Meredosia Bridge

Meredosia Bridge
Coordinates39°49′51″N 90°33′57″W / 39.83073°N 90.56580°W / 39.83073; -90.56580
Carries IL 104 / IL 99
CrossesIllinois River
LocaleMeredosia, Illinois
Maintained byIllinois DOT
ID number000069001615775
Characteristics
DesignTied arch
Total length2,232 feet (0.4227 mi; 0.680 km)
72 feet (22 m)
History
Constructed byHalverson Construction
Construction start2015
Construction end2018
Construction cost$86.2 million
Opened2018 (2018)
InauguratedJune 19, 2018
Statistics
Daily traffic2,400 (2005)
Location
Interactive map of Meredosia Bridge

The Meredosia Bridge is a two-lane tied-arch bridge constructed in 2018 that carries Illinois Route 104 (IL 104) across the Illinois River between Pike County, Illinois and the city of Meredosia, Morgan County, Illinois. The current bridge was built 250 feet (76 m) north of the old steel truss bridge.

See also