The Oil & Gas Journal publishes an annual worldwide oil refinery survey that provides plant-by-plant data, including refinery location, crude oil processing capacity, and major process unit capacities. The survey is widely used as an industry reference for refinery information and capacity data.
Global summary
As per Energy Institute and OPEC data from 2024.
Global oil refining capacity by country (2024 estimates)
Country
Amount (million bpd)
Percentage of global capacity
Notes
China
18.48
17.8%
Overtook the U.S. as the world's largest refiner by capacity in 2023.
United States
18.43
17.7%
Maintains the highest actual throughput and complex secondary processing.
Russia
6.80
6.6%
Capacity largely focused on diesel exports; current runs impacted by sanctions.
India
5.80
5.6%
Fastest growing regional hub; operates the massive Jamnagar complex.
Skikda Refinery I (Sonatrach), 356,500bbl/d (56,680m3/d) – built in 2009; processing capacity 16.5 million tonnes per year
Skikda Condensate Refinery II (Sonatrach), 122,000bbl/d (19,400m3/d) – start-up 1980; processing capacity around 5 million tonnes per year
Adrar Refinery (PetroChina, CNPC/Sonatrach), 13,000bbl/d (2,100m3/d) – built in 2007 (0.6 million tonnes/year)
Sidi Rezine Refinery (Sonatrach), El Harrach, Algiers77,000bbl/d (12,200m3/d) – shutdown in 2018 for modernization, restarted in 2020; refining capacity 3.6545 million of tonnes per year
Arzew Refinery (Sonatrach), 81,000bbl/d (12,900m3/d) – start-up 1975; processing capacity of 780,000 tones of naphtha per year (3.75 million tonne/year)
Hassi Messaoud Refinery (Sonatrach), 23,000bbl/d (3,700m3/d) – Algerian government awarded engineering, procurement, and construction (EPC) contract to Técnicas Reunidas and Samsung Engineering January 2020; construction began February 2025;commissioning 2026–27; processing capacity 5 millions tonnes of crude oil per year
Tiaret Refinery (Sonatrach), 100,000bbl/d (16,000m3/d) – delayed from 2022 to 2025
Biskar Refinery (Sonatrach SPA), 5 million tons of crude oil per year – in development as of 2017
Angola
Luanda Refinery (Sonangol – opened 1958), 72,000bbl/d (11,400m3/d)
Cabinda Refinery (Gemcorp Capital), 60,000bbl/d (9,500m3/d) – international tender 2017, under construction 2024–25; planned final capacity by the end of 2026
Soyo Refinery (Quanten Consortium Angola), 100,000bbl/d (16,000m3/d) – public tender for construction in 2019–20, contract awarded in early March 2021, in financing stage in 2025
Lobito Refinery (Sonangol 30%/KBR 70%), Lobito, Benguela Province, 200,000bbl/d (32,000m3/d) – in development as of August 2016 – November 2017, under construction in 2024–26
Malongo Topping Plant (Cabinda Gulf Oil Company), 15,000bbl/d (2,400m3/d) – operational as of 2024
Cameroon
Limbé Refinery (Sonara – started in 1976), formerly 42,000bbl/d (6,700m3/d) – fire broke out on May 31, 2019 following an explosion in the naphtha separation unit, damaging four of the thirteen production units and forcing a total suspension of operations; site being refurbished since 2021 and to open by late 2027
Kribi Refinery, Lolabé30,000bbl/d (4,800m3/d) – to start partial operations in 2026
Chad
Djarmaya Refinery (Societe d'Etude et d'Exploitation de la Raffinerie (SEERAT)), 20,000bbl/d (3,200m3/d) – opened June 2011
Fouta Refinery (Atlantic Petrochemical Refinery/Beijing Fortune Dingheng Investment/Sinopec), 110,000bbl/d (17,000m3/d) – to be completed by 2025–26 (2.5 million tones of petroleum products per year)
Democratic Republic of the Congo
Muanda Refinery (formerly SOCIR), formerly 15,000bbl/d (2,400m3/d) – not in working order since 1998–2000
Egypt
Amreya Refinery (Amreya Petroleum Refining Company (APRC)), Alexandria, 80,000bbl/d (13,000m3/d) – operational 1972; 3–4 million tons of crude oil per year (around 15% of Egypt's total refining capacity in FY2019-20)
Alexandria Refinery (Alexandria Petroleum Company), Alexandria, 100,000bbl/d (16,000m3/d) – refined about 3.8 million tons of crude oil in fiscal year 2023/24, refined more than 3.5 million tons of crude oil in fiscal year 2024/25
MIDOR (Middle East Oil Refinery), Ameriya Specialized Free Zone, Alexandria, 100,000bbl/d (16,000m3/d) – established 1994; plans to expand by 60,000bbl/d (9,500m3/d) by first quarter 2022
Assiut Refinery (Assiut Oil Refining Company (ASORC)), 90,000bbl/d (14,000m3/d) – built 1987
Mostorod Refinery (Egypt Refining Company (ERC)), Cairo, 161,000bbl/d (25,600m3/d) – financial closure of project (June 2012); construction began February 2014; began operating August 2019 – September 2020 with a processing capacity of 4.7 million tonnes per annum
Ain Soukhna Refinery (Red Sea National Refining and Petrochemicals Company), 208,000bbl/d (33,100m3/d) – signed agreement (April 2021) to build in Suez Canal Economic Zone, construction to be finished by 2024–28
Eritrea
Assab Refinery, formerly 18,000bbl/d (2,900m3/d) – built 1967; shut down August 1997
Ethiopia
Gode Refinery (Golden Concord Group), 70,000bbl/d (11,000m3/d) – started construction in late 2025, first phase to be completed within 24 months
