Dubrava Križovljanska border crossing (Slovenia) - Koprivnica - Virovitica - Sveti Đurađ- Našice - Osijek - Vukovar - Ilok border crossing (Serbia) | 347.23 km | |
| Goričan border crossing (Hungary) - Hodošan (A4) - Čakovec - Varaždin - Breznički Hum - Popovec (A1) - Karlovac - Rijeka (D8) | 220.65 km | |
| Terezino Polje border crossing (Hungary) - Virovitica - Veliki Zdenci - Donji Daruvar - Lipik - Stara Gradiška border crossing (Bosnia and Herzegovina) | 123.19 km | |
| Jurovski Brod border crossing (Slovenia) - Ribnik - Karlovac - Brezova Glava - Vojnić - Glina - Dvor border crossing (Bosnia and Herzegovina) | 134.65 km | |
| Duboševica border crossing (Hungary) - Beli Manastir - Osijek - Đakovo - Slavonski Šamac border crossing (Bosnia and Herzegovina) | 115.26 km | |
| Pasjak border crossing (Slovenia) - Matulji - Rijeka - Zadar - Split - Pelješac - Dubrovnik - Karasovići border crossing (Montenegro) | 657.70 km | |
| Metković border crossing (Bosnia and Herzegovina) - Opuzen (D8) | 10.63 km |
| Number | Control cities (or other appropriate route description) | Length |
|---|---|---|
| Sveta Helena interchange (A4) - Cugovec - Križevci - Koprivnica - Gola border crossing (Hungary) | 85.35 km | |
| Zabrđe (D10) - Haganj - Zvonik - Bjelovar - Virovitica - Terezino Polje border crossing (Hungary) | 90.54 km | |
| Mokrice (D307) - Donja Zabočka - Bedekovičina - Selnica - Podgrađe (D29) | 17.42 km | |
| Čakovec (D3) – Prelog – Donja Dubrava – Đelekovec – Koprivnica (D2) | 50.4 km | |
| D3 - Novi Marof – Križevci – Sveti Ivan Žabno | 42.7 km | |
| Duga Resa (D3) – Josipdol – Žuta Lokva – Senj (D8) | 103.9 km | |
| Zabok (D1) – Zlatar Bistrica – Donja Konjšćina – Budinšćina – Novi Marof – Varaždinske Toplice – Poljanec (D2) | 72.4 km | |
| Korenica (D1) – Bunić – Lički Osik – Gospić – Karlobag (D8) | 83.6 km | |
| Dubrava (D10) - Čazma - Garešnica - Dežanovac - Daruvar (D5) | 88.5 km | |
| Gračac (D1) - Obrovac - Benkovac - Stankovci - D8 | 96.9 km | |
| Gradec (D10) - Bjelovar - Veliki Zdenci (D5) | 70.7 km | |
| Novi Golubovec (D35) - Zlatar Bistrica - Marija Bistrica - Soblinec (D3) | 49.8 km | |
| Buzin interchange (A3) - Velika Gorica - Petrinja - Hrvatska Kostajnica border checkpoint (Bosnia and Herzegovina) | 83.1 km | |
| Velika Gorica (D30) - Gornji Viduševac - D6 | 56.1 km | |
| Prezid border checkpoint (Slovenia) - Delnice (D3) | 49.7 km | |
| Strmica border checkpoint (Bosnia and Herzegovina) - Knin - Drniš - Vidici (D8) | 73.3 km | |
| Slatina (D2) - Donji Miholjac - Josipovac (D2) | 79.0 km | |
| Varaždin (D2) - Lepoglava - Sveti Križ Začretje (D1) | 46.0 km | |
| Karlovac (D1) - Pokupsko - Sisak - Popovača (Ž3124) | 110.5 km | |
| Sisak (D36) - Petrinja - Glina (D6) | 34.4 km | |
| Pakrac (D5) - Požega - Pleternica - Đakovo (D7) | 120.7 km | |
| Bosnian Border - Aržano - Cista Provo - Šestanovac roundabout - Dubci (D8) | 37.3 km | |
| Sveti Kuzam interchange (A7) - D8 - Port of Bakar (West) | 3.1 km | |
| Gola border checkpoint - Koprivnica - Križevci (D22) | 82.9 km | |
| Vrbovsko (D3) - Ogulin - Josipdol - Plaški - Grabovac (D1) | 57.9 km | |
| Đurđevac (D2) - Bjelovar - Čazma - Ivanić Grad interchange (A3) | 78.1 km | |
| Nova Vas interchange (A9) - Ponte Porton - Buzet - Lupoglav interchange (A8) | 50.5 km | |
| Veliki Zdenci - (D5) - Garešnica - Kutina interchange A3 | 43.6 km | |
| Đakovo D7 -Vinkovci - Tovarnik border checkpoint (Serbia) | 73.0 km | |
| Lipik (D5) - Novska - Hrvatska Dubica - Hrvatska Kostajnica - Dvor (D6) | 94.5 km | |
| Baderna interchange (A9) - Pazin - Rogovići interchange (A8) | 20.8 km | |
| Pleternica - Lužani interchange (A3) | 19.2 km | |
| Žuta Lokva (D23) - Otočac - Gospić - Gračac (D40) | 104.2 km | |
| Gradište (D53) - Požega - Nova Gradiška interchange (A3) | 50.3 km | |
| Špilnik (D50) - Korenica (D1) | 41.1 km | |
| Donji Miholjac border checkpoint (Hungary) - Našice - Slavonski Brod border checkpoint (Bosnia and Herzegovina) | 91.6 km | |
| Maslenica (D8) - Zaton Obrovački D27 | 13.5 km | |
| Borovo (D2) - Vinkovci - Županja border checkpoint (Bosnia and Herzegovina) | 48.6 km | |
