NS3A
Brickland 红砖 பிரிக்லேன்ட் Brickland | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Rapid transit | |||||||||||
| General information | |||||||||||
| Owned by | Land Transport Authority | ||||||||||
| Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
| Line(s) | |||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Station code | NS3A | ||||||||||
| History | |||||||||||
| Opening | mid-2030s | ||||||||||
| Electrified | Yes | ||||||||||
| Services | |||||||||||
| |||||||||||
Brickland MRT station (NS3A) is a future Mass Rapid Transit station on the North South line in Choa Chu Kang, Singapore.
The station was first announced on 25 May 2019 as part of the Land Transport Authority's (LTA) Land Transport Master Plan 2040.