Gabon
Port Gentil Refinery I (Sogara/Total/Shell/Agip), Ogooue Maritime21,000bbl/d (3,300m3/d)NCI 8.3 – construction started 1965; operational 1967; routinely operates below capacity because of maintenance issues; temporarily shut down in August–September 2016 due to disputed presidential election of Ali Bongo and in 2017 for maintenance; annual processing capacity around 8.8 million barrels – went from processing 110 tonnes (806 barrels) per hour in September 1969 to 155 tonnes (1,136 barrels) per hour in 2016
Port Gentil Refinery II (Gabon Oil Company/Samsung C&T), 60,000bbl/d (9,500m3/d) – to be almost fully automated; being developed as of 2019
Ghana
Tema Oil Refinery Limited (TOR – Ghana Government), 45,000bbl/d (7,200m3/d) – incorporation & construction 1960–63 and was originally owned 100% by ENI Group, then purchased (Ghanaian Italian Petroleum Company) by Ghana in April 1977; changed to current name in 1990–91; shutdown for six years (2017–25) after fire – three-month Turnaround Maintenance program August–October 2025; resumed operation December 2025
Sentuo Oil Refinery Limited (SORL), Tema Industrial Zone, 100,000bbl/d (16,000m3/d) – conceived from Chinese government's Belt and Road Development Strategy and completed October 2022 – January 2024; capacity approximately five million tons per year processed crude oil
Platon Gas Oil Ghana Refinery LTD, Greater Accra region, Tema 3,000bbl/d (480m3/d) – built 2013; modernization started 2017; operates inconsistently
Ivory Coast
Abidjan Refinery I (Societe Ivoirienne de Raffinage (SIR) – Petroci 47.2%, Total 10.3%, Elf 15.1%, Shell 10.3%, Mobil 8%, Burkina Faso 5.4% and Texaco 3.7%) 100,000bbl/d (16,000m3/d)Nelson Complexity Index 6.1 – opened 1963–65, re-started in 1980; previously damaged by fire but fully-repaired and operations seriously disturbed by strike in 1994; refining capacity over 3 million metric tonnes per year
Abidjan Bitumen Refinery (SMB Cote d'Ivoire, formerly Societe Multinationale de Bitumes SA), 10,500bbl/d (1,670m3/d) – founded March 1976 and co-located with above refinery; capacity 525,000 tons of crude oil per year
Yaatra Ventures Refinery, 170,000bbl/d (27,000m3/d) – planned as of April 2025
Kenya
KPRL Refinery (originally set up by Kenya Government (50%)/Shell(17.1%)/BP(17.1%)/Chevron(15.8%) as East African Oil Refineries Limited, previously owned by Kenya Government (50%)/Essar Energy of Mumbai, India(50%)), Mombasa, formerly 32,000bbl/d (5,100m3/d), Nelson Complexity Index 2.64 – incorporated 1959–60 – Complex I commissioned 1963–64 and Complex II in 1974; nameplate capacity was 4 million metric tons per year but operated below that (around 1.6 million tons per year); operations halted in September 2013 after abandoned, economically unviable 2012 expansion plans; government took over in 2016 and was converted to storage terminal facility
Mombasa Refinery II, 650,000bbl/d (103,000m3/d) – proposed 2026
Liberia
VFuels LLC Modular Refinery (Conex Petroleum Group Inc., Conex Group JV Limited/Liberian Petroleum Refinery Company (LPRC)), Monrovia, 10,000bbl/d (1,600m3/d) – started April 2019, acceptance test March 2020 at existing 55,000-tonne petroleum storage terminal that was commissioned in 2016; refinery to be commissioned by 2021
Libya
Zawiya Refinery (Zawia Oil Refining Company, National Oil Corporation (NOC)), 120,000bbl/d (19,000m3/d) – started 1974 at 60,000bbl/d (9,500m3/d), second twin processing plant added 1977; asphalt plants opened 1980–84 with total output of 200,000 tons per year; resumed operations October 2020 after blockade against oil exports; to be upgraded
Ras Lanuf Refinery (Ras Lanuf Oil & Gas Processing Company, NOC), formerly 220,000bbl/d (35,000m3/d) – completed 1984; NOC and Trasta Consortium (United Arab Emirates) signed upgrade agreement to expand to 240,000bbl/d (38,000m3/d);significantly damaged by anti-government protests during 2011 Libyan Civil War; closed since 2013 due to arbitration which was settled in February 2022 and negotiations regarding sale of remaining 50% stake ongoing, refinery rehabilitation by NOC needed to bring back into operation
El-Brega Refinery (Sirte Oil Company, NOC; formerly in partnership with ExxonMobil), formerly 90,000bbl/d (14,000m3/d) – production dropped by almost 90% (down to around 11,000bbl/d (1,700m3/d)) amid 2011 Libyan Civil War
Al-Sarir Refinery (Sarir Refining, Arabian Gulf Oil Company (AGOCO), NOC), 10,000bbl/d (1,600m3/d) – back online late 2020 after blockade against oil exports; major overhaul completed January–February 2026, resumed operations after planned shutdown and safety tests
Tobruk Refinery (Tobruk Refining, AGOCO, NOC), 20,000bbl/d (3,200m3/d) – resumed operations at end of 2020 after blockade of oil exports and returned to full capacity October 2020
Tobruk Refinery II, 300,000bbl/d (48,000m3/d) – being proposed
Note: Libya's refining sector reportedly impacted by UN sanctions, specifically UN Resolution 883 of November 11, 1993, which banned Libya from importing refinery equipment.
