Platform | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 溪涌 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Xichong Xihai Road (溪涌溪海路) Kuichong Subdistrict, Dapeng New Area, Shenzhen, Guangdong China | ||||||||||||
| Coordinates | 22°36′53.827″N 114°21′20.491″E / 22.61495194°N 114.35569194°E | ||||||||||||
| Operator | SZMC (Shenzhen Metro Group) | ||||||||||||
| Line | Line 8 | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2025 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Xichong station (Chinese: 溪涌; pinyin: Xīchōng; Jyutping: kai1 cung1; Cantonese Yale: Kāichūng) is a station on Line 8 of the Shenzhen Metro. It opened on 28 December 2025, with the Phase 3 extension of the line serving as its terminus station. It is located under Xihai Road.
Xichong station was the one and only station on the Line 8 Phase III extension. Trial runs for Phase III and the station began on 1 November 2025.
| G | – | Exits A-D |
| B1F Concourse |
Lobby | Ticket Machines, Customer Service |
| B2F Platforms |
||
| Island platform, doors will open on the left | ||
| 8 termination platform | ||
The station has 4 points of entry/exit. Exits B and C are equipped with elevators.