Bob Hawke College

Bob Hawke College
Bob Hawke College in August 2021
Location

Australia

31°56′40″S 115°49′57″E / 31.944444°S 115.832365°E / -31.944444; 115.832365 (Bob Hawke College) Edit this at Wikidata
Information
Other nameInner City College
TypePublic co-educational partially selective high school
MottoExtraordinary Together
Established2020
School code
4213
Principal
Rohan Smith
Years7–12
Enrolment2,000 (2025 estimate)
Campus type
Urban
Websitebobhawkecollege.wa.edu.au Edit this at Wikidata

Bob Hawke College is a public high school in the state of Western Australia, Australia and situated in the suburb of Subiaco. The school opened on 3 February 2020 with 250 Year 7 students, and has expanded to around 2,100 students from Years 7 to 12 in 2026.

The school integrates the playing surface of the former Subiaco Oval stadium, which was demolished in December 2019, into its campus. The refurbished oval was open to students in May 2020, and to the general public the following month.

History

In 2017, the government of Western Australia proposed to move students from Perth Modern School to a new high-rise building in the Perth central business district. This proposal was opposed by many members of the Perth Modern School community. On 13 June 2017, the plan was changed to instead build a new school at Mueller Park, which is close to Perth Modern School. The college was expected to take pressure off[citation needed] Churchlands Senior High School, Mount Lawley Senior High School, Shenton College and Dianella Secondary College. During its planning and early construction, the college was known as Inner City College. After the death of Bob Hawke in May 2019, the school was confirmed to be named in honour of him.

At the start of 2024, the "Stage 2" building of the college was completed. The new four- storey campus includes a rooftop terrace and a concrete theatre. Costing $53.9 million, the campus doubled the school's capacity to 2,000 students, housing new classrooms for the performing arts, languages, and music. Two new media suites, engineering workshops, and a fitness centre were also built as part of Stage 2.