San'yō Main Line

San'yō Main Line
JNR 115-3000 in Setouchi yellow livery running near the Seto Inland Sea.
Overview
Other nameJR Kobe Line (Kobe – Himeji)
Native name山陽本線
Owner
LocaleKansai, Chugoku, Kyushu regions
Termini
Stations124
Service
TypeHeavy rail, commuter rail
System
  • Urban Network
    (Kōbe – Kamigōri, Hyōgo – Wadamisaki)
  • Hiroshima City Network
    (Shiraichi – Minami-Iwakuni)
Operators
History
Opened1872; 154 years ago (1872)
Technical
Line length
  • 528.1 km (328.1 mi)
    (Kōbe – Shimonoseki)
  • 6.3 km (3.9 mi)
    (Shimonoseki – Moji)
  • 2.7 km (1.7 mi)
    (Hyōgo – Wadamisaki)
Track gauge1,067 mm (3 ft 6 in)
Electrification
Operating speed
  • 130 km/h (81 mph)
    (Kōbe – Okayama)
  • 120 km/h (75 mph)
    (Okayama – Shimonoseki)
  • 85 km/h (53 mph)
    (Shimonoseki – Moji, Hyōgo – Wadamisaki)

The San'yō Main Line (山陽本線, San'yō-honsen) is a major railway line owned by JR Group companies in western Japan, connecting Kōbe Station and Moji Station, largely paralleling the coast of the Seto Inland Sea, in other words, the southern coast of western Honshu. The San'yō Shinkansen line largely parallels its route. The name San'yō derived from the ancient region and highway San'yōdō, the road on the sunny (south) side of the mountains.

The San'yō Main Line is operated by two JR companies:

The Wadamisaki Line, a short section of line in the length of 2.7 km (1.7 mi) between Hyōgo and Wadamisaki stations in Kobe is a branch of the San'yō Main Line. A short section connecting Kitakyushu Freight Terminal also forms part of the San'yō Main Line.

Basic data

Stations

From Kobe to Himeji (JR Kobe Line)

●: Trains stop at all times
|: Trains pass at all times
▲: Eastbound trains pass in the morning
○: Weekday mornings only

Line No. Station Distance in km (mi)
Local
Rapid
Special Rapid
Transfers Location
Between
stations
Total
↑ Through service to/from the JR Kyoto Line ↑
Tōkaidō  A 63  Kobe
神戸
1.7 (1.1) 33.1 (20.6) ● ● ● Chuo-ku, Kobe Hyōgo
San'yō
 A 64  Hyōgo
兵庫
1.8 (1.1) 34.9 (21.7) ● ● |      Wadamisaki Line (San'yō Main Line) Hyogo-ku, Kobe
 A 65  Shin-Nagata
新長田
2.3 (1.4) 37.2 (23.1) ● | |
  • Kobe Municipal Subway:
  • The logo of the Seishin-Yamate Line of the Kobe Municipal Subway. Seishin-Yamate Line (S09)
  • The logo of the Kaigan Line of the Kobe Municipal Subway. Kaigan Line (K10)
Nagata-ku, Kobe
 A 66  Takatori
鷹取
1.0 (0.62) 38.2 (23.7) ● | | Suma-ku, Kobe
 A 67  Suma-Kaihinkōen
須磨海浜公園
0.9 (0.56) 39.1 (24.3) ● | |
 A 68  Suma
須磨
1.3 (0.81) 40.4 (25.1) ● ▲ | SY Sanyo Railway Main Line (SY 06: Sanyo Suma Station)
 A 69  Shioya
塩屋
2.0 (1.2) 43.3 (26.9) ● | | SY Sanyo Railway Main Line (SY 08: Sanyo Shioya Station) Tarumi-ku, Kobe
 A 70  Tarumi
垂水
2.9 (1.8) 46.2 (28.7) ● ▲ | SY Sanyo Railway Main Line (SY 11: Sanyo Tarumi Station)
 A 71  Maiko
舞子
2.0 (1.2) 48.2 (30.0) ● ▲ | SY Sanyo Railway Main Line (SY 13: Maiko-koen Station)
 A 72  Asagiri
朝霧
1.9 (1.2) 50.1 (31.1) ● | | Akashi
 A 73  Akashi
明石
2.4 (1.5) 52.5 (32.6) ● ● ● SY Sanyo Railway Main Line (SY 17: Sanyo Akashi Station)
 A 74  Nishi-Akashi
西明石
3.4 (2.1) 55.9 (34.7) ● ● ● San'yō Shinkansen
 A 75  Okubo
大久保
2.8 (1.7) 58.7 (36.5) ○ ● |
 A 76  Uozumi
魚住
3.5 (2.2) 62.2 (38.6) ○ ● |
 A 77  Tsuchiyama
土山
3.1 (1.9) 65.3 (40.6) ○ ● | Harima
 A 78  Higashi-Kakogawa
東加古川
3.3 (2.1) 68.6 (42.6) ○ ● | Kakogawa
 A 79  Kakogawa
加古川
3.6 (2.2) 72.2 (44.9) ○ ● ● I Kakogawa Line
 A 80  Hoden
宝殿
3.3 (2.1) 75.5 (46.9) ● | Takasago
 A 81  Sone
曽根
4.0 (2.5) 79.5 (49.4) ● |
 A 82  Himeji Bessho
ひめじ別所
2.0 (1.2) 81.5 (50.6) ● | Himeji
 A 83  Gochaku
御着
2.1 (1.3) 83.6 (51.9) ● |
 A 84  Higashi-Himeji
東姫路
2.4 (1.5) 86.0 (53.4) ● |
 A 85  Himeji
姫路
1.9 (1.2) 87.9 (54.6) ● ●
↓ Through service to/from the San'yō Main Line (below) ↓

