Great Train eXpress

Great Train eXpress (GTX) is a higher-speed commuter rail network in the Seoul Metropolitan Area project consisting of three separate lines, named GTX-A, GTX-B and GTX-C, and scheduled for completion in 2030. Three other lines, named GTX-D, GTX-E and GTX-F are being planned.

GTX-A

GTX-A
Great Train eXpress
A GTX-A A000 series EMU
Overview
Native name수도권 광역급행철도 A노선
OwnerGovernment of South Korea
LocaleSeoul
Termini
Stations9
Color on map
  Lilac
Service
TypeCommuter rail
Services2
Operator(s)Great Train eXpress A-Line Operation Co., Ltd.
History
Opened30 March 2024; 2 years ago (2024-03-30)
Technical
Num of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification25 kV/60 Hz
Operating speed
180 km/h (110 mph)

The GTX-A, officially Metropolitan Area Rapid Transit Line A, is a higher-speed commuter railway line operating in two sections in Seoul, South Korea.

Interior of a GTX-A train

Groundbreaking for GTX Line A was held on December 27, 2018, with service initially expected to commence in 2023. However, the project has been officially delayed due to land compensation issues and the discovery of archaeological ruins dating from the Joseon period.

The line currently runs in two separate sections - Dongtan to Suseo and Unjeongjungang to Seoul Station. Suseo, Seongnam, and Dongtan stations were opened on March 30, 2024, with Guseong Station opening later on June 29, 2024. The section between Unjeongjungang and Seoul Station opened on December 28, 2024.

Operation

Approximately 30 km (19 mi) of the line are expected to share the same rail as the SRT, and an additional 9 km (5.6 mi) towards the western end of the route are expected to be completely underground. Trains operate at around three to four services per hour in each direction in the southern section with anywhere between 15 and 30 minutes between services. Meanwhile, the northern section operates at six services per hour per direction with ten minutes between services.

Each GTX-A train has a capacity of 1,090 passengers.

Future plans

The connection between Seoul Station and Suseo is anticipated to open in August 2026. However, in May 2026, it had been discovered that a number of support columns at the fifth basement level at Samseong Station had been constructed inadequately, making the targeted August 2026 opening unlikely.

In addition, Samseong Station has been further delayed, and, as of May 2026, is not scheduled to open until October 2028.

Furthermore, a southern extension of the line from Dongtan to PyeongtaekJije Station had been in the planning stage for approximately one month before the opening of the line's opening.

Current Routes

  • Seoul Station — Unjeongjungang
  • Suseo — Dongtan

Stations

Station

Number

Station name Transfer Line name Distance (km) Total
distance (km)
Location Date Opened
English Hangul
X101 Unjeongjungang 운정중앙 GTX-A — 0.0 Gyeonggi Province Paju 28 December 2024
X102 Kintex 킨텍스 6.7 6.7 Goyang
X103 Daegok 대곡
  • Gyeongui–Jungang Line
  • Seohae Line
6.9 13.6
X104 Changneung 창릉 6.2 19.8 2030
X105 Yeonsinnae 연신내
3.7 (9.9) 23.5 Seoul Eunpyeong 28 December 2024
X106 Seoul Station 서울역
  • Gyeongui–Jungang Line
  • Korail
  • KTX
9.5 33.0 Jung
X107 Samseong 삼성
10.1 43.1 Gangnam April 2028
X108 Suseo 수서
  • Suin–Bundang Line
5.2 (15.3) 48.3 30 March 2024
X109 Seongnam 성남 Gyeonggang Line Suseo–Pyeongtaek HSR (shared) 10.7 59.0 Gyeonggi Province Seongnam
X110 Guseong 구성 Suin–Bundang Line 11.0 70.0 Yongin 29 June 2024
X111 Dongtan 동탄 11.1 81.1 Hwaseong 30 March 2024

GTX-B

Construction of GTX Line B commenced on March 7, 2024. It is planned to be completed by 2030.

Station
number
Station name Transfer Line name Distance Total
distance
Location
English Hangul
TBA Songdo 송도 Incheon Subway Line 1 GTX-B — 0.0 Incheon Yeonsu
Incheon City Hall 인천시청
  • Incheon Subway Line 1
  • Incheon Subway Line 2
— — Namdong
Bupyeong 부평 — — Bupyeong
Bucheon Stadium 부천종합운동장
  • Seohae Line
— — Gyeonggi Bucheon
Sindorim 신도림
— — Seoul Guro
Yeouido 여의도
— — Yeongdeungdo
Yongsan 용산
  • Gyeongui–Jungang Line
  • Korail
  • KTX
— — Yongsan
Seoul Station 서울역
  • Gyeongui–Jungang Line
  • Korail
  • KTX
— — