EOS-05

GISAT-1A
GISAT-1A in the clean room before encapsulation
NamesEOS-05 / GISAT-1A
Mission typeEarth observation
OperatorISRO
COSPAR ID2026-202A Edit this at Wikidata
SATCAT no.100607Edit this on Wikidata
Websitehttps://www.isro.gov.in/Mission_GSLVF17.html
Spacecraft properties
SpacecraftGISAT
BusI-2K
ManufacturerISRO
Launch mass2,367 kg (5,218 lb)
Start of mission
Launch date3 September 2026, 21:25 UTC
RocketGSLV Mk II (F17)
Launch siteSatish Dhawan Space Centre, SLP
ContractorISRO
Orbital parameters
Reference systemGeocentric orbit
RegimeGeosynchronous orbit
← EOS-04
EOS-06 →
GISAT-2 →

EOS-05 (also known as GISAT-1A) is an Indian Earth observation satellite. It is the second satellite in the GISAT series produced by ISRO. The satellite aims to improve the existing remote sensing capabilities.

GISAT-1A in deployed configuration

Objectives

GISATs image in multi-spectral and hyper-spectral bands to provide near real-time pictures of large areas of India, under cloud-free conditions, at frequent intervals which is, selected field image in every 5 minutes and entire Indian landmass image every 30 minutes at 42 metres (138 ft) spatial resolution.

These near real-time observations serve for monitoring of natural disasters like cyclones, floods, cloudbursts, and forest fires, as well as for agricultural assessment and security surveillance.

Instruments

Imaging capabilities of GISAT-1A
Band Channels Ground Resolution(m) Range(μm)
Multispectral (VNIR) 6 42 0.45 – 0.875
Hyperspectral (VNIR) 158 318 0.375 – 1.0
Hyperspectral (SWIR) 256 191 0.9 – 2.5

Launch

GISAT-1A was launched from Launchpad 2 of the Satish Dhawan Space Centre aboard the GSLV-F17 mission at 2:55 am IST on 4 September 2026. The satellite was placed at the intended Sub-Geosynchronous Transfer Orbit (Sub-GTO) about 18 minutes after lift-off. At 2,637 kg, the satellite is the heaviest satellite launched by GSLV.

On 5 and 6 September, the satellite fired its Liquid Apogee Motor (LAM) engine twice for 5,406.4 seconds (about 90 minutes) until 8:19 pm IST and 5 minutes to reach orbits at 20,000 km × 31,129 km and 35,786 km, respectively. The satellite was originally present at an altitude of 171 km.

On 7 September, the third and final orbit raising manoeuvre to reach its intended geosynchronous orbit with altitudes ranging between 34,903 km × 35,884 km. The LAM engine fired for 1247 seconds until 8:47 pm IST. The health and systems of the satellite will be monitored for the next few days after which the imaging systems will be activated.