| Ana Tower | |
|---|---|
![]() | |
General information | |
| Status | Completed |
| Type | Office |
| Location | Bucharest, Romania |
| Coordinates | 44°28′48″N 26°03′56″E / 44.4801°N 26.0656°E |
Completed | 2019 |
| Opening | March 2020 |
| Cost | €60,000,000 ($71,000,000) |
| Owner | Ana Holding |
| Height | |
| Roof | 110 m (360 ft) |
| Technical details | |
| Structural system | Concrete |
| Floor count | 24 (+1 technical) |
| Floor area | 43,700 m2 (470,000 sq ft) |
| Lifts/elevators | 8 |
| Design and construction | |
| Architects | Vladimir Arsene, Călin Negoescu (Westfourth Architecture) |
| Developer | George Copos |
Structural engineer | Tiberiu Vișan (Popp & Associates) |
| Website | |
| anatower | |
Ana Tower is a class A office building in Bucharest, Romania. Completed in 2019, it is the fourth tallest building in the country, being divided into 24 floors (+1 technical) and standing at a total of 110 metres (361 ft) tall. Upon its completion, the building received a LEED Platinum Certificate awarded by the U.S. Green Building Council on 11 June 2020. The building was inaugurated in March 2020.