Mayfair-Hillcrest Line

C35
Mayfair-Hillcrest Line
Overview
SystemMetrobus
OperatorWashington Metropolitan Area Transit Authority
GarageAndrews Federal Center
LiveryLocal
StatusActive
Began serviceJune 21, 2015
PredecessorsU7
Route
LocaleNortheast, Southeast, Prince George's County
Communities servedDeanwood, Kenilworth, Mayfair, Parkside, Central Northeast, Greenway, Fort Dupont, Hillcrest, Temple Hills
StartDeanwood station
ViaKenilworth Avenue Service Road NE, Hayes/Jay Streets NE, Minnesota Avenue NE/SE, Branch Avenue SE
EndNaylor Road station (Weekdays & Sundays)
Fort Dupont (Saturdays)
Length60 Minutes
Service
LevelDaily
Frequency20 Minutes (Weekdays)
30 Minutes (Weekends & Late Nights)
Operates4:40 AM – 12:16 AM
Ridership411,074 (FY 2024)
TimetableMayfair-Hillcrest Line
← C33  {{{system_nav}}}  C37 →

The Mayfair-Hillcrest Line Line, designated Route C35, is a daily bus route operated by the Washington Metropolitan Area Transit Authority between Deanwood station of the Orange and Silver Lines of the Washington Metro and Naylor Road station of the Green Line of the Washington Metro via Fort Dupont. Saturday service operates between Deanwood station and Fort Dupont only. The line operates every 20 minutes during the weekdays and every 30 minutes during late nights and weekends.

Background

Route C35 operates between Deanwood and Naylor Road stations weekdays and Sundays via Minnesota Avenue station, Mayfair, and Fort Dupont. Saturday service operates between Deanwood station and Fort Dupont only. Route C35 operates out of Andrews Federal Center division.

History

During WMATA's Fiscal Year of 2015, they announced a series of proposals of simplification affecting the current routes U2, U4, U5, U6, U8, V7, V8, and V9.

At the time of the proposals, the routes were suffering from on-time performances, and several bus bunching on the routes.

U2, V7, V8, V9

For routes U2, V7, V8, V9, it goes as the following:

The reason for the changes was for enhance connectivity between points of regional demand, create a better balance of capacity and demand lines serving the Minnesota Avenue, and reduce or eliminate service with low productivity on the line. According to WMATA. there will be approximately 700 of 5,300 weekday passenger trips (13%), 750 of 3,200 Saturday passenger trips (23%) and 600 of 2,900 Sunday passenger trips (21%) that will be affected by shortening routes V7 and V8 at Navy Yard Station if the changes occur. Weekday passengers affected may be less due to the proposed extension of route V9.

U4

For route U4, it goes as the following:

This rerouting was to create a better balance of capacity and demand on lines serving the Minnesota Avenue station.

U5, U6

For routes U5, U6, it goes as the following:

The rerouting was to improve reliability of service by operating shorter routes and create a better balance of capacity and demand throughout the line. Performance measures has an on-time performance is 78 percent compared to the target of 81 percent.

Changes

In June 2015, WMATA announced a series of changes that'll affect the current U2, U4, U5, U6, U8, V7, V8, and V9.

WMATA created the Deanwood–Minnesota Ave Line with a route designation U7 on June 21, 2015. This new route will operate between Deanwood station and Minnesota Avenue station along Kenilworth Avenue Service Road. This route replaced a portion of routes V7 and V8 which were discontinued on the same day. The new route will provide service along Kenilworth Avenue Service Road in order to improve on time performance to new routes V2 and V4.

Also routes U2, V7, and V8 were replaced by routes V2 and V4, V9 was renamed route V1, and U8 was shortened from Capitol Heights station to Minnesota Avenue station.

During WMATA 2019 Fiscal Year, it was proposed to extended route U7 to Mayfair along the U5, U6 routing similar to the FY2015 budget proposal and U and V line study in 2015. It was also proposed for route U7 to be extend service from the Minnesota Ave station to the intersection of Minnesota Avenue & Ridge Road SE between 9 a.m. and 4 p.m. weekdays, and 7 a.m. and 7 p.m. on Saturdays to provide connections to the Minnesota Avenue shopping corridor. The changes were to retain direct connections between Mayfair and Parkside, Minnesota Ave station, and the Minnesota Avenue shopping corridor during the primary shopping hours and to improve productivity by rerouting and extending Route U7 to serve moderate to high density residential and commercial corridors as route U7 only have service along the Kenilworth Avenue service road.