| Tromilja interchange (D424) – Benkovac – Skradin – Drniš (D33) – Muć – Klis–Grlo interchange (D1) | 119.6 km | |
| Vukovar (D2) - Orolik - Nijemci - Lipovac interchange A3 | 36.1 km | |
| Šibenik (port) - Boraja - Trogir (D8) | 43.0 km | |
| Knin (D8) - Kistanje - Bribirske Mostine - Putičanje - Kapela (D8) | 53.9 km | |
| Brnaze (D1) - Trilj - Cista Provo - Imotski - Vinjani Donji border checkpoint (Bosnia and Herzegovina) | 66.1 km | |
| Šestanovac (D39) - Zagvozd - Vrgorac - Kula Norinska - Metković (D9) | 89.5 km | |
| Pazin (D48) - Potpićan - Vozilići (D66) | 26.9 km | |
| Pula (D400) - Labin - Opatija - Matulji (D8) | 90.1 km | |
| Slatina (D2) - Čeralije - Voćin - Novo Zvečevo - Kamenska (D38) | 53.4 km | |
| Omiš (D8) - Naklice - Gata - Blato na Cetini interchange (A1) | 21.6 km | |
| Slavonski Brod: D53 - Svačićeva - I. G. Kovačića - N. Zrinskog (D423) | 2.7 km | |
| Đurmanec (D207) - Krapina - Bednja - Lepoglava (D35) | 22.0 km | |
| D200 - Savudrija - Umag - Novigrad - Poreč - Vrsar - Vrh Lima - Bale - Pula (D400) | 101.7 km | |
| Baško Polje (D8) – Zagvozd (D62) – Grubine (D60) – Imotski – Gornji Vinjani border checkpoint (Bosnia and Herzegovina) | 28.3 km | |
| Rogovići interchange (A8) – Žminj – Svetvinčenat – Vodnjan (D75) | 33.2 km |
| Number | Control cities (or other appropriate route description) | Length |
|---|---|---|
| Porozina (ferry port) - Cres - Mali Lošinj (Ž5159) | 80.5 km | |
| D100 - Merag (ferry port) | 10.9 km | |
| Šmrika (D8) - Krk - Baška | 48.3 km | |
| D102 - Rijeka Airport | 1.7 km | |
| D102- Valbiska (ferry port) | 10.1 km | |
| Lopar (ferry port) - Rab - Mišnjak (ferry port) | 22.7 km | |
| Žigljen (ferry port) - Novalja - Pag - Ražanac - Posedarje (D8) | 73.8 km | |
| Veli Rat - Savar - Sali | 41.9 km | |
| Muline (ferry port) - Ugljan - Tkon (ferry port) | 41.6 km | |
| Maslinica - Grohote - Stomorska | 17.8 km | |
| Rogač (ferry port) - D111 | 1.9 km | |
| Supetar - Nerežišće - Sumartin (ferry port) | 39.4 km | |
| Milna - Sutivan - Supetar (D113) | 18.8 km | |
| Gornji Humac (D113) - Bol | 11.4 km | |
| Hvar - Milna - Starigrad (ferry port) - Sućuraj | 77.8 km | |
| Komiža - Podhum - Vis | 19.9 km | |
| Vela Luka - Kapja - Dubovo - Korčula | 43.5 km | |
| Ubli - Lastovo | 9.5 km | |
| Pomena - Polače - Sobra - Saplunara | 42.9 km | |
| Murter - Tisno - D8 | 14.0 km | |
| Sobra (ferry port) - D120 | 1.1 km | |
| Brbinj (ferry port) - Brbinj - D109 | 1.7 km | |
| Zaglav (ferry port) - D109 | 1.1 km | |
| Trogir (D315) - Arbanija - Slatine | 8.3 km | |
| Uvala Mikavica - Žirje (ferry port) | 3.8 km |
In the Republic of Croatia, primarily a closed toll system is applied to the entire motorway network tolls with multiple entrances and exits. The use of motorways is charged by mileage and vehicle category. At the entrance on the motorway, the user picks up the entrance card (or a record recorded on the ENC device) and the payment is made on exit toll stations according to the length of the trip. The open system is in use at toll stations Bregana(A3) and Rupa(A7).
The new electronic toll collection system Crolibertas is a strategic project with a completely different way of paying tolls. The Crolibertas system will be introduced on all motorways in the Republic of Croatia, operated by HAC), Bina-Istra and AZM. The Crolibertas toll collection system is based on the free flow of vehicles in multiple lanes (multi lane free flow – MLFF) with a combination of DSRC (ENC device) and ALPR (with cameras).
On 24 September 2024, Croatian Motorways signed a contract for the implementation of a new toll collection system with a consortium of bidders consisting of the Slovak company SkyToll and the Czech TollNet. The value of the contract is €79,913,480.52 excluding VAT, of which €64,167,383.70 relates to the design, construction and equipping of the toll collection system, and the rest relates to spare parts and a ten-year maintenance period for the system.
The system will consist of 208 toll booths on all highways, 140 fast lanes for registration and 74 mobile units (cars) for user supervision.
Croatia had 62 road deaths per million inhabitants estimated in 2025.