The Calder Valley line (also previously known as the Caldervale line) is a railway route in northern England; it connects the large settlements of Leeds, Manchester and Blackpool. It is the slower of the two main railway routes between Leeds and Manchester, and is the northernmost of the three main trans-Pennine routes.

History

Railway lines around Manchester (1910)
Railway lines in Leeds (1913)

Before the 1923 Grouping, the first section of the line (Leeds–Bradford) was owned by the Great Northern Railway (GNR); and the entire remainder by the Lancashire and Yorkshire Railway (L&YR), apart from the final section of the branch leading into Huddersfield, which was owned by the London and North Western Railway (LNWR).

For the section between Halifax and Burnley, the line uses the valley of the river Calder; this comprises two separate valleys with rivers of the same name: that of West Yorkshire and of Lancashire. It also follows the Rochdale Canal from Todmorden into Manchester. Since the route crosses the Pennines, there are many tunnels to negotiate.

The British Railways Board's Corporate Plan for 1983–88 marked the routes between Milner Royd Junction (east of Sowerby Bridge) and Bowling Junction (south of Bradford Interchange), and Milner Royd Junction and Heaton Lodge Junction (west of Mirfield) to be singled on a list, entitled The Proposed Elimination of Non-Essential Multiple Tracks. A combination of factors meant this was never implemented; the better gradients for freight than the Huddersfield trans-Pennine route and the mid-1980s uncertainty over the Settle-Carlisle line meant that this became the preferred route for goods between Leeds and Preston/Carlisle.

Route

Two eastbound trains west of Mirfield (1950)

The following lists the original places served by the route. Many stations on this route have been closed; those currently open are marked in bold:

Leeds–Bradford

For the initial section of the route between Leeds and Bradford, see Leeds–Bradford lines.

Bradford–Halifax

On 24 October 1901, as the 18:10 down goods train from Low Moor to Leeds was passing through Bowling Tunnel, the rear section broke loose. It came to a stop in the tunnel and was run into from behind by the 21:05 goods train from Low Moor to Laisterdyke. Wreckage that was partly blocking the up line was then hit by the 21:00 passenger train from Leeds to Manchester. Nobody was killed, but there was extensive damage to the rolling stock.

Halifax–Huddersfield

This route was reopened to passengers in 2000, when Brighouse station was reopened; two short lengths of line were relaid, after being out of use for 15 years, to enable trains to reach Huddersfield.

Halifax–Manchester Oxford Road

Eastbound local train between Mirfield and Thornhill (1953)
Calder Valley main line near Mirfield (1964)

Many stations on this route have been closed or are not served by the Calder Valley line trains; original stations served were:

On 28 February 1902, a Wakefield to Rose Grove goods train broke into two due to a broken coupling, resulting in the rear half eventually crashing at high speed into the front half in Millwood Tunnel. No-one was killed, but wreckage filled the tunnel right up to the roof.

Summit Tunnel was the scene of a major fire in 1984, caused by a goods train formed of petrol tankers was derailing.

Manchester-Blackburn

The route continues up the Calder Valley to Burnley and Blackburn; it also runs parallel with the Leeds and Liverpool Canal from Burnley. The section from Todmorden to Burnley, often called the Copy Pit line, was opened by the Manchester and Leeds Railway (later part of the L&YR) on 12 November 1849. The East Lancashire Railway (also later part of the L&YR) built the Burnley-Preston line: Burnley-Accrington, 18 September 1848, Accrington-Blackburn 19 June 1848 and the Blackburn-Preston section on 1 June 1846.

The Rose Grove–Todmorden (Hall Royd) local service over this route ended in 1965; the only passenger services thereafter being a daily Leeds–Blackpool train. In mid-1982, the last tanker train travelled over the line, with the expectation of closure shortly after. A turning point came when the National and Provincial Building Society moved staff from Burnley to Bradford; it had arranged for a Preston–Bradford Interchange train to be run to move people from their home base to Bradford offices. In October 1984, British Rail developed this into five trains each way between Leeds and Preston, with one extended to Blackpool.

