Flight model of F-1 | |
| Mission type | Technology demonstration |
|---|---|
| Operator | FPT University/Uppsala University |
| COSPAR ID | 2012-038E (1998-067CR) |
| SATCAT no. | 38855 |
| Mission duration | Failed to contact ground stations 100 days (planned) |
| Spacecraft properties | |
| Spacecraft type | CubeSat |
| Manufacturer | FPT University |
| Launch mass | 1 kg (2.2 lb) |
| Dimensions | 10 × 10 × 10 cm (3.9 × 3.9 × 3.9 in) (1U) |
| Start of mission | |
| Launch date | 21 July 2012, 02:06:18 UTC |
| Rocket | H-IIB F3 |
| Launch site | Tanegashima, Yoshinobu LC-Y2 |
| Contractor | Mitsubishi Heavy Industries |
| Deployed from | ISS Kibō Delivered by Kounotori 3 |
| Deployment date | 4 October 2012, 15:44:15.297 UTC |
| Entered service | Failed to contact ground stations |
| End of mission | |
| Decay date | 9 May 2013 |
| Orbital parameters | |
| Reference system | Geocentric orbit |
| Regime | Low Earth orbit |
| Inclination | 51.65° |
F-1 mission patch | |
F-1, formally known in Vietnam as Vệ tinh nano F-1 (lit. 'Nano satellite F-1'), was a Vietnamese CubeSat built by FSpace laboratory, FPT University in partnership with Angstrom Space Technology Center (ASTC), Uppsala University, Sweden and Nanoracks, an American company.

| No1 | Data | Description | Size (bits) | Size (chars) |
|---|---|---|---|---|
| 1 | F-1's callsign | "XV1VN" | 5 | |
| 2 | OBC1 reset count | Number of OBC1's reset since the beginning | 8 | |
| 3 | Temperature 1 | °C (temperature inside F-1, OBC board) | 8 | 5 |
| 4 | Temperature 2 | °C (temperature outside F-1, Y- side) | 8 | |
| 5 | Checksum bit | 0 if summary of items #2 to #4 is even, 1 if it is odd | 1 | |
| Total | 10 |
F-1's KISS packet format was as follows:
| No | Data | Description | Size (bit) |
|---|---|---|---|
| 1 | Date time | Date: dd/mm/y: 5/4/3=12 bits Time: hh/mm/ss: 5/6/6=17 bits | 29 |
| 2 | Battery voltage | Battery voltage multiplied by 100 (divide by 100 to get actual value) | 11 |
| 3 | Solar cells voltage | Solar cells voltage multiplied by 10 (divide by 10 to get actual value) | 8 |
| 4 | Temperature 1 | °C (side 1, Y+) | 8 |
| 5 | Temperature 2 | °C (side 2, Y-) | 8 |
| 6 | Temperature 3 | °C (side 3, X-) | 8 |
| 7 | Temperature 4 | °C (side 4, Z+) | 8 |
| 8 | Temperature 5 | °C (side 5, Z-) | 8 |
| 9 | Temperature 6 | °C (side 6, X+) | 8 |
| 10 | Temperature 7 | °C (inside side 5, Z-) | 8 |
| 11 | Temperature 8 | °C (inside, under VX-3R1) | 8 |
| Total | 112 bits = 14 bytes |
Note:
In late 2008, plans for a small satellite were submitted to FPT Software. In early 2009, FSpace laboratory was founded.
F-1 was initially planned to have a dimension of 10 × 10 × 30 cm (3.9 × 3.9 × 11.8 in) and a mass of 3 kg (6.6 lb). Later, the satellite's dimension and mass were revised to be 10 × 10 × 10 cm (3.9 × 3.9 × 3.9 in) and 1 kg (2.2 lb) respectively.
F-1 was planned to train young engineers and students about aerospace engineering and evaluate an advanced three-axis magnetometer, Spin-Dependent Tunneling Magnetometer (SDTM) designed in Sweden by ASTC.

Initially, F-1 was planned to be launched in late 2010.
F-1 was launched on 21 July 2012 and delivered to the International Space Station (ISS) aboard Kounotori 3 (HTV-3) along with the RAIKO, WE WISH, Niwaka and TechEdSat-1 cubesats. Then, on 4 October 2012, it was deployed into orbit from the ISS using the JEM-Small Satellite Orbital Deployer (J-SSOD) which was attached to the Kibō module's robotic arm.
As of 2 November 2012, F-1 failed to confirm communication after the orbital deployment.
F-1 decayed on 9 May 2013.
FSpace laboratory had planned a follow-up mission of F-1, called F-2. The F-2 satellite was expected to participate in the QB50 project, with a planned dimension and mass of 10 × 10 × 20 cm (3.9 × 3.9 × 7.9 in) and 2 kg (4.4 lb) respectively. However, F-2 was no longer listed in the QB50's website. It is unknown whether what happened with F-2, however, the project was possibly cancelled.