| Serven Solar Power Plant | |
|---|---|
![]() | |
| Official name | Сэрвэн Нарны Цахилгаан Станц |
| Country | Mongolia |
| Location | Altai City, Govi-Altai |
| Coordinates | 46°25′31.8″N 96°18′56.0″E / 46.425500°N 96.315556°E |
| Status | Operational |
| Commission date | 2023 |
| Construction cost | US$10.4 million |
| Power generation | |
| Nameplate capacity | 10 MW |
| Annual net output | 20 GWh |
The Serven Solar Power Plant (Mongolian: Сэрвэн Нарны Цахилгаан Станц) is a photovoltaic power station in Altai City, Govi-Altai Province, Mongolia.
The project to construct the power plant was approved in September 2018. The power plant was commissioned in 2023 in an inaugural ceremony held on 3 September 2023 attended by Prime Minister Luvsannamsrain Oyun-Erdene.
The power plant has an installed generation capacity of 10 MW. It generates 20 GWh of energy annually.
The power plant was constructed with a cost of US$10.4 million. It was funded by loan from the Asian Development Bank and co-financed by the Strategic Climate Fund and Joint Crediting Mechanism.