Chabacano metro station opened on 1August 1970, initially providing northbound service on Line2 toward Pino Suárez station and southbound service toward Tasqueña station. Service on Line9, running west to east from Centro Médico to Pantitlán, began on 26August 1987. Line8 service, with trains running southeast toward Constitución de 1917 and north toward Garibaldi station, commenced on 20July 1994. The Line2 station was rebuilt when the transfer facilities were constructed.
The station is accessible to people with disabilities, with elevators, escalators and wheelchair ramps. Outside, several local bus routes serve the area. Inside are an Internet café, an information desk, a cultural showcase, a private library, and a mural titled Civilización y Cultura by José de Guimarães. The station was used as a filming location for the 1990 film Total Recall, starring Arnold Schwarzenegger. Javier Álvarez named a composition after the station. In 2025, the station recorded an average of 32,793 daily passenger entries.
Chabacano metro station serves as an interchange for three lines. It is located between San Antonio Abad and Viaducto stations on Line2, between Obrera and LaViga stations on Line8, and between Lázaro Cárdenas and Jamaica stations on Line9.
Several bus routes serve the station. The Red de Transporte de Pasajeros (RTP) bus system includes Routes 2-A, 31-B, 33, 111-A, and 145-A, while the public bus system includes Routes 9-C, 9-E, 14-A, 17-C, 17-H, and 17-I.
Chabacano metro station has multiple exits serving its various lines. For Line2, there are two exits: the eastern exit is located between Calle Juan A. Mateos, Calzada Chabacano, and Avenida San Antonio Abad in Colonia Vista Alegre, while the western exit is located between Calle Manuel Caballero, Calle Antonio Solís, and Avenida San Antonio Abad in Colonia Obrera.
Line8 has three exits: north, southeast, and southwest. These are located at the respective corners of Calle Juan A. Mateos and Calle Vicente Beristain in Colonia Vista Alegre. Line9 has four exits: the northeast and southeast exits are located at the corners of Calzada Chabacano and Calle J. Antonio Torres X in Colonia Vista Alegre, while the northwest and southwest exits are at the corners of Calzada Chabacano and Calle Francisco Ayala in Colonia Ampliación Asturias.
Unlike the system's other transfer stations, which are linked by underground tunnels, the transfer passageway between Lines2 and 9 is elevated due to limited space for a tunnel. The bridge crosses several houses and streets and is 200 meters (660ft) long. Commuters using Line8 must navigate two additional sets of stairs that connect to a tunnel running between Calle Francisco Ayala and Calle Vicente Beristain.
History and construction
The transfer bridge connecting Lines2 and 9
Name and pictogram
The station is named after the avenue of the same name, which once had several apricot trees, and its pictogram features the silhouette of its fruit. Chabacano means "apricot" in Mexican Spanish; in other regions, it can mean "tacky" or "vulgar".
Line 2
The line was built by Ingeniería de Sistemas de Transportes Metropolitano, Electrometro, and Cometro, the latter being a subsidiary of Empresas ICA. Chabacano station opened on 1August 1970, as part of the inaugural Pino Suárez–Tasqueña service. The station was built at grade level with a design similar to other stations in the at-grade section, including an island platform. The section between Chabacano and San Antonio Abad is 642 meters (2,106ft) long, while the section between Chabacano and Viaducto measures 774 meters (2,539ft).
When construction of Lines8 and 9 began, the station was rebuilt to improve passenger boarding and alighting. The Spanish solution was implemented across all platforms, whereby alighting passengers use the central platform, while boarding passengers use the side platforms on the opposite side of the train. The station offers accessibility features, including four elevators.
As part of preparations for the 2026 FIFA World Cup, authorities implemented partial closures at the station starting on 9February 2026, to carry out rehabilitation work on the line. The station was connected to the Jardín Flotante Tlallipan, a pedestrian overpass built during the renovation works that runs above the Line2 tracks toward Pino Suárez.
Line 8
ICA built the line, whose first and only section opened on 20July 1994, running from Garibaldi to Constitución de 1917. Chabacano is an underground station; the tunnel between Chabacano and Obrera is 1,143 meters (3,750ft) long, while the section between Chabacano and LaViga measures 843 meters (2,766ft).
Line 9
Cometro built the line, whose first section, including Chabacano, opened on 26August 1987, running from Centro Médico towards Pantitlán station. Chabacano is an underground station; the tunnel to Lázaro Cárdenas is 1,000 meters (3,300ft) long, while the tunnel toward Jamaica measures 1,031 meters (3,383ft) long.
