Vermont Transit Corridor

 Vermont Transit Corridor  
Overview
StatusBRT under construction
Stations13
Service
TypeBus rapid transit
Rapid transit (future)
SystemMetro Busway
Technical
Line length12.5 miles (20.1 km)
Route map

Sunset
B Line
Santa Monica
B Line
3rd Street
Wilshire
B Line‍D Line
Pico
Adams
Expo
E Line
Vernon
Slauson
Florence
Manchester
Century
Athens I-105 (1961).svg I-105
C Line
120th Street
(layover)

Handicapped/disabled access All stations are accessible

The Vermont Transit Corridor is a under construction 12.5-mile (20.1 km) bus rapid transit line in the Metro Busway network in Los Angeles, California with plans to convert it to rapid transit in the future. It is planned to operate on a north-to-south route on Vermont Avenue between the B Line's Vermont/Sunset station and the C Line's Vermont/Athens station on the Los Angeles Metro Rail system. The project feasibility study was released in February 2019 with a proposed completion date of 2028 for BRT and after 2067 for rail. It is part of Metro's Twenty-eight by '28 initiative and is partially funded by Measure M. The route will have signal priority at traffic lights and will have a dedicated right of way. Metro reports the initial cost is $425 million.

Recent developments

In early 2025, LA Metro released a strategic three-phase plan for implementing dedicated bus lanes along Vermont Avenue. The plan details near-term, mid-term, and long-term improvements aimed at enhancing bus service, including the installation of curbside bus lanes, signal priority measures, and upgraded station infrastructure.

Subsequently, on March 19, 2025, Metro’s Planning and Programming Committee approved a California Environmental Quality Act (CEQA) exemption for the Vermont Transit Corridor project. This approval allows the project to move forward into the environmental review phase, representing a key milestone in the planning process.

On March 27, 2025, the Metro Board approved the locally preferred alternative (LPA) for the Vermont Transit Corridor project, selecting a 12.4-mile side-running bus rapid transit (BRT) line with 26 stations at 13 major intersections. The project was determined to be exempt from the California Environmental Quality Act (CEQA) under Senate Bill 922, which facilitates the approval of sustainable transit initiatives. With this designation, Metro is now proceeding with the National Environmental Policy Act (NEPA) review and advancing into preliminary engineering to further develop the project design.

In the summer of 2026, Metro secured an additional $150 million in federal funds to commence work.

On October 21, 2026, Metro broke ground on construction for the line.

History

Vermont between Wilshire and 6th, 2017

Until 1963, Vermont Avenue was served by several Los Angeles Railway Yellow Car streetcar lines: the F, K, R, S, U, and V. After streetcars ceased running under the Los Angeles Metropolitan Transit Authority, tracks were torn up, and buses replaced service.

As of 2020 Vermont is the second busiest bus corridor in ridership, with 45,000 boarding per work day. Metro estimates this BRT will have 75,000-weekday boardings once completed. For that reason, light rail and subway options are also being developed. Metro is looking for ways to accelerate the option. Rail-based options are not scheduled to receive Measure R funds until after 2067.[non-primary source needed]

Initial alternative analysis

Two alternative analyses were developed.

Bus rapid transit

Metro currently plans to construct bus rapid transit with various stations along its route. Each will be spaced about one mile (1.6 km) apart. Metro studied three options for BRT:

These feasibility options were sent to formal environmental review status. A Draft Environmental Impact Report (DEIR) was never released for the BRT project because the current phase was granted a statutory CEQA exemption under California Senate Bill 922. The Metro Board formally approved the project's California Environmental Quality Act (CEQA) exemption and its Locally Preferred Alternative (LPA) in March 2025. This allowed the project to bypass a lengthy traditional environmental impact report process and proceed directly into final design and construction.

Rail

For rail, concepts have been published in the feasibility study. Measure M funds for rail are expected to become available after 2067.

The following concepts were published:

Route

The corridor includes Vermont Avenue between Hollywood Boulevard and 120th Street. Destinations along the route include Exposition Park and its museums Lucas Museum of Narrative Art, the Natural History Museum and the California Science Center. Also, local sports stadiums, the Los Angeles Memorial Coliseum and BMO Stadium. USC is along the route. It would also connect with the E Line at Expo/Vermont station.[non-primary source needed]

The following table shows potential BRT metro stations, per feasibility study from north to south. Also listed are existing light rail and subway stations.

