Embark Rapid

RAPID
A RAPID bus in downtown Oklahoma City
Overview
SystemEmbark (transit authority)
VehicleNew Flyer CNG Xcelsior
Began serviceDecember 3, 2023 (2023-12-03)
Route
LocaleOklahoma City, Oklahoma
StartMeridian & Expressway
EndEmbark Transit Center
Length9.5 miles (15.3 km)
Stations32
Service
FrequencyMonday-Friday: 12 minutes
Saturday-Sunday: 15 minutes
Ridership1,400/day (2026)

RAPID is a bus rapid transit (BRT) service in Oklahoma City, Oklahoma, United States. It is operated by Embark and serves a 9.5 miles (15.3 km) corridor running northwest from downtown Oklahoma City. Planning for the project began in earnest in 2018 with a federal grant, with full service beginning in late 2023. The system uses 40-foot (12 m) buses on a route featuring many BRT features, but distinctly lacking dedicated lanes.

History

Work on a bus rapid transit in Oklahoma City began in earnest in 2018, with the approval of a $14.3 million BUILD grant for the RAPID NW line. This NW line would travel 9.5 miles northwest of downtown, connecting 91,000 jobs and 40,000 residents.

All stations along the route were planned to include level boarding, ticket machines, benches, bus tracking, new sidewalks and bike racks. In addition, certain locations included transit signals, queue jumps, and combined bus/right-turn lanes. Every intersection was equipped with transit signal priority.

On December 3, 2023, the line opened with fare-free service for the remainder of December. The projected ridership for the line was anticipated to be 1,000 passengers per day. These projects were quickly outdone, with ridership steadily increasing in the years since to 1,400 per day as of 2026.

Lines in planning

In 2022, Embark proposed a RAPID route connecting downtown Oklahoma City to Tinker Air Force Base and Del City. This route would primarily traverse SE 29th Street. However, planning for this route has not advanced as a result of Midwest City, through which the route would run, withdrawing from the regional transit authority.

Beginning in the summer of 2023, public outreach and planning began in full swing for a northeast route and south route. By summer 2024, this had been refined to one 17-mile route traveling from the Adventure District to SW 89th Street and Portland Avenue. This route would serve 26 stations and connect 50,000 jobs. One year later, the City Council authorized $61 million of MAPS 4 funding for the project, allowing Embark to apply for federal grant funding to reach the $95 million project cost.

Operations

Stations

The RAPID NW route runs northwest from Downtown Oklahoma City primarily along Classen Boulevard and the Northwest Expressway. The 32 stations include benches, shelters, an arrival sign, bike racks, and a ticket kiosk.

Headways

Time 5A6A7A8A9A10A11A12P1P2P3P4P5P6P7P8P9P10P11P12A1A2A
Monday-Thursday 20 12 30 No service
Friday 20 12 30
Saturday No service 15 30
Sunday No service 15 30 No service

Buses

The RAPID system uses 9 New Flyer Xcelsior CNG buses equipped with transit signal priority.