Pachalam ROB

Pachalam ROB

പച്ചാളം ROB
CarriesPachalam - Vaduthala
LocalePachalam, Kerala, India
Characteristics
Width10 m (33 ft)
History
OpenedMarch 2015 (2015-03)

Pachalam Railway Over Bridge is bridge connecting Pachalam to Sree Kattungal Bhagavathy Temple in Vaduthala. The bridge starts at about 3 km north of Pachalam junction, crosses the railway track, turns South and will land 3 metre ahead of the main entrance of Kattungal Bhagavathy Temple. It eases the congestion in the Kochi City especially in the Vaduthala- Pachalam route along the Chittoor Road. It is constructed by Delhi Metro Rail Corporation (DMRC) and construction started in March 2014. The bridge was inaugurated by Chief Minister of Kerala Oommen Chandy.

References

  1. ↑ Service, Express News (2014-11-18). "Pachalam ROB: a Project Stalled By Discontent". The New Indian Express. Retrieved 2026-07-30.
  2. ↑ "Tender for Vaduthala ROB to be issued today". The Times of India. ISSN 0971-8257. Retrieved 2026-09-28.
  3. ↑ "Pachalam ROB work resumes amid protests in Kochi". The Hindu. 2014-11-21. ISSN 0971-751X. Retrieved 2026-07-30.
  4. ↑ "Pachalam ROB: A bridge to controversy". The Hindu. 2014-04-02. ISSN 0971-751X. Retrieved 2026-07-30.