| Golden Hills Wind Project | |
|---|---|
![]() | |
| Country | United States |
| Location | Sherman County, Oregon |
| Coordinates | 45°35′21″N 120°44′12″W / 45.58917°N 120.73667°W |
| Status | Commissioned 2022 |
| Owner | BP Alternative Energy |
| Power generation | |
| Units operational | 41 x 4.3 MW Vestas V150 10 x 2.5 MW GE 116 |
| Nameplate capacity | 200 megawatts |
Golden Hills Wind Project is a electricity generating wind farm facility in Sherman County, Oregon. The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021. It began operation in 2022.