Ningbo Center

Ningbo Central Plaza Tower 1
Ningbo Center in 2025
General information
StatusCompleted
LocationNingbo, China
Coordinates29°51′53″N 121°36′29″E / 29.8647°N 121.6080°E / 29.8647; 121.6080
Construction started
December 31, 2018
Completed
2024
OpenedApril 9, 2025
Height
Height409 m (1,342 ft)
Technical details
Floor count80
Floor area250,000 m2
Lifts/elevators53
Design and construction
ArchitectSkidmore, Owings & Merrill LLP
DeveloperGreentown China
Shanshan Group
Main contractorShanghai Construction Group

Ningbo Center is a mixed-use supertall skyscraper in Ningbo, China. Built between 2018 and 2025, the tower stands at 409 m (1,342 ft) tall with 80 floors. It became the first supertall and the tallest building in Ningbo, surpassing the previous Ningbo Global Shipping Plaza by 146 meters. Construction started on New Year's Eve on December 31, 2018.

History

Ningbo Center Building started pile foundation construction in January 2019, and the structure fully topped out in the second half of 2024. The building was opened on April 9, 2025. The top 20 floors house a Ritz-Carlton Hotel, and the bottom 60 floors contain Grade-A office space.

The building has a total construction area of about 250,000 square meters. It has 80 floors above ground and 3 floors underground. It was jointly developed by Shanghai Construction Group, Shanshan Group and Greentown China. It was designed by SOM Architects. Construction started on April 9, 2018. The bottom was completed on August 24, 2020. The upper part of the building started on November 24, 2020. On May 20, 2022, it surpassed Ningbo Global Shipping Plaza to become the tallest building in Ningbo. The top was completed on April 26, 2023. The completion acceptance and filing were completed on January 21, 2025. The building was put into use on April 9, 2025. Floors 1 to 60 of the building are Grade A office buildings, and floors 61 to 80 are the Ritz-Carlton Hotel.

Elevator configuration

The fourth phase of Ningbo Center Building uses Hitachi high-speed elevators, including two HEX elevators with a running speed of up to 10 m/s, making them the fastest elevators in Zhejiang Province, and five OEX elevators, which are the first double-car elevators to appear in Ningbo.

Elevator configuration for Phase IV of Ningbo Center
Elevator unit nr. Nr. of units
per each area
Service floor Elevator type Area Notes
OP1-1 ~ OP1-6 6 1, 4-10, 12-17 Service Podium
OP2-1 ~ OP2-6 6 1, 19-27 Fire Office
OP3-1 ~ OP3-6 6 30, 31-37, 50-56 Freight Office
OP4-1 ~ OP4-6 6 29, 57-58, 60-69 Service Office
OPS-1 ~ OPS-2 2 B3-B2, 1-1M Passenger Parking lot
OEX-1 ~ OEX-5 5 1/1M, 29/30 Shuttle Office
OEX-6 1 29-30 Shuttle Office
OS-1 1 B2, B1, 1, 3-11, 12-18, 19-28, 29-69 Shuttle Office The elevator for administrative staff is decorated like a passenger elevator.
OS-2 1 B1, 1, 3-11, 12-18, 19-28, 29-69 Shuttle Office
OS-3 1 B3-B2, B1, 1, 3-11, 12-18, 19-28, 29-69 Passenger Office
HL-1 ~ HL-4 4 72-79, 81-87, 89 Double-deck shuttle passenger Office
HEX-1 ~ HEX-3 3 1, 2-3, 73 Firefighting and freight service All One of them cannot reach a speed of 10 m/s
HEX-4 1 73, 90 Service Hotel
HPS-1 ~ HPS-2 2 B3-B2, 1, 2-3 Passenger Parking lot
HPS-3 1 B3-B2, B1, 1 Passenger Parking lot
HS-1 ~ HS-2 2 72-79, 81-89 Shuttle Hotel
HS-FF、HS-LB 2 B3-B2, B1, 1, 3-11, 12-18, 19-28, 29-71, 72-90 Passenger Hotel The HS-FF is a variable load elevator, which allows for operation with a maximum overload of 4000 kg.
PHS-1 ~ PHS-2 2 B1, 2-4 Shuttle Hotel
BB-FF 1 B1, 1 Service Parking lot Located on the perimeter of the building and incorporated into Phase IV of Ningbo Center

See also

References

  1. ↑ "Ningbo Center Tower 1 - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2025-10-20.
  2. ↑ "Ningbo Center Tower 1 - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2021-01-08.
  3. ↑ "宁波中心大厦"浮出地面" 计划2023年结顶" [The Ningbo Center Building "surfacing" is planned to be completed in 2023]. news.cnnb.con.cn (in Chinese). 2020-11-25. Retrieved 2023-01-11.
  4. ↑ "2557天匠心雕琢"云端莲花" "浙江第一高楼"宁波中心大厦正式交付-新闻中心-中国宁波网". news.cnnb.com.cn (in Chinese). Retrieved 2025-10-20.
  5. ↑ "宁波中心大厦今晚正式交付投用". www.nbyz.gov.cn (in Chinese). Retrieved 2025-10-20.
  6. ↑ "409米!宁波中心上午动工 刷新"浙江高度"-新闻中心-中国宁波网". news.cnnb.com.cn. Archived from the original on 2022-10-07. Retrieved 2023-03-19.
  7. ↑ "409米宁波中心大厦"站稳脚跟" 创两项宁波民用建筑纪录-新闻中心-中国宁波网". news.cnnb.com.cn. Archived from the original on 2023-03-19. Retrieved 2023-03-19.
  8. ↑ 杨绪忠; 王博 (2020-11-25). "宁波中心大厦"浮出地面" 计划2023年结顶". 中国宁波网. Archived from the original on 2021-01-25. Retrieved 2021-04-01.
  9. ↑ "宁波"新第一高楼"诞生!". daily.cnnb.com.cn. Archived from the original on 2023-03-19. Retrieved 2023-03-19.
  10. ↑ "375.85米!宁波中心大厦结顶 计划2025年投用-新闻中心-中国宁波网". news.cnnb.com.cn. Archived from the original on 2023-04-26. Retrieved 2023-04-26.
  11. ↑ "2025年1月份鄞州区住建局竣工验收备案登记表". www.nbyz.gov.cn. Retrieved 2025-03-23.
  12. ↑ "2557天匠心雕琢"云端莲花" "浙江第一高楼"宁波中心大厦正式交付-新闻中心-中国宁波网". news.cnnb.com.cn. Retrieved 2025-04-09.
  13. ↑ "宁波中心大厦今晚正式交付投用". www.nbyz.gov.cn. Retrieved 2025-04-09.