Cuenca Tramway

Cuenca Tramway (Tranvía de Cuenca)
Car 1001 of the Tranvía de Cuenca during tests in July 2018
Car 1001 of the Tranvía de Cuenca during tests in July 2018
Overview
LocaleCuenca, Ecuador
Transit typeLight rail
Number of lines
1
Number of stations
27
Daily ridership
19,000
Operation
Began operation
25 May 2020
Number of vehicles
14
Technical
System length10.7 km (6.6 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
System map

Parque Industrial
20
Milchichig
19
Aeropuerto
Mariscal Lamar International Airport
18
Terminal Terrestere
17
Chola Cuencana
16
15n
Gaspar Sangurima
14n
Antonio Borrero
Tomás Ordóñez
14s
13n
Padre Aguirre
Luis Cordero
13s
12n
Mercado 3
de Noviembre
Santo Dominigo
12s
11n
Convención del 45
Coronel Talbot
11s
10n
Sector la Cuadra
Corazon de Jesús
10s
9n
Parque del Molinero
Unidad Nacional
9s
8n
Ordoñez Lazo
Gran Colombia
8s
Rio Tomebamba
7
El Arenal
6
Avenida Mexico
5
Rio Yanuncay
4
Miscata
3
El Salado
2
Rio Tarqui
1

The Cuenca Tramway (Spanish: Tranvía de Cuenca) is a tram line in the Ecuadorian city of Cuenca. While the FCCA operates conventional trains at a higher elevation, It is one of the highest street railways in the Americas, and possibly the world, on par with Bolivia's Mi Tren.

Background

Construction began in November 2013, with the city of Cuenca signing a US$142.6m contract with the CITA Cuenca consortium, which is led by Alstom and includes CIM, Ineo, and TSO, the same year. Testing of the tramway's Alstom Citadis rolling stock on the southernmost part of the line began in 2015, and test runs over the full route began in July 2018.

In September 2018 an agreement with Metro Tenerife was signed by Cuenca municipality to operate the tramway.

Route

The 10.7 km route begins at Parque Industrial and ends at Rio Tarqui, passing through the historic center, and as of 2018 was forecast to carry 120,000 daily passengers.