From Himeji to Itozaki

From Itozaki to Iwakuni (Hiroshima City Network)

Akiji Liner rapid service operates through to the Kure Line

City Liner rapid service, limited weekend service only

●: All trains stop
|: Trains pass at all times
○: All trains stop, limited service

Iwakuni to Moji

Rolling stock

JR West 113 series EMU
JR West 223 series EMU
Freight train with Class EF210 locomotive

JR West

Limited Express

Local trains

JR Kyushu

History

The entire line between Kobe Station and Shimonoseki Station was originally opened by the private Sanyō Railway company. The section between Hyōgo Station (in Kobe) and Akashi Station (in Akashi, Hyōgo) opened first in 1888. In 1889 the line was extended to the east to Kobe Station (as a dual track section) and Tatsuno Station (in Tatsuno, Hyōgo Prefecture) to the west. The Sanyō Railway was progressively extended to the west, reaching Okayama and then Fukuyama in 1891, Hiroshima in 1894 and in 1901 it reached Bakan (now Shimonoseki) Station. Under the Railway Nationalization Act of 1906 it was purchased by the Japanese government and renamed Sanyō Main Line.

Duplication

The Hyogo – Himeji section was duplicated in 1899, and the Hiroshima – Kaitaichi section in 1903. After the line was nationalised, further duplications occurred between Kamigori – Yoshinaga in 1910/11, Hatabu – Shimonoseki in 1915 and Himeji – Agaho in 1917. Work to duplicate the remainder of the line commenced in 1921, and opened in stages until completed in 1930, with the exception of the section between Iwakuni and Kushigahama, where construction of a new direct line had commenced. This direct line, which bypassed the coastal section via Yanai involved significant tunnelling, and unexpected geological instability delayed completion of the line until 1934, and then as a single track. Although the new line became the Sanyo Main Line at that time, in 1944 the original coastal alignment was duplicated and returned to the formal Sanyo Main Line, with the former bypass line becoming the Gantoku Line.

Electrification

The Kobe – Akashi section was electrified in 1934, extended to Himeji in 1958, Hiroshima in 1962 and (except for the Wadamisaki Line, which was electrified in 2001) the entire line was electrified in 1964, to coincide with the opening of the Tōkaidō Shinkansen between Tokyo and Shin-Osaka the same year.

Deviation/extension

The San'yō Main Line approximately parallels the Inland Sea but some sections could be shortened by tunnels. In 1934, the Gantoku Line between Iwakuni and Tokuyama was opened and replaced the former line which traverses Yanai adjacent to the Inland Sea. In 1944, this new alignment was replaced again by the previous coastal alignment because the coastal line was upgraded to dual tracks.

The San'yō Main Line was connected to Kyushu by ferry from Shimonoseki and Shimonosekiko Station (Port Shimonoseki). In 1942, the Kanmon Tunnel under the Kanmon Straits was completed and the San'yō Main Line was extended to Moji Station. A second tunnel duplicating the section opened in 1944.

Service variations

Prior to the opening of the San'yō Shinkansen, many expresses operated on the San'yō Main Line as it served as a major transport corridor through Western Honshu and connecting to Kyushu. The Shinkansen was extended as the San'yō Shinkansen line, first to Okayama Station in 1972, and then to Hakata Station in 1975. On both occasions, many express services on the San'yō Main Line were withdrawn, and since 1972, the line has been mainly used by local and freight services. CTC signalling was commissioned between Mihara and Shimonoseki in 1984.

Service disruptions

The section between Kobe and Nishi Akashi was severely damaged by the 1995 Great Hanshin earthquake, and took ten weeks to repair.

The 2018 Japan floods resulted in the Okayama – Shimonoseki section closing on 6 July 2018. The majority of services were restored between 8 July – 18 July of that year, but the Yanai – Tokuyama section remained out of service until 9 September of that year.

Former connecting lines

Iwakuni Electric Railway train
A Nagato Railway train

The Tatsuno Electric Railway Co. opened a 17 km (11 mi) 1,435 mm (4 ft 8+1⁄2 in) gauge line electrified at 600 VDC from Shingu-Cho to Aboshiko between 1909 and 1915 which connected at this station. The line closed in 1934.

A 6 km line to Hamadako operated between 1943 and 1989.

The Kirin Brewery operated a 2 km (1.2 mi) line to its complex between 1937 and 1986.

See also

References

  1. ↑ "Spring 2022 timetable revision (Japanese)" (PDF). JR West. 2021-12-17.
  2. ↑ "10 rail sections out of service for over a month in flood-hit region:The Asahi Shimbun". Archived from the original on 2018-07-20. Retrieved 2018-07-29.
  3. ↑ "9月9日(日)「JR山陽本線再開」下松駅-柳井駅、ダイヤは災害前の通常時刻 【お知らせ】". Hikari.Fun (in Japanese). 3 September 2018. Retrieved 2022-06-26.