This article needs more citations. (November 2022) |
Hama-Taura Station 浜田浦駅 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Hama-Taura Station Waiting room | |||||||||||
| General information | |||||||||||
| Location | Mukawa Hokkaido Prefecture Japan | ||||||||||
| Operator | |||||||||||
| Line | Hidaka Main Line | ||||||||||
| Platforms | 1 side platform | ||||||||||
| Tracks | 1 | ||||||||||
| Construction | |||||||||||
Structure type | At grade | ||||||||||
| History | |||||||||||
| Opened | 18 December 1959 | ||||||||||
| Closed | 18 March 2023 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Hama-Taura Station (浜田浦駅, Hama-Taura eki) was a railway station on the Hidaka Main Line in Mukawa, Hokkaidō, Japan, operated by the Hokkaido Railway Company (JR Hokkaido).
Some trains pass through this station, but a total of 12 trains stop here each day.
2021 In July, JR Hokkaido notified Mukawa Town of its intention to abolish this station in agreement with the residents. According to a JR survey, the average number of passengers per day at the station was 2 from 2016 to 2020, and 1 in 2021. According to Mukawa Mayor Yoshiyuki Takenaka, he revealed at the regular town assembly that JR Hokkaido told him that the station was scheduled to be abolished on April 1, 2023.
42°35′26″N 141°53′01″E / 42.5906°N 141.8836°E