Todmorden curve

The Todmorden curve is a 440-yard (400 m) section of track at Hall Royd Junction in Todmorden which was lifted in 1972. Originally Hall Royd Junction was triangular, and the lifted curve allowed services from Burnley to reach Manchester via Todmorden; regular services over it had ceased in November 1965. Reinstating the curve was a priority for Lancashire County Council and was ranked as the most important project in its 2010 Rail Improvement Schemes draft report. In March 2010, the government stated that reinstating the link would cost around £7million and any new railway services would require initial subsidy.

The MP for Burnley, Kitty Ussher, wrote to the North West Development Agency to seek assurance that it could find the money. In October 2010, Network Rail agreed to pay for the final assessment of the plans. This assessment, completed in May 2011, concluded that it could be feasible to reinstate the curve, although the original route could not be used as the original curve was deemed to be too sharp. An alternative route was instead put forward and it was stated that, if funds could be obtained by early 2012 to carry forward the project, then the curve could be back in use by the end of 2013. On 31 October 2011, the deputy prime minister, Nick Clegg, announced that the scheme would be given the go-ahead.

Construction work began in summer 2013 and the curve was planned to be available for the May 2014 timetable change. The track was completed and tested in May 2014; services began on 17 May 2015.

Original stations

Blackburn to Preston

This part of the route is described in more detail in East Lancashire line.

Preston to Blackpool

This route is described in more detail in Blackpool branch lines.


Services

Passenger train services are operated by Northern Trains, which run on the following routes:

Along with the Huddersfield and York & Selby lines, this line was combined in national timetables to show a coast-to-coast service; however, since May 2018, this has been split again into separate routes for operational reasons and to improve service reliability. Through running to Chester began in May 2019, with a limited peak provision to Ellesmere Port, via Helsby.

Services within West Yorkshire are sponsored by West Yorkshire Metro, whose tickets can be used up to Hebden Bridge between Leeds and Blackpool, and Walsden between Leeds and Manchester.

Future

A Class 195 unit calls at Halifax (2020)

Improvements to the line were proposed as part of Network Rail's 2010 Northern Hub plans, which would allow for more frequent services on the line. Some services via Bradford would also be extended to Chester, Crewe, Liverpool and Manchester Airport. The Chester services started in December 2017 under the proposed Northern Connect brand, which has since been scrapped. Those services are operated by Class 195 diesel multiple units.

In 2018, the Manchester Airport trains briefly ran over the Ordsall Curve. However, those services have also been scrapped. Track and signalling upgrades between Hebden Bridge and Leeds, following on from work already carried out between Littleborough and Manchester, which will allow for quicker journey times by the autumn of 2018. The work will see four existing signal boxes between Hebden Bridge and Mill Lane Junction in Bradford closed, with signalling control transferred to the York Rail Operating Centre; this will also take over the operation of the parts of the line through Brighouse and Mirfield, which controlled currently from Huddersfield and Healey Mills panel boxes.

Low Moor station, between Bradford Interchange and Halifax, was reopened on 2 April 2017 after the original opening planned for 2005 was delayed by the discovery of disused mine workings under the station site. A business case is being developed to reopen Elland station between Halifax and Brighouse.

Calderdale Council has called for the route to be electrified as an alternative route to the line through Huddersfield should that be closed for engineering works. Tim Swift, the council's leader in 2015, stated that: "It makes no logical sense in terms of a long term network to electrify the Trans-Pennine North Route and not the Calder Valley Line." In March 2015, the Northern Sparks report was produced by a cross-party committee of MPs focusing on economic benefits of electrification in the North; the Calder Valley line in its entirety was its number one priority, which was reiterated in 2018.

The Integrated Rail Plan for the North and Midlands (IRP) was published on 18 November 2021, stating that the line from Leeds to Bradford Interchange would be electrified.

As part of Transport for Greater Manchester's Delivery Plan, there are plans to electrify the line between Manchester Victoria to Rochdale via Mills Hill; this forms part of the 2040 strategy, subject to funding.

Notes

  1. ↑ The other is the Huddersfield line.
  2. ↑ Including Metrocards.

