Line Z4

Line Z4
Overview
Other nameBintie Line 2 (Binhai Metro Line 2)
StatusPartly operational
LocaleTianjin, China
Termini
Stations10 (in operation)
24 (total)
Service
TypeRapid transit
SystemTianjin Metro
Rolling stock
CRRC Dalian 6 cars type A
History
Opened18 January 2026; 9 months ago (2026-01-18)
Technical
Line length23.738 km (14.750 mi) (In operation)
43.7 km (27.2 mi) (Total)
Num of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1,500 V DC Overhead catenary
Operating speed
120 km/h (75 mph) (Maximum design speed)

Line Z4 of Tianjin Metro is a metro line in Tianjin, China. Line Z4 is the largest metro PPP project in China, valued at 55.3 billion RMB. It was won by Tianjin TEDA Investment Holdings Co., Ltd and China Railway Electrification Bureau Group Co., Ltd.

On 16 January 2026, Line Z4 opened trial ride activity for the public.

The northern section was officially put into operation on 18 January 2026.

Timeline

SegmentCommencementLengthStation(s)Name

Zhaishang — Beitang

18 January 2026 23.738 km (14.75 mi) 10 North section

Stations

Station name Transfer Distance

km

Location
Pinyin Chinese
Zhaishang 寨上 Binhai New Area
Hanguyiyuan 汉沽医院
Zhongxinyugang 中心渔港
Yushadao 玉砂道
Hangmugongyuan 航母公园
Ruanjianyuan 软件园
Luchangyuan 绿创园
Heshunlu 和顺路
Zhongxinshengtaicheng 中新生态城
Beitang 北塘