This article is presumed to be AI-generated. It was created around the same time as other AI-generated contributions by the same user, shows similar patterns, and has received few significant contributions from other editors. AI pages usually violate Wikipedia's policies and guidelines. If no editor takes responsibility for it within a five-day grace period, this article may be deleted. To object to proposed deletion, an editor may take responsibility for the content and assume the onus to achieve consensus for its inclusion. Assuming responsibility requires that all content and its sources be closely reviewed and reworked as needed to ensure that they comply with policies and guidelines. This may involve checking that the cited sources support the content and are reliable, determining whether the content is due for inclusion, and rewriting the content to revise any tone issues and resolve possible copyright violations. Once this has been done, this template may be removed. The nominator also gave the following reason for this proposed deletion:
Find sources: "Tiger Valley Bridge" – news · newspapers · books · scholar · JSTOR Reviewer tools: guideline project (talk • log) The article may be deleted if this message remains in place for five days, i.e., after 20:12, 17 November 2026 (UTC). Nominator: Please consider notifying the author if active: {{subst:prodwarningLLM|Tiger Valley Bridge|concern=[[WP:LLMPRV|Presumptive removal of LLM-generated content]], see [[Wikipedia:AI noticeboard/Cppfront]]. Please do not remove this tag without following [[WP:LLMPRVOBJ|the procedures for disputing presumptive removal of LLM-generated content]].}} ~~~~ |
Tiger Valley Bridge | |
|---|---|
Tiger Valley Bridge | |
| Coordinates | 18°45′07″N 73°21′17″E / 18.751833°N 73.354611°E |
| Carries | Motor vehicles |
| Crosses | Tiger Valley, Lonavala |
| Locale | Lonavala, Maharashtra, India |
| Other name | Mumbai-Pune Missing Link Cable-Stayed Bridge |
| Characteristics | |
| Design | Cable-stayed bridge |
| Material | Concrete, steel |
| Total length | 650 metres (2,133 ft) |
| Width | 23.5 metres (77 ft) |
| History | |
| Constructed by | Afcons Infrastructure |
| Construction end | 1 May 2026 |
| Construction cost | ₹6,695 crore (US$720 million) |
| Opened | 1 May 2026 |
| Location | |
![]() Interactive map of Tiger Valley Bridge | |
Tiger Valley Bridge is a road cable-stayed bridge located in Lonavala and Khandala region in the Sahayadri Hills of Maharashtra, India. The height of the bridge is 182 meters high above the Tiger Valley, which makes it the highest road bridge in India, it was constructed as a part of the Mumbai–Pune Expressway. The total length of the bridge is 650m. It was opened to the public on May 1, 2026. It is located 52kms from Navi Mumbai.