The station provides accessible facilities, including wheelchair ramps, two elevators, and escalators. These facilities were renovated in 2021 to address obsolescence.
Incidents
On 28December 2010, an elderly passenger attempting to help two people who had dropped their belongings onto the tracks fell onto the rails and was struck and killed by an approaching Line2 train. On 4June 2018, a law student was arrested for attempting to access the Benito Juárez library inside the station after the station manager denied him entry, stating that it was reserved for metro personnel. The public prosecutor’s office declined to pursue charges, deeming the restriction unjustified under the City Libraries Code, as the facility is located in a public space. Metro authorities later clarified that the library is open to the general public upon registration.
On 12September 2020, the station was vandalized by feminists protesting reported cases of harassment and restrictions on street vendors within the metro system. Following the collapse of a bridge on Line12, which resulted in 26 deaths, demonstrators vandalized the station again and assaulted metro staff, whom they held responsible for the accident. On 1April 2022, a woman slipped on an escalator, triggering a chain reaction that knocked down seven other people, all of whom sustained minor injuries.
Part of the mural Cultura y CivilizaciónLa Silueta Ska performing in the lobby of Line9
The station includes an Internet café, an information desk, a cultural display, a private library, and a mural titled Civilización y Cultura (English: "Culture and Civilization") by Portuguese artist José de Guimarães. Created on a 120-square-meter (1,300sqft) ceramic surface, the mural is divided into two sections and is located on Line9. Inaugurated on 6November 1996, it features elements from the pre-Hispanic cultures of Mesoamerica. According to de Guimarães, "two fundamental archetypes have prevailed throughout the centuries [in pre-Hispanic culture in Mexico]: the serpent as a symbol of water-life and the jaguar as a symbol of earth-fertility. Without these two important elements for man, history would not take place".
Due to its size, Chabacano metro station has held cultural programs in its lobby. The station has hosted mini-concerts featuring musicians such as Trans-X, Ji-Hae Park, and the Orquesta Sinfónica de Yucatán.
Scenes from the 1990 film Total Recall were filmed at the station at night. Starring Arnold Schwarzenegger and set in the year 2084. The film depicts a future in which humanity has colonized Mars. In one scene on Earth, Douglas Quaid, a secret agent with erased memories, escapes from attackers by entering a subway station and leaping through the window of an outbound train. During filming, Schwarzenegger accidentally cut his wrist when the crew failed to detonate the window on time. To transform the building for the scene, the film crew painted the walls and a train in cement gray, covered the signage, and added monitors throughout the station. Mexican composer Javier Álvareznamed one of his compositions after the metro station. It was played live by the Cuarteto Latinoamericano at the station during an exhibition in September 1991.
By 2020, the station and its surrounding area had become a popular location for buying and selling used and vintage clothing, particularly on weekends.
Ridership
Passengers descend the stairs from Line 2. In the background is the transfer tunnel to Line 9, while access to Line 8 is via an additional set of stairs.
Daily ridership for Line 2 in 2024Daily ridership for Chabacano Line2
Daily ridership for Line 8 in 2024Daily ridership for Chabacano Line8
Daily ridership for Line 9 in 2024Daily ridership for Chabacano Line9
According to official data, Line2 records higher usage than Lines8 and 9, which are among the least accessed in the system. Prior to the impact of the COVID-19 pandemic the station recorded a total ridership of 15,920,404 passengers in 2019, averaging 43,584 daily entries. System authorities estimated that an average of 83,000 passengers traveled through the station daily in 2021.
The station's total ridership for 2025 was 11,969,655 passengers, with a daily average of 32,793 entries. By line, Line2 recorded 7,932,688 passengers, averaging 21,733 per day. Line8 recorded 1,273,326 passengers, averaging 3,488 per day. Line9 recorded 2,763,641 passengers, averaging 7,571 per day.
In 2025, when considered individually among the system's 195 stations, the Line2 station ranked 47th busiest; the Line8 station ranked 188th in the system, while the Line9 station ranked 155th.
Annual passenger ridership (Line 2)
Year
Ridership
Average daily
Rank
% change
Ref.
2025
7,932,688
21,733
47/195
+12.40%
2024
7,057,566
19,282
53/195
−11.84%
2023
8,005,603
21,933
43/195
+9.53%
2022
8,005,603
20,024
43/195
+62.52%
2021
4,497,267
12,321
61/195
−32.96%
2020
6,707,998
18,327
34/195
−35.83%
2019
10,452,786
28,637
47/195
−3.49%
2018
10,831,155
29,674
45/195
+5.52%
2017
10,264,980
28,123
47/195
−0.07%
2016
10,272,203
28,066
49/195
+0.34%
Annual passenger ridership (Line 8)
Year
Ridership
Average daily
Rank
% change
Ref.
