GISAT-1 spacecraft in the cleanroom before encapsulation. | |||
| Manufacturer | |||
|---|---|---|---|
| Country of origin | India | ||
| Operator | ISRO | ||
| Applications | Earth observation | ||
| Specifications | |||
| Bus | I-2K | ||
| Launch mass | 2268 kg | ||
| Power | 2280 watts | ||
| Equipment | Ritchey-Chrétien telescope Multispectral array detectors Steerable antenna | ||
| Regime | Geostationary orbit | ||
| Design life | 7 years (planned) | ||
| Production | |||
| Status | Planned | ||
| Launched | 2 | ||
| Operational | 1 | ||
| Failed | 1 | ||
| Lost | 0 | ||
| Maiden launch | 12 August 2021, 00:13 UTC | ||
| |||
Geo Imaging Satellite or GISAT is an Indian imaging satellite class for geostationary orbit with a high temporal resolution, meant for providing near real time imaging with fast revisit capability and real time monitoring. Two satellites will provide resolution in the range of 42 to 318 m. It will carry multi-spectral (Visible and Near-InfraRed, and Short Wave-InfraRed), multi-resolution (42 to 318 m) imaging instruments.
The first satellite; EOS-03 (aka GISAT-1) was launched on 12 August 2021 but failed to reach orbit as cryogenic upper stage of GSLV could not ignite. EOS-3 was supposed to fulfil civilian applications. The second satellite, EOS-05 (aka GISAT-2) will be acquired by Indian Navy and will differ slightly in capabilities compared to EOS-03 (aka GISAT-1).

GISATs will image in multi-spectral and hyper-spectral bands to provide near real-time pictures of large areas of the country, under cloud-free conditions, at frequent intervals which is, selected field image in every 5 minutes and entire Indian landmass image every 30 minutes at 42 m spatial resolution.
Features of GISAT-1 are:
| Band | Channels | Ground Resolution(m) | Range(μm) |
|---|---|---|---|
| Multispectral (VNIR) | 6 | 42 | 0.45 – 0.875 |
| Hyperspectral (VNIR) | 158 | 318 | 0.375 – 1.0 |
| Hyperspectral (SWIR) | 256 | 191 | 0.9 – 2.5 |
| Designation | COSPAR ID | NORAD ID | Power | Launch | Orbital parameters | Remarks | ||||
|---|---|---|---|---|---|---|---|---|---|---|
| Launch date, Time (UTC) | Launch mass | Launch vehicle | Launch site | Orbit | Longitude | |||||
| EOS-03 (GISAT-1) |
Failed to orbit | 2280 watts | 12 August 2021, 00:13 UTC |
2268 kg | GSLV-F10 | SDSC | GTO | 85.5° East (planned) | ||
| EOS-05 (GISAT-1A) |
2026-202A | 100607 | 2280 watts | 3 September 2026, 21:25 UTC | 2367 kg | GSLV-F17 | SDSC | GTO | ||
| GISAT-2 | TBD | TBD | 2280 watts | 2027 (planned) | 2268 kg | SDSC | GTO | |||