South City Line

South City Line
 S-C 
South City train at Te Waihorotiu
Overview
Service typeCommuter rail
SystemPublic transport in Auckland
LocaleAuckland, New Zealand
First service13 September 2026
Current operatorAuckland One Rail
Route
TerminiPukekohe
Newmarket
Stops23
Service frequency10 minutes (peak)
15 minutes (off-peak)
Lines used
Technical
Rolling stockAM class
Track gauge1,067 mm (3 ft 6 in)
ElectrificationOverhead line, 25 kV 50 Hz AC
Track ownersKiwiRail (tracks and platforms)
Auckland Transport (trains and buildings)
Route map
km
Karanga-a-Hape
Te Waihorotiu
0.0
Waitematā
Grafton
Parnell
3.7
Newmarket
4.8
Remuera
6.2
Greenlane
7.6
Ellerslie
9.1
Penrose
Ōtāhuhu
Middlemore
Papatoetoe
Puhinui
Homai
Manurewa
Te Mahia
Takaanini
33.1
Papakura
Drury
Ngākōroa (under construction)
Paerātā
51.3
Pukekohe

The South City Line (S-C) is a train service operating in Auckland, New Zealand. The line runs between Pukekohe and Newmarket via Grafton. It connects to other rapid transit lines: AirportLink Bus, NX1, NX2, East West Line (E-W), Onehunga West Line (O-W) and WX1. Prior to the opening of the City Rail Link on 13 September 2026, services ran direct to Waitematā from Newmarket via Parnell as the Southern Line. The South City Line runs every 10 minutes during peak times and every 15 minutes during off-peak.

Routing

From Pukekohe in the south of the Auckland Region, South City Line services operate northward via the North Island Main Trunk. At Westfield Junction, trains pass onto the North Auckland Line to reach Grafton via Newmarket. After Grafton, trains enter the City Rail Link tunnels to rejoin the North Island Main Trunk, passing beneath the Auckland CBD through the underground stations Karanga-a-Hape, Te Waihorotiu and Waitematā. After re-surfacing on the eastern side of the CBD, trains turn back southward onto the short Newmarket Line to return to Newmarket, where services terminate.

Prior to the opening of the City Rail Link, Southern Line services used the Newmarket Line from Waitematā to Newmarket, then followed the North Auckland Line to Westfield Junction, and thence onto the North Island Main Trunk (NIMT) line as far as Pukekohe. In its entirety, this line followed the original 1875 North Island Main Trunk route between central Auckland and Pukekohe.

The line, originally single-tracked, was duplicated, piecemeal, between 1909 and 1939. In 1915, the original single-track Parnell tunnel was bypassed by a twin-track tunnel. The older tunnel can be seen alongside the current one, between Parnell station and Newmarket Junction.

History

In 1930, the Westfield Deviation opened a new eastern route for the NIMT between Auckland and Westfield via Glen Innes. The route between Auckland and Westfield via Newmarket then ceased to be part of the NIMT. The portion between Newmarket and Westfield became part of the North Auckland Line (NAL), which runs between Westfield and Whangārei.

The Southern Line suburban services continued to run on the older route. A new line, called the Eastern Line, was introduced for services on the new route. While the Eastern and Southern lines have a different route between Auckland and Westfield, they share the same tracks between Westfield and Puhinui station.

Third Main Line

Construction for the third main line, as part of the Wiri to Quay Park began in 2020 and was completed by 2025. It is expected to ease congestion on Auckland rail lines by allowing "through" trains to pass stationary trains at stations, improve rail freight access from the Port of Auckland to the Westfield yards and allow more frequent passenger and freight services. The new line runs between Westfield Junction and just south of Wiri Depot.

The $315 million funding package for these works was announced as part of the Government's New Zealand Upgrade Programme.[citation needed]

Electrification

Along with the rest of Auckland's suburban railway network, the Southern Line was electrified from Waitematā to Papakura, with electric services beginning in 2014. Services between Pukekohe and Papakura were initially provided by diesel multiple units (DMUs). In 2020, as part of the New Zealand Upgrade Programme, the government announced $371 million in funding to extend electrification from Papakura to Pukekohe. The project was completed in early 2025, and electric train services from Pukekohe commenced on 3 February 2025.

Replacement

After the opening of the City Rail Link on 13 September 2026, the Southern Line became the South City Line; trains now run Pukekohe to Newmarket, then to Waitematā railway station via Grafton and the City Rail Link before returning to Newmarket via Parnell and terminating.

Stations

NameOpenedNotes
Newmarket20 December 1873
Parnell12 March 2017
Waitematā7 July 2003
Te Waihorotiu13 September 2026
Karanga-a-Hape13 September 2026
Grafton11 April 2010
Newmarket20 December 1873
Remuera20 December 1873
Greenlane20 December 1873
Ellerslie20 December 1873
Penrose24 December 1873
Ōtāhuhu20 May 1875New station and bus-train interchange opened 29 October 2016.
Middlemore20 July 1947
Papatoetoe20 May 1875
Puhinui29 June 1925New station and bus-train interchange opened 26 July 2021.
Homai15 August 1924
Manurewa20 May 1875
Te Mahia16 August 1926
Takaanini9 December 1913
Papakura20 May 1875
Drury2 August 2026
Paerātā2 August 2026
Pukekohe20 May 1875

Future

Ngākōroa Station is under construction and due to open in 2027. The station will be located on the existing rail line between Paerātā and Drury, about 450 m south of the existing intersection of State Highway 22/Karaka Road and Jesmond Road.

See also

References

  1. 1 2 3 Saadi, Rawan (11 September 2026). "What will and won't change with the CRL opening". RNZ. Retrieved 15 September 2026.
  2. ↑ "Network and timetable changes for the City Rail Link (CRL)". Auckland Transport.
  3. ↑ "South City train line". Auckland Transport. Retrieved 15 September 2026.
  4. ↑ "The Third Main Line". KiwiRail. 2025.
  5. ↑ "Agenda for a meeting of the Infrastructure Committee - 5.9 Hamilton to Auckland Passenger Rail – Progress Update and Future Direction" (PDF). Waikato District Council. 27 June 2017. Archived (PDF) from the original on 13 April 2021.
  6. ↑ "The Third Main Line". KiwiRail. 2023.
  7. ↑ Coughlan, Thomas (29 January 2020). "Government announces billions of infrastructure spending, with roads the big winner". Stuff. Archived from the original on 1 February 2020. Retrieved 2 February 2020.
  8. ↑ "Electric trains to Pukekohe". Auckland Transport. Retrieved 8 June 2023.
  9. ↑ "Trains return to Pukekohe after two-year station closure". RNZ. 3 February 2025. Retrieved 3 February 2025.
  10. ↑ "South-City Line". Auckland Transport. Retrieved 15 July 2026.
  11. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Scoble, Juliet (2010). "Names & Opening & Closing Dates of Railway Stations" (PDF). Rail Heritage Trust of New Zealand. Archived from the original (PDF) on 24 January 2018. Retrieved 11 November 2018.
  12. ↑ "New Otahuhu Station and a New Network for South Auckland". Auckland Transport. Archived from the original on 31 October 2016. Retrieved 25 October 2016.
  13. ↑ "Puhinui Station reopens Monday 26th July 2021". Auckland Transport. 27 July 2021.
  14. 1 2 "Opening date for two new Auckland train stations revealed". 1 News. 16 July 2026. Retrieved 16 July 2026.
  15. ↑ "Southern station locations announced". KiwiRail. 11 February 2021. Retrieved 27 May 2022.