Madagascar
Toamasina Refinery (Galana Petroleum), formerly 12,000bbl/d (1,900m3/d) – established 1966;destroyed in 1994 Cyclone Geralda
Mauritania
Nouadhibou Refinery (SOMIR), 20,000bbl/d (3,200m3/d) – typically runs at one-quarter capacity
Morocco
Mohammedia Refinery (Société Anonyme Marocaine de l'Industrie du Raffinage (SAMIR)/Corral Petroleum Holdings (62+% – Sheikh Mohamed Houssein El Amoudi)), formerly 200,000bbl/d (32,000m3/d) – established 1959–61; upgraded 1962–78; privatized (bought by Morocco Corral Group) May 1997; shutdown after fire caused by flood from Oued El Malach dam November 2002; upgraded 2012; closed August 2015, declared bankrupt and ordered liquidated March 2016, turned into a storage facility 2020–23, SONAGRE to assume control of SAMIR January 2026 with eventual upgrade plans to 240,000bbl/d (38,000m3/d)
Jorf Lasfar Refinery (SAMIR/International Petroleum Investment Company (IPIC)), 250,000bbl/d (40,000m3/d) – planned – contract signed with Tekfen Construction and Installation Company for construction to begin April 2011
Kaduna Refinery (Kaduna Refining and Petrochemicals Company (KRPC) since 1988, Nigerian National Petroleum Corporation (NNPC)), Kaduna State, formerly 110,000bbl/d (17,000m3/d) – construction contract awarded 1977; fuels plant commissioned 1980; lubes plant commissioned 1983 (first of its kind in West Africa); petrochemical plant commissioned 1988; fuels plant to current capacity December 1986; 30,000 metric ton/year Linear AlkylBenzene Plant of petrochemical plant commissioned March 1988 then merged to become KRPC; Turn Around Maintenance (TAM) 2013; closed January 2018 due to unavailability of crude oil; 2020–23 rehabilitation effort; presently (April 2026) inactive
Port Harcourt Refinery (Port Harcourt Refining Company (PHRC), NNPC), Rivers State, formerly 210,000bbl/d (33,000m3/d) – commissioned 1965 (initially capacity 35,000bbl/d (5,600m3/d), "debottlenecked" to 60,000bbl/d (9,500m3/d) 1972); additional refinery (capacity 150,000bbl/d (24,000m3/d)) commissioned 1989; TAM 1992, 1994 and 2000; major maintenance intervention 2015; 2020–23 planned shutdown for rehabilitation work, resumed operating November 2024 at partial (60,000bbl/d (9,500m3/d)) capacity after over three years; shutdown May 2025, presently (April 2026) inactive
Warri Refinery (Warri Refining and Petrochemicals Company Limited (WRPC), NNPC), Warri, Delta State, formerly 125,000bbl/d (19,900m3/d) – commissioned 1978; at current capacity 1987; merged with Ekpan Petrochemical Plants November 1988 to form WRPC; TAM 1989, 1994 and 2000 – production declined steadily except in the early 1990's; 2015 closure based on disrepair and crude oil shortages; 2020–23 rehabilitation effort, back online in December 2022 (shutdown weeks later) and December 2024 at 60% capacity; shutdown January 2025; presently (April 2026) inactive
Waltersmith Refinery (Waltersmith Refining and Petrochemical Company, Waltersmith Petromen Oil (70%)/Nigerian Content Development and Monitoring Board (NCDMB – 30%)), Ohaji-Egbema Local Government Area, Ibigwe, Imo State, 10,000bbl/d (1,600m3/d) since April 2026 – operations started November 2020 at 5,000bbl/d (790m3/d) with planned capacity of 50,000bbl/d (7,900m3/d)
Azikel Refinery (Azikel Petroleum, Azikel Group), Obunagha, Gbarain, Yenagoa, Bayelsa State, 12,000bbl/d (1,900m3/d)Nelson Complexity Index 5.3 – ground-breaking ceremony February 2018, under construction since 2016, estimated completion 2025
Ogbele Refinery (Niger Delta Petroleum Resources Limited (NDPR), Niger Delta Exploration & Production Plc (NDEP)), Ogbele, Rivers State, 1,000bbl/d (160m3/d) Nelson Complexity Index 1 – commissioned December 2010
Ondo State Refinery (Backbone Infrastructure Nigeria Limited (BINL)/NEFEX Holdings Limited), 500,000bbl/d (79,000m3/d) – planned
Senegal
Dakar Refinery (Société Africaine de Raffinage (SAR)), Mbao, 127,000bbl/d (20,200m3/d) – started 1961 (West Africa's oldest refinery), processes around 1.5 million tons of crude per year
Rufisque Refinery (SAR 2.0/Sedin Engineering, China National Engineering) – planned, agreement signed September 2024, construction to start 2026; 4 million tons of annual processing capacity; expected to start production 2029
Somalia
New Silk Refinery (Singapore New Silk Somaliland Energy Co. Ltd. (SNSSEC)/China Power), Berbera District, 50,000bbl/d (7,900m3/d) – 300,000+ gallons of diesel per day, construction begun 2019, opening 2028
Jasiira Refinery, 10,000bbl/d (1,600m3/d) – built in the late 1970s; Iraqi oil delieries halted at start of Iran-Iraq War; re-opened 1989 with erratic Iraqi crude oil imports
Mogadishu Refinery, 200,000bbl/d (32,000m3/d) – agreement signed with Industrial Export, Import, and Foreign Trade Company of Romania in May 1989, never built as of 1992
Mogadishu Refinery II, at least 50,000bbl/d (7,900m3/d) – deal to be finalized and construction to begin by 2027–28
South Africa
Astron Energy Refinery (Astron Energy, Glencore South Africa Oil Investment (Pty) Ltd., since 2017), Milnerton, 100,000bbl/d (16,000m3/d) – opened 1966; restarted operations May 2023 after an extended shutdown following an explosion in July 2020
Engen Refinery (Engen Petroleum/Vivo Energy (74%), since May 2024, Vitol), Durban, formerly 120,000bbl/d (19,000m3/d) – started operating 1954; permanently closed since a December 2020 fire and explosion; converted to an import and storage terminal
SAPREF (South African Petroleum Refineries) Refinery (Central Energy Fund (CEF), since May 2024/Sapref), Durban, KwaZulu Natal, formerly 180,000bbl/d (29,000m3/d)Nelson Complexity Index 8.44 – started operating 1963; shutdown operations at end of March 2022 after severe flooding and an oil leak damaged the facility; planned restart possible as of April 2026
Mossel BayGTL Refinery (PetroSA), formerly 45,000bbl/d (7,200m3/d) – 2020 shutdown due to insufficient natural gas supplies; December 2023 plans with Gazprombank to restart refinery, final investment decision not yet announced
South Sudan
Tharjiath Refinery (Nilepet (30%)/Quad Layer Holdings (70%)), Unity State – proposed, feasibility studies to be done, Shengli Oilfield Keer Engineering and Construction Company (SOKEC) signed MoU to build refinery & storage facilities in November 2025
Bentiu Refinery (Safinat/Nilepet), 3,000bbl/d (480m3/d) – under construction with limited progress made
Upper Nile Refinery (Government of South Sudan), Tangrial, 10,000bbl/d (1,600m3/d) – planned but suspended
Sudan
El Obeid Topping Plant (El Obeid Refinery Company – Sudapet), formerly 10,000bbl/d (1,600m3/d) – looted after outbreak of war in April 2023
al-Jaili Refinery (Sudan Khartoum Refinery Company - Sudapet 50%/China National Petroleum Corporation (CNPC - 50%)), formerly 100,000bbl/d (16,000m3/d) – online May 2000; August 2003 – June 2006 expansion to current capacity; partially destroyed after outbreak of war in April 2023
Port Sudan Refinery (Port Sudan Petroleum Refinery Limited – Sudapet), Port Sudan, Al Bahr Al Ahmar, formerly 21,700bbl/d (3,450m3/d) – opened 1964; Memorandum of Understanding signed to rehabilitate and upgrade refinery in April 2013; decommissioned
Shajirah Topping Plant (Concorp), formerly 10,000bbl/d (1,600m3/d) – not operating
Abu Gabra Topping Plant (Sudapet), formerly 2,000bbl/d (320m3/d) – not operating
Tanzania
Dar es Salaam Refinery (TIPER – Government of United Republic of Tanzania (Treasury Registrar)/Oryx Energies SA), formerly 17,000bbl/d (2,700m3/d) – built 1966; ceased operations 1999-2000, turned into a storage terminal
Tanga Refinery, 650,000bbl/d (103,000m3/d) – proposed April 2026, to be delivered within 4–5 years
Tunisia
Bizerte Refinery (Société Tunisienne des Industries de Raffinage (STIR), started 1961), Zarzouna, Bizerte, 34,000bbl/d (5,400m3/d) – construction started 1961; production started 1963; revamped 1979, 1984, 1989 and 1997; expansion planned (in study phase in 2021) by the end of 2025
La Skhira Refinery (Qatar Petroleum), 120,000bbl/d (19,000m3/d) – prequalification tender process ended by June 2006–07; construction initially to begin by 2007–08; build-own-operate-transfer contract signed May 2021; capacity to eventually be increased to 150,000bbl/d (24,000m3/d)
Indeni Petroleum Refinery (Indeni Petroleum Refinery Limited (IPRL), Industrial Development Corporation (IDC), Zambian Government, since November 2009), Ndola City, formerly 25,000bbl/d (4,000m3/d) – commissioned 1973; ended refining July 2022
Ndola Refinery II (IDC/Fujian Xiang Xin Holding Company Limited, Zambia Petrochemical Energy Company Limited (ZPEC)), Ndola, Copperbelt, 60,000bbl/d (9,500m3/d) – memorandum of understanding signed 2025, Investment Promotion and Protection Agreement signed May 2026, construction ongoing, to be operational 2027–28
Tahe Integrated Refining and Chemical Complex (Sinopec), Xinjiang – crude oil processing capacity 5 million metric tons per year; to be upgraded by 2029
Tuban Refinery and Petrochemical Complex (PT Pertamina Rosneft Pengolahan dan Petrokimia, Pertamina 55%/Rosneft 45%), East Java province, 300,000bbl/d (48,000m3/d) – Joint Venture Agreement signed October 2016; under construction
Pemping Refinery and Petrochemicals (Pertamina-ExxonMobil), 500,000bbl/d (79,000m3/d)[citation needed]
Osaka Refinery (Nippon Oil, since April 2002), Takaishi City, Osaka Prefecture, formerly 115,000bbl/d (18,300m3/d) – started 1970–71; expanded 1992, 1993, 1998 and 2003–04; closed 2020, converted to asphalt-fired power plant
Shymkent Refinery (PetroKazakhstan, CNPC 50%, since 2000/KazMunaiGaz 50%), 105,000bbl/d (16,700m3/d) – commissioned 1985; upgraded 2012–14 and in 2017; plans to double its processing capacity to more than 90 million barrels/year as of June 2023
Malaysian Refining Company Sdn Bhd (MRCSB) (Petronas), Melaka, 300,000bbl/d (48,000m3/d)
PSR-1, Melaka I Refinery (formerly known as Petronas Penapisan (Melaka) Sdn Bhd) (Petronas), 100,000bbl/d (16,000m3/d)
PSR-2, Melaka II Refinery (formerly operated by Petronas and Phillips 66 Joint Venture) (Petronas), 100,000bbl/d (16,000m3/d)
Petronas Penapisan (Terengganu) Sdn Bhd (PP(T)SB) (Petronas), Kerteh, 124,000bbl/d (19,700m3/d)
Hengyuan Refining Company Berhad (formerly known as Shell Refining Company (Federation of Malaya) Berhad) (HRC), Port Dickson, 155,000bbl/d (24,600m3/d) – built 1963
Port Dickson Refinery (Petron), Port Dickson, 88,000bbl/d (14,000m3/d)
PearlGTL Refinery – launched 2006, set to be the world's largest plant, converting natural gas into 140,000bbl/d (22,000m3/d) of clean-burning liquid transport fuel and other products and 120,000bbl/d (19,000m3/d) of oil equivalent per day of natural gas liquids and ethane
Yanbu' JV Refinery (Saudi Arabian Oil Company, Saudi Aramco/Mobil Yanbu Refining Company Inc., ExxonMobil, Saudi Aramco Mobil Refinery Company Limited (SAMREF)), Yanbu Al-Sinaiyah, 400,000bbl/d (64,000m3/d) - commissioned 1984; upgraded 2009-13
Jubail Refinery (Saudi Aramco Total Refining & Petrochemical Company (SATORP) - Saudi Arabian Oil Company, Saudi Aramco - 62.5%/Total - 37.5%), Jubail Industrial City, 465,000bbl/d (73,900m3/d) - Memorandum of Understanding signed for proposed, new export refinery 2006; project completed 2013
Yanbu' Refinery (Saudi Aramco - 62.5%/China Petrochemical Corporation (Sinopec Group - 37.5%), since 2011, Yanbu Aramco Sinopec Refining Company (YASREF)), 400,000bbl/d (64,000m3/d) - upgraded 2006-14
La Mède Refinery (Total), Provence, formerly 155,000bbl/d (24,600m3/d) – explosion November 1992 and shutdown for several months; closed 2015–16; converted to biorefinery, reopened 2019
Petit Couronne Refinery (Petroplus, since 2007), Petit Couronne, formerly 162,000bbl/d (25,800m3/d) – started 1929; closed 2011-12
Ruhr Öl Refinery (BP), 266,000bbl/d (42,300m3/d) Nelson Complexity Index 8.44