Performance measures according to WMATA goes as the following as of the FY2016 budget:

Performance MeasureRoute U7WMATA GuidelinePass/Fail
Average Weekday Riders761432Pass
Cost Recovery12%16.6%Fail
Subsidy per Rider$3.69$4.81Pass
Riders per Trip710.7Fail
Riders per Revenue Mile3.61.3Pass

On June 24, 2018, route U7 was rerouted along Kenilworth Terrace, Foote Street, Barnes Street, Hayes Street, and Jay Street to serve Mayfair to replace the U5, U6 which were shorten to Minnesota Avenue station. Also, route U7 was extended from Minnesota Avenue station along Minnesota Avenue to serve Greenway during the Weekday midday and all day Saturday.

During the COVID-19 pandemic, Route U7 was reduced to operate on its Saturday supplemental schedule during the weekdays beginning on March 16, 2020. On March 18, 2020, the line was further reduced to operate on its Sunday schedule. Weekend service was later suspended on March 21, 2020. Additional service and weekend service was restored on August 23, 2020, including service back to Greenway.

In February 2021 during WMATA's FY2022 budget crisis, WMATA proposed to eliminate the U7 section between Deanwood station and Greenway beginning in January 2022. Subsequently on April 22, 2021, WMATA approved the FY2022 budget and received federal funding to avoid service cuts.

Due to rising cases of the COVID-19 Omicron variant, the line was reduced to its Saturday service on weekdays. Full weekday service resumed on February 7, 2022.

In 2024 during WMATA's FY2024 Budget crisis, WMATA proposed to eliminate all U7 service. However on April 25, 2024, Metro’s Board of Directors approved a $4.8 billion capital and operating budget which avoided service cuts.

Better Bus Redesign

In 2022, WMATA launched its Better Bus Redesign project, which aimed to redesign the entire Metrobus Network and is the first full redesign of the agency's bus network in its history.

In April 2023, WMATA launched its Draft Visionary Network. As part of the drafts, WMATA proposed to extend the U7 from Minnesota Avenue station/Greenway to Naylor Road station via Fort Dupont, Ridge Road SE, 37th Street SE, Ely Place SE, Minnesota Avenue SE, and Branch Avenue SE, taking over portions of the current U6. The line would be named Route DC221.

During WMATA's Revised Draft Visionary Network, WMATA renamed the DC221 to Route C35 and was modified to loop in Fort Dupont instead of operating on Ely Place SE to/from Naylor Road station. All changes were then proposed during WMATA's 2025 Proposed Network.

During the proposals, the extension to Naylor Road station would only operate during the weekday peak hours only, with off-peak and all weekend service terminating in Fort Dupont.

On November 21, 2024, WMATA approved its Better Bus Redesign Network.

Beginning on June 29, 2025, the U7 was renamed into the C35, keeping its same routing except the route would now serve the former U6 loop in Greenway. Weekday peak hour service was extended to Naylor Road station via Minnesota Avenue SE and Branch Avenue SE.

In March 2026 during WMATA FY2027 budget proposal, WMATA proposed to extend all off-peak C35 trips from Fort Dupont to Naylor Road station. Subsequently the proposal was approved on April 23, 2026.

On June 21, 2026, all C35 trips during the weekdays and Sundays were extended from Fort Dupont to Naylor Road station. All Saturday trips operate between Deanwood station and Fort Dupont.

