Perth Link Roads

Perth Link Roads

Entrance to Perth Link Roads near the South Esk River
Perth Link Roads is located in Tasmania
West end
West end
North end
North end
Coordinates
General information
TypeHighway
Length8 km (5.0 mi)
Opened
  • First stage - 2018
  • Final stage - June 2020
Route number(s) National Highway (Perth - Breadalbane)
Major junctions
West end
 
North end
Location(s)
RegionMidlands
Major settlementsPerth, Breadalbane
Highway system

Perth Link Roads is a A$92.3 million bypass that carries the Midland Highway in Tasmania. The bypass takes highway traffic, including heavy vehicles, around the western side of Perth instead of through the town centre.

The final stage of the bypass opened in June 2020 near Perth after the first stage of the bypass opened in 2018 at Breadalbane bypassing the roundabout at Breadalbane.

Route description

Perth Link Roads route (red)

The bypass starts at Breadalbane at a trumpet interchange for Evandale Road, where the Launceston Southern Outlet ends. It runs for 4 or 5 kilometres with a few gentle curves to a diamond interchange for Haggerston Road, and then straight on to a second diamond interchange, with two roundabouts, for the main street of Perth. The road curves through an interchange with Illawarra Road and runs for about 1 kilometre through a cutting to a roundabout on the main street of Perth, near the South Esk River, where the bypass ends.

Exits

LocationkmmiDestinationsNotes
Northern MidlandsPerth00.0 Midland Highway / Main Road / Eskleigh RoadRoundabout near the South Esk River
Northern MidlandsPerth21.2 Illawarra RoadSemi-directional T interchange
Northern MidlandsPerth42.5 Main RoadDiamond intersection with a roundabout
Northern MidlandsDevon Hills6.44.0Old Midland HighwayDiamond intersection
Northern MidlandsBreadalbane85.0 Evandale RoadTrumpet interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

History

Originally, the bypass was going to be built for Illawarra Road from the entrance of Perth, near the bridge that crosses the South Esk River which was going to have a speed grade intersection for the Midland Highway. The plan was to replace the already existing route for Illawarra Road which used to go on Drummond Street for truck freight. The plan was not built at all until 2018. In 2017 the Tasmanian Government announced that the bypass will be constructed in 2018 from approval from the Northern Midlands Council. The first stage of the bypass was opened to traffic which bypassed the Breadalbane roundabout with two speed grade intersections and bypasses Devon Hills.

In April 2020, the first stage of the bypass was opened but only went onto Illawarra Road due to the rest of the bypass still being under construction, so drivers would have to go through Perth and then coming out of Perth but going onto two roundabouts before going onto the Southern Outlet. The bypass was completed and opened in June 2020 with a cost of A$92.3 million. A cycling path was built near the main railway line and finishes on Illawarra Road near the interchange for Pateena Road.

See also