Ingolstadt Refinery (The Carlyle Group and Vitol, Varo Energy – 45%/Bayernoil -55%, previously Erdoelraffinerie Ingolstadt A.G. (ERIAG)), Bavaria, formerly 80,000bbl/d (13,000m3/d) Nelson Complexity Index 7.20 – commissioned 1964 at 50,000bbl/d (7,900m3/d); upgraded and expanded in 1974, 1978 and 1980; closed down 2008
Ingolstadt Refinery (Gunvor Raffinerie Ingolstadt GmbH, Gunvor, since 2012), Ingolstadt, 110,000bbl/d (17,000m3/d) Nelson Complexity Index 7.3 – commissioned 1963; closed February 2012; re-started August 2012
Elbe Mineralölwerke Hamburg-Harburg Refinery (previously Shell Deutschland Oil GmbH, Shell – sold to Nynas AB in 2013), Hamburg, 110,000bbl/d (17,000m3/d) – commissioned 1929; upgraded 2009; to be closed and converted into a terminal in 2012
Neustadt an der Donau-Vohburg Refinery, (Bayernoil Raffineriegesellschaft mbH (Varo Energy B.V. – 45%, since 2013–14/Rosneft, since 2010/Eni – 20%)), Bavaria, 206,000bbl/d (32,800m3/d) Nelson Complexity Index 6.8 – operations began 1967; upgraded 2007–09
Augusta Refinery (Raffineria Siciliana Oli Minerali (RASIOM)), Sicily, 100,000bbl/d (16,000m3/d) – online 1965
Impianti Nord Refinery (Lukoil/Erg), 160,000bbl/d (25,000m3/d)
Sannazzaro de' Burgondi Refinery (Eni's Refining & Marketing division), Turin-Milan-Genoa industrial triangle, Po Valley, 180,000bbl/d (29,000m3/d) – built 1963, original annual capacity five million tonnes, then capacity doubled by 1975, revamped 1988–92 and upgraded 2004–09; further 23,000bbl/d (3,700m3/d) upgrade proposed in 2006–07 and planned by 2011–12
Taranto Refinery (Eni), 120,000bbl/d (19,000m3/d) – began operation 1967, processing capacity of 6.5 million tonnes of crude oil; upgraded 2009; emergency flares activated in 2015 and January 2016
Livorno Refinery (Eni), formerly 85,000bbl/d (13,500m3/d) – crude processing being stopped in 2022[citation needed]
Porto MargheraVenice Refinery (Eni S.p.A., since 1978), formerly 70,000bbl/d (11,000m3/d) – started 1926; expanded 1934; reconstructed after WWII in 1947; upgraded 1968 and 1989; closed, converted into a green bio-refinery in 2012-14, restarted production of Green Diesel from vegetable oils in 2014-15
Cremona Refinery (Tamoil, since 1988), Po Valley, formerly 96,000bbl/d (15,300m3/d) – commissioned 1965; upgraded 1982; closed 2011, converted into a terminal
Gela Refinery (Eni), formerly 100,000bbl/d (16,000m3/d) – closed, being converted into biorefinery[citation needed]
Rome Refinery (Total 49%/ERG 51%, since 2010), Rome, formerly 86,000bbl/d (13,700m3/d) – commissioned 1965; revamped 1990; closed 2012, to be converted to a terminal
Botlek Refinery (Esso Nederland BV, ExxonMobil), Rotterdam, 190,000bbl/d (30,000m3/d) - built late in the 1950s; upgraded 2016-18
Zeeland Refinery (Total – 55%/Lukoil – 45%, since 2009), Industrial East Flushing, 190,000bbl/d (30,000m3/d) Nelson Complexity Index 9.8 – startup of refinery 1973; upgraded 1986
Gunvor Refinery (Gunvor Energy Rotterdam (GER), since January 2023, Gunvor, since 2016), Europoort, Port of Rotterdam, formerly 75,000bbl/d (11,900m3/d) – crude processing stopped 2020[citation needed]
VPR Refinery (Vitol) (in escrow), 80,000bbl/d (13,000m3/d)
Gdańsk Refinery (Grupa LOTOS S.A.), Gdańsk, 210,000bbl/d (33,000m3/d) – built 1973–74 (original nameplate capacity ca.3 million tpa); upgraded many times from 1994–2010; processing capacity after second distillation startup in December 2010 to 10.5 million tpa (2011)
Porto Refinery (Petrogal, Galp Energia), formerly 110,000bbl/d (17,000m3/d) – closed April 2021; produced around 2.3 million tonnes per year of diesel, gasoline, and kerosene fuels
Petrobrazi Refinery (Petrom/OMV), Ploiești, 90,000bbl/d (14,000m3/d) – 4.5 million tonnes per year; started 1934; mostly destroyed during WWII then rebuilt; upgraded 2005
Arpechim Refinery (Petrom, since 1997, – 49%/OMV, since 2003, – 51%), Pitești, formerly 70,000bbl/d (11,000m3/d)Nelson Complexity Index 7.3 – founded 1964; upgraded 1967 and 2005; mothballed November 2009; partially operated on an "as needed" basis in 2010; closed 2011, operated as a terminal
Göteborg Refinery (Keele Oy), 70,000bbl/d (11,000m3/d)
