
Ahvaz Pol Hashtom or Pol-Kabli (Persian: پل کابلی یا پل هشتم اهواز) known as Qadir Bridge, is the eighth intra-urban bridge in Ahvaz, Khuzestan, Iran. It is the largest intra-urban cable bridge in West Asia.
Construction started in February 2006 and ended in March 2012. The bridge connects the Amaniyeh area and Takht-e Soleyman street, which are located west of the Karun river, with Zand street, which is located east of this river.
The structure is of wicker cable type. Its length is 1,314 metres (4,311 ft) and its width is 22 metres (72 ft).
{{cite web}}: CS1 maint: numeric names: authors list (link)31°18′51″N 48°40′17″E / 31.3141°N 48.6714°E