GISAT-1A in the clean room before encapsulation | |
| Names | EOS-05 / GISAT-1A |
|---|---|
| Mission type | Earth observation |
| Operator | ISRO |
| COSPAR ID | 2026-202A |
| SATCAT no. | 100607 |
| Website | https://www.isro.gov.in/Mission_GSLVF17.html |
| Spacecraft properties | |
| Spacecraft | GISAT |
| Bus | I-2K |
| Manufacturer | ISRO |
| Launch mass | 2,367 kg (5,218 lb) |
| Start of mission | |
| Launch date | 3 September 2026, 21:25 UTC |
| Rocket | GSLV Mk II (F17) |
| Launch site | Satish Dhawan Space Centre, SLP |
| Contractor | ISRO |
| Orbital parameters | |
| Reference system | Geocentric orbit |
| Regime | Geosynchronous orbit |
EOS-05 (also known as GISAT-1A) is an Indian Earth observation satellite. It is the second satellite in the GISAT series produced by ISRO. The satellite aims to improve the existing remote sensing capabilities.

GISATs image in multi-spectral and hyper-spectral bands to provide near real-time pictures of large areas of India, under cloud-free conditions, at frequent intervals which is, selected field image in every 5 minutes and entire Indian landmass image every 30 minutes at 42 metres (138 ft) spatial resolution.
These near real-time observations serve for monitoring of natural disasters like cyclones, floods, cloudbursts, and forest fires, as well as for agricultural assessment and security surveillance.
| Band | Channels | Ground Resolution(m) | Range(μm) |
|---|---|---|---|
| Multispectral (VNIR) | 6 | 42 | 0.45 – 0.875 |
| Hyperspectral (VNIR) | 158 | 318 | 0.375 – 1.0 |
| Hyperspectral (SWIR) | 256 | 191 | 0.9 – 2.5 |
GISAT-1A was launched from Launchpad 2 of the Satish Dhawan Space Centre aboard the GSLV-F17 mission at 2:55 am IST on 4 September 2026. The satellite was placed at the intended Sub-Geosynchronous Transfer Orbit (Sub-GTO) about 18 minutes after lift-off. At 2,637 kg, the satellite is the heaviest satellite launched by GSLV.
On 5 and 6 September, the satellite fired its Liquid Apogee Motor (LAM) engine twice for 5,406.4 seconds (about 90 minutes) until 8:19 pm IST and 5 minutes to reach orbits at 20,000 km × 31,129 km and 35,786 km, respectively. The satellite was originally present at an altitude of 171 km.
On 7 September, the third and final orbit raising manoeuvre to reach its intended geosynchronous orbit with altitudes ranging between 34,903 km × 35,884 km. The LAM engine fired for 1247 seconds until 8:47 pm IST. The health and systems of the satellite will be monitored for the next few days after which the imaging systems will be activated.