Switzerland
Cressier Refinery (Varo Energy Holding SA, joint venture of Vitol and Carlyle International Energy Partners (CIEP), since 2014), Neuchâtel, 68,000bbl/d (10,800m3/d) – shutdown 2011 – January 2012; re-started July 2013; being partially converted to use natural gas as of 2015
Collombey-Muraz Refinery (Raffinerie du Sud-Ouest S.A.), formerly 46,000bbl/d (7,300m3/d) – online 1963; closed March 2015[citation needed]
Grangemouth Refinery (Petroineos, a joint venture of Ineos, since 2005, and PetroChina), formerly 210,000bbl/d (33,000m3/d) – to be closed and converted to storage terminal, second quarter 2025
Gulf Refinery, Milford Haven (Petroplus International N.V., Petroplus UK Holding Limited, since September 1998), formerly 115,000bbl/d (18,300m3/d) – 5.75 million tons per year; opened 1968; closed and dismantled December 1997; now a Dragon LNG Terminal
Aruba Refinery (Valero Refining Company-Aruba N.V., Valero, since February 2004), San Nicolas, formerly 235,000bbl/d (37,400m3/d) – commissioned 1929; shut down from 1985–90; mothballed 2009 and again in 2012, to be converted to terminal in 2012; bought by Citgo and reopened now permanently closed[citation needed]
Bahamas
BORCO Refinery (Bahamas Oil Refining Company), Freeport, formerly 125,000bbl/d (19,900m3/d) – commissioned 1970; closed 1985, now an oil terminal
Canada
General information
As of 2018, Canadian refineries collectively had the capacity to process 1.6millionbbl/d (250,000m3/d) of crude oil and produce 1.9millionbbl/d (300,000m3/d) of petroleum products.
Dartmouth Refinery (Imperial Oil (ExxonMobil), since 1989), formerly 82,000bbl/d (13,000m3/d) - began production 1918; upgraded 2001-03; closed down 2013, converted to terminal
Montreal Refinery (Shell Canada Limited), Montreal East, formerly 130,000bbl/d (21,000m3/d) – upgraded 2004–06; closed 2010 and originally was to be made into a terminal but was dismantled and demolished in 2012–14
Refinería Petrolera De Acajutla RASA (Petróleos de El Salvador (Trafigura), Puma Energy since 2011-12), formerly 22,000bbl/d (3,500m3/d) – construction began 1960; start-up 1962; closed October 2012, to become a terminal[citation needed]
As of January 2024[update], there were 132 operating oil refineries in the United States with an atmospheric crude oil distillation capacity of 18,374,628 barrels per calendar day, according to the U.S. Energy Information Administration (EIA).
Smackover Refinery (Cross Oil Refining & Marketing Inc by Martin Midstream Partners LP), Smackover, 7,700bbl/d (1,220m3/d)
California
Bakersfield Refinery (GCEH), Bakersfield, formerly 66,000bbl/d (10,500m3/d) – conversion to 17,000bbl/d (2,700m3/d) of renewable diesel projected to be completed by 2nd half of 2022
El Segundo Refinery (Chevron), El Segundo, 269,000bbl/d (42,800m3/d)
Los Angeles Refinery (Marathon), Carson and Wilmington, 365,000bbl/d (58,000m3/d) (the formerly separate Carson and Wilmington refineries began reporting as one entity in 2019) Nelson Complexity Index 12.07
Los Angeles Refinery (Phillips 66), Wilmington and Carson, formerly 139,000bbl/d (22,100m3/d), Nelson Complexity Index 14.3 – planned closure, second quarter 2025
Martinez/Avon Refinery (Marathon), Martinez, formerly 166,000bbl/d (26,400m3/d) – conversion to 48,000bbl/d (7,600m3/d) of renewable diesel projected to be completed by late 2023
Martinez Refinery (PBF Energy), Martinez, 157,000bbl/d (25,000m3/d), Nelson Complexity Index 16.1
San Francisco Refinery (Phillips 66), Rodeo and Arroyo Grande, formerly 120,200bbl/d (19,110m3/d), Nelson Complexity Index 13.3 – the 200-mile-apart, but connected, Rodeo and Santa Maria/Arroyo Grande refineries began reporting as one entity in 2017. Intended to be closed and converted to renewable fuels plant by 2024
