| Hoopeston Wind Farm | |
|---|---|
![]() | |
| Country | USA |
| Coordinates | 40°22′59″N 87°47′17.9″W / 40.38306°N 87.788306°W |
| Status | Active |
| Owner | Apex Wind Energy |
| Wind farm | |
| Type | |
| Rotor diameter | diameter 100 m |
| Power generation | |
| Units operational | 49 x 2.0 mW |
| Make and model | Vestas V100/2000 |
| Storage capacity | 98 MW |
The Hoopeston Wind Farm is a 49-turbine wind farm in northern Vermilion County in Illinois. Investment capital for the project was organized by IKEA, which did so to earn clean-energy tax credits for the stores that it operates. IKEA hired Apex Clean Energy to build the complex.
The Hoopeston complex's 49 wind turbines, each rated at 2.0 mW, can generate up to 98.0 megawatts of electricity. The Hoopeston-area project was constructed by Apex Clean Energy, and became operational in 2015.