Penychain station in 2014 | |||||
| General information | |||||
| Location | near Chwilog, Gwynedd Wales | ||||
| Coordinates | 52°54′11″N 4°20′20″W / 52.903°N 4.339°W | ||||
| Grid reference | SH428364 | ||||
| Manager | Transport for Wales | ||||
| Platforms | 1 | ||||
| Other information | |||||
| Station code | PNC | ||||
| Classification | DfT category F2 | ||||
| Key dates | |||||
| 31 July 1933 | Opened (as Penychain Halt) | ||||
| Passengers | |||||
| 2020/21 | |||||
| 2021/22 | |||||
| 2022/23 | |||||
| 2023/24 | |||||
| 2024/25 | |||||
| |||||
| |||||
Penychain railway station, is located by an over bridge at Pen-ychain on the Llŷn Peninsula in Gwynedd, Wales. For many years the station served the large Butlins Holiday Camp at Penychain. The station is on the Cambrian Line, between Abererch and Criccieth, 129 miles 29 chains (208.2 km) from Whitchurch, measured via Oswestry (the original line diverging at Welshpool).
The station opened as Penychain Halt on 31 July 1933. Butlin's built the adjacent camp in 1940 at the request of the Admiralty to serve as HMS Glendower, a Royal Navy training base at Penychain was already used as a Rifle range during WWI. After the end of the war the Butlins camp opened, and the name was changed to Penychain for Pwllheli Holiday Camp on 3 April 1947. The name then changed to Butlins Penychain on 17 May 1993, before reverting to its current name on 18 May 2001.
Between November 2013 and September 2014, services were suspended north of Harlech due to issues with construction of Pont Briwet, near Penrhyndeudraeth. From 1 September to 1 December 2023, engineering work took place to finish restoration of the Barmouth Viaduct. Rail replacement buses served stations from Pwllheli to Machynlleth.
There is a large shelter, a bench, and a live departure screen. As there are no facilities to purchase tickets, passengers must buy one in advance, or from the guard on the train.
| 2004–05 | 2005–06 | 2006–07 | 2007–08 | 2008–09 | 2009–10 | 2010–11 | 2011–12 | 2012–13 | 2013–14 | 2014–15 | 2015–16 | 2016–17 | 2017–18 | 2018–19 | 2019–20 | 2020–21 | 2021–22 | 2022–23 | 2023–24 | 2024–25 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Entries and exits | 2,996 | 2,512 | 2,719 | 2,274 | 1,896 | 2,446 | 2,394 | 3,060 | 3,252 | 3,276 | 1,716 | 3,430 | 3,540 | 4,126 | 3,554 | 3,298 | 640 | 2,894 | 4,314 | 4,818 | 8,892 |
The statistics cover twelve month periods that start in April.
Penychain is an unstaffed halt and request stop. There are 8 trains a day, each way to Pwllheli and Machynlleth. A limited service of 5 trains each way operates on Sundays.
| Preceding station | Following station | |||
|---|---|---|---|---|
| Abererch | Transport for Wales Cambrian Coast Line |
Criccieth |