Kapolei Refinery (Par Hawaii Refining, LLC, Par Pacific Holdings, since 2018), Ewa Beach (Kapolei), 93,500bbl/d (14,870m3/d) – single remaining refinery in Hawaii now includes refining assets previously owned and operated as "Hawaii Refinery" by Chevron Corporation with up to 54,000bbl/d (8,600m3/d) in additional capacity; closed briefly in 2013 and was to be converted to a terminal; re-opened after sale to Hawaii Pacific Energy, LLC, Par Petroleum Corporation
Chalmette Refinery (PBF Energy), Chalmette, 185,000bbl/d (29,400m3/d) Nelson Complexity Index 13.0 (was 12.7)
Convent Refinery (Shell Oil Company), Convent, formerly 240,000bbl/d (38,000m3/d) – closed November 2020; conversion into a low-carbon alternative energy facility considered
Fort-Dalo Oil and Refining Company, Bloomingdale, formerly 1,400bbl/d (220m3/d) – closed late 1940s
Midwest Refinery – eventually acquired by and merged with Leonard Refinery below; closed late 1990s
Northern Oil Refinery, Alma – operated from approximately 1938 – October 1999; cleanup on site began 1992
Leonard Oil Refinery, Alma (first refinery to produce high, 96-octane gasoline in 1953), formerly 55,000bbl/d (8,700m3/d) – operated from 1936–1999; damaged by fire 1992; demolished 2003
Paulsboro Refinery (PBF Holding Company LLC, PBF Energy Company LLC, since December 2010) Paulsboro, 160,000bbl/d (25,000m3/d) Nelson Complexity Index 13.1 – commissioned 1917
Marcus Hook Refinery (Sunoco), Marcus Hook, formerly 178,000bbl/d (28,300m3/d) – closed December 2011; acquired by Sunoco Logistics in 2012 – converted into hub for storing and processing natural gas liquids (NGLs)
Philadelphia Refinery (Philadelphia Energy Solutions by Carlyle Group), Philadelphia, formerly 335,000bbl/d (53,300m3/d) – closed in June 2019 after explosion
Hartree Partners Refinery, Channelview, 45,000bbl/d (7,200m3/d) – started operating in 2019
Houston Refinery (LyondellBasell), Houston, formerly 268,000bbl/d (42,600m3/d) – decommissioned February 2025; to be converted into a chemical recycling plant to produce plastic pellets
Houston Refinery (Valero), Houston, 255,000bbl/d (40,500m3/d) Nelson Complexity Index 8.9
Newton County, Texas Refinery – will process one million tons of wood waste into 65 million gallons of transportation biofuels annually, including sustainable aviation fuel and renewable diesel
Oneok Refinery, Corpus Christi, 42,500bbl/d (6,760m3/d) – started operating in 2017
Cheyenne Refinery (HF Sinclair), Cheyenne, formerly 52,000bbl/d (8,300m3/d)Nelson Complexity Index 8.9 – converted (2021) to Renewable Diesel Unit (RDU), 6,000bbl/d (950m3/d), processes refined soybean oil and animal fats into renewable diesel and small amounts of renewable naphtha
Douglas Refinery (Genesis Energy), Douglas, 4,500bbl/d (720m3/d)
Yabucoa Refinery (Shell Chemical Yabucoa, Inc., Shell, since December 2001), formerly 77,000bbl/d (12,200m3/d) – commissioned 1971; closed 2009
Bayamón Refinery (Caribbean Petroleum (Capeco), Puma Energy Caribe LLC, Puma Energy International since 2011), Bayamón/Cataño Free Trade Zone, formerly 48,000bbl/d (7,600m3/d) – operations begun 1955; closed 1995–98; closed down after explosion and fire in October 2009, converted to fuel terminal
US Virgin Islands
St Croix Refinery (previously HOVENSA, then Limetree Bay Terminals, LLC, Limetree Bay Refining, LLC in early 2016), formerly 350,000bbl/d (56,000m3/d), since 2011 – commissioned 1966; upgraded 1974, 1981, 1993 and 2002; closed early 2012; used as storage terminal until 2018, then re-opened as refinery in late 2019; after "oil from the refinery fell from the sky" in February and May 2021, it was shut down in May 2021
Clyde Refinery (Shell Australia, since 1928) Rosehill, Clyde, Sydney, formerly 75,000bbl/d (11,900m3/d) – built in early 1920s and opened in 1927; upgraded 2002 and 2005; closed in 2009 and 2012; converted to fuel import terminal 2013
Altona Refinery (ExxonMobil Australia) Altona North, Melbourne, formerly about 75,000bbl/d (11,900m3/d) – commissioned August 1961; refinery reduced from two trains to one train between 2000–2004; closed 2021, started to be demolished in September 2025 through 2027, being converted to distribution terminal