Roma Street railway station

Roma Street
View from upper Albert Street in August 2026
General information
LocationRoma Street, Brisbane
Coordinates27°27′55″S 153°01′09″E / 27.4652°S 153.0191°E / -27.4652; 153.0191
OwnerQueensland Rail
OperatorQueensland Rail
Lines
Distance0.75 kilometres (0.47 mi) from Central
Platforms10 (4 side, 3 islands)
Tracks10
ConnectionsRoma Street busway station
Construction
Structure type
Ground (Terraced)
AccessibleYes
Other information
StatusStaffed
Station code600037 (platform 2)
600033 (platform 3)
600036 (platform 4)
600034 (platform 5)
600030 (platform 6)
600028 (platform 7)
600029 (platform 8)
600038 (platform 9)
600035 (platform 10)
Fare zoneZone 1
WebsiteQueensland Rail
History
Opened14 June 1875; 151 years ago (1875-06-14)
Former namesBrisbane
Passengers
2022–231,780,252
Rank3
Services
Preceding station Queensland Rail Queensland Rail Following station
Central Milton
towards Ipswich or Rosewood
Central
towards Kippa-Ring
Milton
Central
towards Doomben
Terminus
Central
towards Shorncliffe
South Brisbane
towards Cleveland
Central South Brisbane
Central
towards Ferny Grove
South Brisbane
towards Beenleigh
Long-distance services
Preceding station Queensland Rail Queensland Rail Following station
Terminus Spirit of Queensland Caboolture
towards Cairns
Tilt Train Caboolture
towards Rockhampton
Spirit of the Outback Caboolture
towards Longreach
The Westlander Corinda
towards Charleville
Interstate services
Preceding station NSW TrainLink Following station
Terminus NSW TrainLink North Coast Line
Sydney XPT
Kyogle
towards Sydney
Location

Roma Street is a commuter and long-distance passenger railway station located in the central business district of Brisbane, Queensland. It is the junction station for the North Coast, Main, Gold Coast and NSW North Coast lines. The station is one of four inner city stations that form a core corridor through the centre of Brisbane.

Although not easily visible to the public, the original 1873 Roma Street railway station building still exists within the modern complex and is listed on the Queensland Heritage Register.

History

1800s to 1940s

The station in 1883

The construction of a railway station on Roma Street was part of a plan to extend the Main Line to Brisbane. An iron station building designed by Sir Charles Fox & Sons was to be imported from the United Kingdom for this purpose, but economic problems in Queensland led to the order being cancelled. In 1873, the Superintendent of Public Buildings Francis Stanley designed a smaller station for the site, with construction beginning in the same year under John Petrie. The station was officially opened on 14 June 1875 as Brisbane at the same time that the Main Line opened to Indooroopilly.

A goods and carriage shed were added shortly after. In 1882, Roma Street became a junction station with the North Coast line opening to Sandgate. With the opening of Central station as Brisbane's principal station on 18 August 1889, the station was renamed Roma Street. As traffic grew, so did the Roma Street precinct with a locomotive shed added.

In 1911, the precinct was rearranged with the locomotive and carriage sheds relocated to Mayne near Bowen Hills.

On 30 November 1940, Roma Street again became the principal station for long-distance services with new platforms built to the south of the existing platforms.

1970s to early 2000s

Roma Street station in 1983, prior to its expansion

Following the opening of the Merivale Bridge on 18 November 1978, Roma Street was also served by Beenleigh line services. On 21 June 1986, it became a dual gauge station with the extension of the standard gauge NSW North Coast line from South Brisbane. In October 1986, the Brisbane Transit Centre opened to the south of the station.

As part of the quadruplication of the North Coast line to Bowen Hills, the station was rebuilt. On 1 November 1995, a new Platform 10 was opened on the station's north side as the platform for long-distance services; these services had previously used Platforms 2 and 3. Platforms 7, 8 and 9 opened on 11 June 1996 while refurbished Platforms 4, 5 and 6 reopened in January 1997.

In 2001, Roma Street Parkland opened to the north of the station on the site of the former Roma Street goods yards. Visitors not travelling on Queensland Rail services can obtain a free pass to transit through the station concourse from Roma Street to the parklands.

Platform 1 became part of the Roma Street busway station on 19 May 2008, with the construction of the Inner Northern Busway.

Cross River Rail and Brisbane Metro Projects

The original station building

Roma Street Station will be affected by both the Cross River Rail and Brisbane Metro projects.

The Brisbane Transit Centre complex was planned to be demolished in 2020. Businesses in the existing buildings were closed down between late 2018 and early 2019, with reports of controversy surrounding claims for compensation by small business tenants.

According to the Cross River Rail Construction plan, new underground platforms will be constructed to service Cross River Rail services. The next stations for the Cross River Rail services will be Albert Street (southbound) and Exhibition (northbound).

The Brisbane Metro Line 1 services terminate at Roma Street Station, with the previous station being King George Square. Brisbane Metro Line 2 services continue through Roma Street following the existing Northern Busway route, with the next stations being Normanby (northbound) and King George Square (southbound).

Due to the demolition of the Brisbane Transit Centre, a temporary long-distance bus terminal was constructed on the opposite side of Roma Street Station (near Platform 10) and opened in September 2019.

The Tunnel Boring Machine (TBM) Else broke through into the new Roma Street station cavern on the 6 August 2021. The second one, TBM Merle, arrived on 23 August 2021.

Services

Roma Street station is served by all suburban and interurban City network lines.

It is also the terminus station for long-distance Traveltrain services and NSW TrainLink's service to Sydney. A motorail loading dock was previously located on Platform 10 but it was removed in 2015.

Platforms and services

Roma Street
Platform Line Type Destination Notes
1  Northern Busway  Bus Outbound M1, M2, 61, 205, 222, 325, 330, 333, 340, 345, 350, 359, 385, 390, 444, 453, 454, 460
2  Northern Busway  Inbound
3  NSW Trainlink North Coast  Rail Sydney Central
4 T6 Beenleigh Beenleigh
T5 Varsity Lakes Varsity Lakes
5 T6 Beenleigh Beenleigh
T4 Cleveland Cleveland
6 T6 Beenleigh Beenleigh
T6 Ferny Grove Ferny Grove
T3 Doomben Doomben
T5 Brisbane Airport Domestic Airport
T5 Varsity Lakes Varsity Lakes
T4 Shorncliffe Shorncliffe
7 T6 Ferny Grove Ferny Grove
T1 Caboolture Caboolture
T3 Doomben Doomben
T5 Brisbane Airport Domestic Airport
T4 Shorncliffe Shorncliffe
T1 Nambour/Gympie North Nambour or Gympie North
8 T1 Ipswich/Rosewood Ipswich or Rosewood
T2 Springfield Central Springfield
9 T1 Caboolture Caboolture
T2 Kippa-Ring Kippa-Ring
T1 Nambour/Gympie North Nambour or Gympie North
10  Spirit of Queensland  Cairns Long-distance services
 Spirit of the Outback  Longreach
 Tilt Train  Bundaberg or Rockhampton
 The Westlander  Charleville
11 Under construction for Cross River Rail
12 Under construction for Cross River Rail

To the north of the station is the Brisbane Coach Terminal that opened in 2019 as replacement for the Brisbane Transit Centre. It is used by long distance Bus Queensland, Crisps Coaches, Greyhound Australia, Murrays, NSW TrainLink and Premier Motor Service services.

To the south of the station is Roma Street busway station on the Northern Busway that is served by Transport for Brisbane.