Station options Alt 1 BRT Alt 2 LRT Alt 3 HRT Connecting
services
Community Notes
Vermont/Sunset check - check B Line B Line Little Armenia, East Hollywood Existing subway station
Vermont/Santa Monica check - check B Line B Line Little Armenia, East Hollywood Existing subway station
Vermont/Beverly - - check B Line B Line Wilshire Center Existing subway station
Vermont/3rd Street check - - Koreatown
Wilshire/Vermont check check check B Line B Line
D Line D Line
Existing subway station
Vermont/Pico check check check Pico-Union
Vermont/Adams check - - West Adams
Expo/Vermont check check check E Line E Line Expo Park, USC Existing light rail station
Vermont/Vernon check - - South Los Angeles
Vermont/Slauson check check check
Vermont/Florence check check -
Vermont/Manchester check check check Vermont Vista
Vermont/Century check check -
Vermont/Athens check check check C Line C Line Athens/Vermont Vista Existing light rail station
Vermont/120th Street - check check Harbor Gateway, Los Angeles Southwest College/Vermont Vista Future layover for BRT

South Bay extension

Metro is also conducting a BRT, LRT, and HRT feasibility study to extend the route a further ten miles (16 km) past 120th Street south along Vermont Avenue to Ken Malloy Harbor Regional Park terminating at Pacific Coast Highway.

Nearby destinations would include Los Angeles Harbor College, Kaiser Permanente South Bay Medical Center, and Pacific Coast Highway station (J Line).

A feasibility study was conducted and released in 2023. Metro staff recommended no further study be conducted. Incremental BRT and rail service was recommended once BRT or Rail service has begun on the full corridor.

References

  1. 1 2 Tinoco, Matt (May 7, 2018). "A subway on Vermont? Metro is considering it". Curbed LA. Archived from the original on May 8, 2018. Retrieved August 19, 2020.
  2. 1 2 3 Next stop: a new kind of bus ride on Vermont (PDF). Amazon News (Report). Metro. Retrieved August 19, 2020.
  3. 1 2 3 4 Carino, Meghan McCarty (May 10, 2018). "A rail down Vermont would get high ridership. Why could it take 50 years?". 89.3 KPCC. Retrieved January 21, 2021.
  4. ↑ "We're planning a new way to ride on Vermont" (PDF). media.metro.net. Archived (PDF) from the original on September 11, 2024. Retrieved April 19, 2025.
  5. ↑ Sharp, Steven (September 12, 2024). "Metro plans bus lanes on Vermont Avenue in 2025 | Urbanize LA". la.urbanize.city. Retrieved April 19, 2025.
  6. ↑ "2025-0044 - VERMONT TRANSIT CORRIDOR ENVIRONMENTAL AND PLANNING STUDY - Metro Board". boardagendas.metro.net. Retrieved April 19, 2025.
  7. ↑ https://www.masstransitmag.com/bus/infrastructure/news/55413991/los-angeles-county-metropolitan-transportation-authority-metro-la-metro-breaks-ground-on-vermont-brt-project
  8. ↑ Hymon, Steve (October 21, 2026). "Better bus service is on the way for Vermont Avenue". The Source. Los Angeles Metro. Retrieved October 24, 2026.
  9. 1 2 3 Vermont Transit Corridor –Rail Conversion/Feasibility Study FINAL REPORT (PDF) (Report). Metro. February 2019.
  10. ↑ Hymon, Steve (April 26, 2019). "Into the great wide open, Vermont BRT, bullet train: HWR, April 26". Metro. The Source. Retrieved August 19, 2020.
  11. ↑ "Bus and Rail System Map" (PDF). Los Angeles Metro. Retrieved December 3, 2018.
  12. ↑ "Vermont Transit Corridor South Bay Extension Feasibility Study". LA Metro.
  13. ↑ "Vermont transit corridor - South bay extension feasibility study" (PDF). Archived from the original (PDF) on September 3, 2024.
  14. ↑ "Numble (@numble) on X". X (formerly Twitter).