References

  1. ↑ "The Proposed Elimination of Non-Essential Multiple Tracks". Rail Enthusiast. November 1983. pp. 6–13.
  2. ↑ Thomas, Rhys (31 October 2016). "Then and now: The forgotten city centre station from Bradford's rail heyday". Bradford Telegraph and Argus. Retrieved 20 October 2026.
  3. ↑ "Accident Report: Bowling Tunnel" (PDF). Board of Trade. 1901.
  4. ↑ "Elland railway station gets planning go-ahead - here's when it could be built by". Halifax Courier. Retrieved 15 March 2023.
  5. ↑ "Accident Report: Millwood Tunnel" (PDF). Board of Trade. 1902.
  6. ↑ Batty, Stephen R., British Rail at Work: West Yorkshire, 1987, pp. 70–1
  7. ↑ "Todmorden and Fleetwood top Lancashire's rail list". Rail. No. 641. Peterborough. 7 April 2010. pp. 16–17.
  8. 1 2 "£7m upfront price tag for Todmorden Curve rail link". Pendle Today. Nelson. 23 March 2010. Retrieved 10 April 2010.{{cite news}}: CS1 maint: deprecated archival service (link)
  9. ↑ "UK News In Brief" (PDF). Railway Herald. No. 241. 4 October 2010. p. 5. Archived from the original (PDF) on 9 October 2011. Retrieved 6 October 2010.
  10. ↑ Moseley, Tom (17 May 2011). "Todmorden Curve could be running by 2013". Lancashire Telegraph. Blackburn. Retrieved 18 May 2011.
  11. ↑ Magill, Peter (31 October 2011). "Major boost as £9million rail link cash announced for Burnley". Lancashire Telegraph. Blackburn. Retrieved 2 November 2011.
  12. ↑ "Todmorden Curve journeys to start after May 2014". Lancashire Telegraph. Blackburn. 31 July 2012. Retrieved 4 July 2013.
  13. ↑ "Campaigners hope curve will spring into life". Todmorden News. 15 October 2014. Archived from the original on 22 January 2015. Retrieved 22 January 2015.
  14. ↑ "New direct train services between Accrington, Burnley and Manchester". Northern Rail. Archived from the original on 18 May 2015. Retrieved 17 May 2015.
  15. ↑ "Train Timetables". Northern Railway. 17 May 2026. Retrieved 20 October 2026.
  16. 1 2 "The Northern Hub". Network Rail. Retrieved 10 April 2010.
  17. ↑ "Northern Franchise Improvements - DfT". Archived from the original on 24 July 2019. Retrieved 18 December 2015.
  18. ↑ "Track and signalling works target journey time and capacity" Halifax and District Rail Action Group news article; Retrieved 10 August 2017
  19. ↑ "New station runs into further delay". Bradford Telegraph and Argus. 14 July 2016. Retrieved 26 July 2016.
  20. ↑ "New £10.8m railway station opens in Bradford". BBC News. 2 April 2017. Retrieved 2 April 2017.
  21. ↑ "Timetabling work complete ready for Bradford Low Moor opening in 2013". Rail. No. 641. Peterborough. 7 April 2010. p. 20.
  22. ↑ Bickerdyke, Paul, ed. (December 2015). "Calder Valley want wires". Rail Express. No. 235. Horncastle: Mortons Media. p. 13. ISSN 1362-234X.
  23. ↑ "Northern Sparks - report of the north of England electrification task force" (PDF). Transport for North. March 2015.
  24. ↑ "Electric Railway Charter launches to get Northern Sparks flying". Campaign for Better Transport. 4 June 2018. Retrieved 8 February 2022.
  25. ↑ "Integrated Rail Plan for the North and Midlands" (PDF). Department for Transport. 18 November 2021. ISBN 978-1-52-862947-8. Archived (PDF) from the original on 18 November 2021 – via Gov.uk.{{cite web}}: CS1 maint: periodical has ISBN (link)
  26. ↑ "Our Five Year Transport Delivery Plan: 2021-2026" (PDF). Downloads.ctfassets.net. January 2021. Retrieved 10 April 2022.
  27. ↑ "Greater Manchester Transport Strategy 2050 and Delivery Plan (2027-2037)". Tfgm.com. Retrieved 20 October 2026.

Further reading

Template:Attached KML/Calder Valley Line
KML is from Wikidata