References

  1. ↑ "Metrobus FY2024 Annual Line Performance Report" (PDF). wmata.com. Retrieved February 17, 2025.
  2. 1 2 3 4 5 6 7 "DISTRICT OF COLUMBIA PROPOSED BUS SERVICE CHANGES" (PDF). www.wmata.com. Retrieved May 5, 2020.
  3. ↑ Levine, Ethan (June 19, 2015). "Metrobus Service, Schedule Changes to Take Effect Sunday". Patch. Retrieved May 5, 2020.
  4. ↑ "Metrobus U and V Lines Changes in Effect June 21". PlanItMetro. Retrieved May 5, 2020.
  5. ↑ "Metrobus Routes U2, U8, V7, V8, V9 Service Changes effective June 21, 2015" (PDF).
  6. ↑ "Metrobus Service Changes Beginning June 21". June 21, 2015. Archived from the original on June 13, 2015. Retrieved June 27, 2020.
  7. 1 2 "DISTRICT OF COLUMBIA" (PDF). www.wmata.com. Archived from the original (PDF) on December 3, 2018. Retrieved May 5, 2020.
  8. ↑ "Metrobus Service Changes, June 24". www.wmata.com. Archived from the original on June 25, 2018.
  9. ↑ "Metro announces additional COVID-19 changes, including reduced service beginning Monday | WMATA". www.wmata.com. Archived from the original on March 14, 2020. Retrieved January 31, 2021.
  10. ↑ "METRO SERVICE LEVELS & HOURS FURTHER REDUCED TO SUPPORT ESSENTIAL TRIPS ONLY, STARTING WEDNESDAY | WMATA". www.wmata.com. Archived from the original on March 19, 2020. Retrieved January 31, 2021.
  11. ↑ "Weekend: Metro service limited to 26 bus routes, reduced rail service; expect wait times of 30 minutes; customers urged to travel only if essential | WMATA". www.wmata.com. Archived from the original on April 1, 2020. Retrieved January 31, 2021.
  12. ↑ "Metrobus Service Changes beginning August 23 | WMATA". www.wmata.com. Archived from the original on August 14, 2020. Retrieved January 31, 2021.
  13. ↑ "FY22 Proposed Metrobus Service Changes District of Columbia" (PDF). Archived from the original (PDF) on February 28, 2021. Retrieved March 25, 2021.
  14. ↑ "FY2022 PROPOSED BUDGET" (PDF). Archived from the original (PDF) on August 11, 2021. Retrieved June 21, 2026.
  15. ↑ "Metro takes measures to combat omicron variant; Announces service adjustments and protections for customers and employees". Archived from the original on May 6, 2025. Retrieved May 24, 2025.
  16. ↑ "Regular weekday Metrobus service to return February 7". Archived from the original on February 3, 2022. Retrieved May 24, 2025.
  17. ↑ "District of Columbia Fiscal Year 2025 Proposed Metrobus Service Changes" (PDF). Archived from the original (PDF) on March 1, 2024. Retrieved June 17, 2026.
  18. ↑ "Metro Board approves $4.8B budget that maintains service, avoids drastic cuts thanks to additional investments from D.C., Maryland, and Virginia". www.wmata.com. Retrieved June 17, 2026.
  19. ↑ "Draft Visionary District of Columbia Routes" (PDF). Archived from the original (PDF) on October 17, 2023. Retrieved July 29, 2025.
  20. ↑ "Revised Visionary Network Route Summary" (PDF). Archived from the original (PDF) on May 14, 2024. Retrieved July 29, 2025.
  21. ↑ "Proposed 2025 Network District of Columbia Routes" (PDF). Archived from the original (PDF) on August 11, 2025. Retrieved July 29, 2025.
  22. ↑ "Revised Visionary Network Route Summary" (PDF). Archived from the original (PDF) on August 11, 2025.
  23. ↑ "District of Columbia Better Bus Routes" (PDF). Archived from the original (PDF) on July 9, 2025. Retrieved August 6, 2025.
  24. ↑ "Metro Board of Directors approves Better Bus Network Redesign, new bus routes to start next summer". WMATA. Archived from the original on November 21, 2024. Retrieved January 23, 2025.
  25. ↑ "Metro Board of Directors approves Better Bus Network Redesign, new bus routes to start next summer". WMATA. Retrieved January 23, 2025.
  26. ↑ "Metro General Manager Proposes Revised FY2027 Budget Reflecting Updated Mid-Year Financials and Regional Economic Growth Trends". www.wmata.com. Archived from the original on June 14, 2026. Retrieved June 14, 2026.
  27. ↑ "Fiscal Year 2027 Budget". Archived from the original on June 14, 2026. Retrieved July 29, 2025.
  28. ↑ "WMATA Board of Directors adopts FY2027 budget with expanded service and no fare increase". www.wmata.com. Archived from the original on June 4, 2026. Retrieved June 14, 2026.
  29. ↑ "Acceptance of FY2027 Budget Public Hearing Staff Report and Approval of FY2027 Budget and FY2027-FY2032 Capital Improvement Program and Endorsement of the Rail Modernization Program Vision and Red Line Modernization Project" (PDF). Archived (PDF) from the original on June 4, 2026. Retrieved June 14, 2026.
  30. ↑ "Metro Bus Service Changes Start June 21, 2026". www.wmata.com. Retrieved June 14, 2026.