The Changchun–Shenzhen Expressway (Chinese:长春—深圳高速公路), designated as G25 and commonly referred to as the Changshen Expressway (Chinese:长深高速公路), is an expressway that connects the cities of Changchun, Jilin, China, and Shenzhen, Guangdong. When complete, it will be 3,585km (2,228mi) in length.
The Tangjin Expressway gets its name by the combination of two one-character Chinese abbreviations of both Tangshan and Tianjin (Tangshan—Tang, Tianjin—Jin).
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(November 2021)
Symbols: ↗ = exit; ⇆ = main interchange; S = service area; ¥ = central toll gate
The Ministry of Transport of the People's Republic of China has initiated a nationwide standardization of highway naming and numbering. Expressways incorporated into the National Trunk Highway System will gradually adopt new names to replace old ones. Below is a reference to the former names of different sections along the route.
Jilin Section
Fully operational.
Changchun to Shuangliao Expressway: This section begins at West Fourth Ring Road in Changchun, intersecting with the Changchun Ring Expressway. It passes through Daling, Huaide, Qinjia Tun, Bawu, Shiwu, Sangshutai, and Shuangshan, ending at Dafu Interchange in Shuangliao, where it connects to the Daguang Expressway.
The total length of this section is 124.681km, and the construction included roadbed, pavement, bridges, safety facilities, landscaping, environmental protection, buildings, and electrical systems.
Construction started in April 2013, with land acquisition and major works completed by 2014. The Daling to Shuangliao segment (118.5km) was completed and opened in 2015, and the entire section was fully operational by November 30, 2017.
First six-lane mountainous expressway in Hebei province, with bridges and tunnels comprising over 40% of the route.
The Chengde section (82.3km) starts in Shuangluan District, linking with Beijing-Chengde Expressway, passing through Anjiang, Liuzhangzi, Lijiaying, Miaojiaying, Baimachuan, Anziling, Banbishan, Wangzhangzi, and ending at Cheng-Tang border with Tangshan.
The Tangshan section (43.655km) was completed in two phases:
Phase 1: Fengrun District to Zunhua Nanxiaoying (opened in 2007).
Phase 2: Extends from Nanxiaoying through Datangyu, Qianlihetian, Houjiazai to Ganzhayu at the Tangshan-Chengde border, crossing several railway lines and national highways.
The expressway includes 4 interchanges, 16 grade-separated crossings, 29 bridges, 1 tunnel, a main toll station, and a service area.
Begins at the Jiangsu-Shandong border (south of Anti-Japanese Mountain in Ganyu County) and connects to the Shandong section of G25 Changshen Expressway in Linyi.
Ends at Songtiao, connecting to Ninglian Expressway.
The total length is 55.698km, including a 4.294km port connection road.
Opened in November 2010.
Jiangsu Section
Fully operational.
Zhejiang Section
Fully operational.
Key expressways forming this section:
Ning-Hang Expressway
Hangzhou Ring Expressway
Hang-Xin-Jing Expressway
Lin-Jin Expressway
Jin-Li-Wen Expressway
Li-Long-Qing Expressway
Fujian Section
Fully operational.
Key expressways forming this section:
Song-Jian Expressway
Pu-Nan Expressway
San-Fu Expressway
Quan-San Expressway
Yong-Wu Expressway
Guangdong Section
Fully operational, except for the section between Jinqian'ao Interchange and Wutong Interchange.