SES-8

SES-8
The SpaceX Falcon 9 rocket carrying the SES-8 communications satellite launches from Cape Canaveral SLC-40.
Mission typeCommunication
OperatorSES
COSPAR ID2013-071A Edit this at Wikidata
SATCAT no.39460
Websitehttps://www.ses.com/
Mission duration15 years (planned)
12 years, 11 months, 24 days (elapsed)
Spacecraft properties
Spacecraft typeGEOStar-2
BusSTAR-2.4
ManufacturerOrbital Sciences Corporation
Launch mass3,170 kg (6,990 lb)
Power5 kW
Start of mission
Launch date3 December 2013, 22:41:00 UTC
RocketFalcon 9 v1.1
Launch siteCape Canaveral, SLC-40
ContractorSpaceX
Entered serviceFebruary 2014
Orbital parameters
Reference systemGeocentric orbit
RegimeGeostationary orbit
Longitude95° East
Transponders
Band33 Ku-band
Bandwidth36 MHz
Coverage areaSouth Asia, India, Indo-China, Thailand, Vietnam, Laos
← SES-7
SES-9 →

SES-8 is a geostationary Communications satellite operated by SES SES-8 was successfully launched on SpaceX Falcon 9 v1.1 on 3 December 2013, 22:41:00 UTC.

It was the first flight of any SpaceX launch vehicle to a supersynchronous transfer orbit, an orbit with a somewhat larger apogee than the more usual geostationary transfer orbit (GTO) typically utilised for communication satellites.

Satellite description

The SES-8 satellite is built on the STAR-2.4 satellite bus by Orbital Sciences Corporation (OSC). It is the sixth satellite of that model to be built for SES.

The communications satellite is initially co-located at 95° East with NSS-6 in order to provide communications bandwidth growth capacity in the Asia-Pacific region, specifically aimed at high-growth markets in South Asia and Indo-China, "as well as provide expansion capacity for satellite television (direct-to-home - DTH), Very-small-aperture terminal (VSAT) and government applications".

Specifications

Launch vehicle

The launch of Falcon 9 v1.1 with SES-8 from Cape Canaveral on 3 December 2013.

The launch of SES-8 was the seventh launch of the Falcon 9 launch vehicle, and the second launch of the Falcon 9 v1.1. SES paid a discounted price — "well under US$60 million" — for the launch since it was the inaugural geostationary launch on the Falcon 9. When originally contracted, in 2011 the putative launch date was early 2013.

The launch was the second launch of the Falcon 9 v1.1 version of the rocket, a longer rocket with 60% more thrust than the Falcon 9 v1.0 vehicle, and the first launch of the larger v1.1 rocket using the rebuilt erector structure at SpaceX' Cape Canaveral SLC-40. As a result, a number of systems on the launch vehicle was flown for only the second time, while several parts of the ground infrastructure at Cape Canaveral were used in a launch for the first time. These include:

In order to maximize the propellant available for the launch of SES-8 into geostationary transfer orbit (GTO), SpaceX did not attempt a controlled descent test of the first-stage booster as they did on the previous Falcon 9 v1.1 flight in September 2013.

Second-stage reignition

In the previous launch of the Falcon 9 v1.1 — the first launch of the much larger version of the rocket with new Merlin 1D engines — on 29 September 2013, SpaceX was unsuccessful in reigniting the second stage Merlin 1D vacuum engine once the rocket had deployed its primary payload (CASSIOPE) and all of its nanosat secondary payloads. The restart failure was determined to be frozen igniter fluid lines in the second-stage Merlin 1D engine. A minor redesign was done to address the problem by adding additional insulation to the lines.

A second burn of the upper stage was required, and was completed successfully, during the SES-8 mission in order to place the SES-8 telecommunications satellite into the highly elliptical supersynchronous orbit for satellite operator SES to effect a plane change and orbit circularisation.

The Falcon 9 upper stage used to launch SES-8 was left in a decaying elliptical low Earth orbit which, by September 2014, had decayed and re-entered the atmosphere of Earth.

Prelaunch

Both stages of the Falcon 9 arrived at Cape Canaveral for processing before 2 October 2013, after both had trouble-free test firings at the SpaceX Rocket Development and Test Facility at McGregor, Texas. A launch attempt on 25 November 2013, with a planned liftoff at 22:37:00 UTC was scrubbed following a reported off-nominal condition in the liquid oxygen tank and supply lines of the first-stage booster that could not be resolved within the approximately one-hour launch window. A launch date of 28 November 2013 was announced, three days later, being the next opportunity for the launch site on Earth to be in alignment to achieve the target orbit.

Launch attempts

AttemptPlannedResultTurnaroundReasonDecision pointWeather go (%)Notes
125 Nov 2013, 10:37:00 pmHold and countdown restart—Launch delay25 Nov 2013, 10:24 pm ​(T–00:13:00)80%Launch window: 22:37–23:43 UTC
225 Nov 2013, 10:54:00 pmHold and countdown restart0 days 0 hours 17 minutesAutomatic abort25 Nov 2013, 10:47 pm ​(T–00:06:11)80%Launch window: 22:37–23:43 UTC
325 Nov 2013, 11:30:00 pmScrubbed0 days 0 hours 36 minutesOff-nominal condition25 Nov 2013, 11:26 pm ​(T–00:03:41)80%Launch window: 22:37–23:43 UTC
428 Nov 2013, 10:39:00 pmHold and countdown restart2 days 23 hours 9 minutesAutomatic abort28 Nov 2013, 10:38 pm ​(T–00:00:30)90%Launch window: 22:39–23:44 UTC
528 Nov 2013, 11:44:00 pmScrubbed0 days 1 hour 5 minutesData review not completed28 Nov 2013, 11:43 pm ​(T–00:00:48)90%Launch window: 22:39–23:44 UTC
63 Dec 2013, 10:41:00 pmSuccessful launch4 days 22 hours 57 minutes90%Launch window: 22:41–00:07 UTC

See also