2025
1,273,326
3,488
188/195
−0.78%
2024
1,283,378
3,506
180/195
−13.23%
2023
1,479,067
4,052
170/195
+26.33%
2022
1,170,770
3,207
171/195
+18.48%
2021
988,177
2,707
177/195
+11.73%
2020
884,432
2,416
189/195
−43.12%
2019
1,554,977
4,260
191/195
−1.02%
2018
1,571,045
4,304
191/195
+10.33%
2017
1,424,001
3,901
191/195
+2.15%
2016
1,394,042
3,808
191/195
+0.44%
Annual passenger ridership (Line 9)
Year
Ridership
Average daily
Rank
% change
Ref.
2025
2,763,641
7,571
155/195
+15.07%
2024
2,401,683
6,561
155/195
−21.87%
2023
3,073,903
8,421
132/195
−0.58%
2022
3,091,961
8,471
128/195
+9.90%
2021
2,813,390
7,707
117/195
+32.75%
2020
2,119,283
5,790
150/195
−45.83%
2019
3,912,641
10,719
150/195
−2.54%
2018
4,014,545
10,998
146/195
+0.42%
2017
3,997,946
10,953
143/195
−0.01%
2016
3,998,201
10,924
144/195
+0.59%
Notes
↑The Mexico City Metro system records entries at interchange stations separately. Individually, Line2 saw 7,932,688 passengers, Line8 had 1,479,067 passengers, and Line9 recorded 1,273,326 passengers.
1234567The system's website counts only passenger entries into stations and does not include passengers passing through, transferring between lines, or exiting the station. The data here is limited to the most recent ten years to avoid excessive listings; earlier figures can be found in this page's history or on the Mexico City Metro website. To calculate the average daily ridership, the annual total is divided by 365 days (366 in leap years), with decimals omitted from the result. Each station per line is ranked individually, as the system counts transfer stations separately. The percentage change is calculated automatically using the data from the current year and the previous year.
↑Estación del Metro Chabacano. Mexican Spanish pronunciation: [tʃaβaˈkano]ⓘ. The name of the station means "apricot" in Mexican Spanish.
↑"Red de Rutas"[Routes network] (in Spanish). Red de Transporte de Pasajeros. Archived from the original on 6 November 2021. Retrieved 30 October 2021.
↑"Red de corredores"[Route network]. Organismo Regulador de Transporte (in Spanish). Archived from the original on 14 October 2021. Retrieved 30 October 2021.
↑Sandoval, Cecilia (1 May 2008). "Estación Chabacano"[Chabacano Station]. Myco (in Spanish). Archived from the original on 28 March 2012. Retrieved 29 July 2011.
12"Línea 2, Ciudad de México"[Line 2, Mexico City] (in Spanish). iNGENET Infraestructura. 20 July 2009. Archived from the original on 18 January 2021. Retrieved 16 July 2021.
↑"Línea 8, Ciudad de México"[Line 8, Mexico City] (in Spanish). iNGENET Infraestructura. 20 July 2009. Archived from the original on 3 July 2020. Retrieved 12 September 2021.
↑"Ingeniería y Metro"[Engineering and Metro](PDF). Sistema de Transporte Colectivo Metro (in Spanish). Colegio de Ingenieros Civiles de México. p.6. Archived from the original(PDF) on 13 September 2021. Retrieved 12 September 2021.
↑"Línea 9, Ciudad de México"[Line 9, Mexico City] (in Spanish). iNGENET Infraestructura. 20 July 2009. Archived from the original on 2 September 2014. Retrieved 15 April 2020.
↑"Civilización y Cultura"[Culture and Civilization] (in Spanish). Sistema de Transporte Colectivo Metro. Archived from the original on 28 October 2020. Retrieved 15 May 2022.
↑"Álvarez, Javier – Metro Chabacano". Secretariat of Culture of Mexico City (in Spanish). Government of Mexico City. 25 September 2019. Archived from the original on 16 May 2022. Retrieved 15 May 2022.
123"Afluencia de estación por línea 2021"[Station traffic by line in 2021] (in Spanish). Sistema Transporte Colectivo Metro. 2022. Archived from the original on 7 March 2022. Retrieved 7 March 2022.
123"Afluencia de estación por línea 2020"[Station traffic by line in 2020] (in Spanish). Sistema Transporte Colectivo Metro. 2021. Archived from the original on 21 June 2021. Retrieved 21 June 2021.