| History | |
|---|---|
| Name | GO 59 |
| Builder | Cantiere Navale Giacalone di Mazara del Vallo (Trapani) |
| Cost | €7 million |
| Laid down | 2013 |
| Launched | 2014 |
| Acquired | 2011 |
| Commissioned | march 2014 |
| In service | 1 |
| Home port | Brindisi |
| General characteristics | |
| Type | Floating dry dock |
| Length |
|
| Beam |
|
| Draught | 8.0 m (26 ft 3 in) (max) |
| Draft | 9.5 m (31 ft 2 in) (max) |
| Notes | lifting capability 1.000 t (0.984 long tons) |
GO 59 is a Floating dry dock of the Marina Militare.
Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014, it was transferred to Stazione Navale di Brindisi on 24 February 2016.
These are the technical specifications of MM for its realization.