Platform | |||||||||||||
| Chinese name | |||||||||||||
| Simplified Chinese | 石围塘站 | ||||||||||||
| Traditional Chinese | 石圍塘站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | West of the intersection of Fangcun Avenue (芳村大道) and Shancun Road (山村路), Shiweitang Subdistrict Liwan District, Guangzhou, Guangdong China | ||||||||||||
| Coordinates | 23°6′22.46″N 113°13′12.36″E / 23.1062389°N 113.2201000°E | ||||||||||||
| Operator | Guangzhou Metro Co. Ltd. | ||||||||||||
| Line | Line 11 | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | 1119 | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2024 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Shiweitang Station (simplified Chinese: 石围塘站; traditional Chinese: 石圍塘站; pinyin: Shíwéitáng Zhàn; Cantonese Yale: Sekwàitòhng Jaahm) is a station on Line 11 of the Guangzhou Metro. It started operations on 28 December 2024. It is located underground at the west of the intersection of Fangcun Avenue and Shancun Road in Liwan District.
There is a set of double storage lines on the east side of the station which facilitate as train sidings.
| G | - | Exits C & D |
| L1 | Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Facilities |
| L2 | Mezzanine | Station Equipment |
| L3 Platforms |
Platform 2 | |
| Island platform, doors will open on the left (Toilets, Nursery) | ||
| Platform 1 | 11 Outer Circle (Fangcun) | |
The station has 2 points of entry/exit. Exit C is equipped with an elevator.
Due to the impact of the early expropriation and demolition and the adjustment of the line planning, the station was postponed until 2019 to start the engineering work of the cross-line bridge section from Huadi River to Shiweitang on Fangcun Avenue, and on 28 March 2020, the Shiweitang railway cross-line bridge was enclosed and demolished again. It is the latest station for Line 11 to start construction.
On 10 April 2022, the construction of the underground diaphragm wall was completed, and the main structure was topped out on 18 March 2023.
On 28 December 2024, the station was put into use with the opening of Line 11.
{{cite web}}: CS1 maint: deprecated archival service (link){{cite web}}: CS1 maint: deprecated archival service (link) Alt URL{{cite web}}: CS1 maint: deprecated archival service (link)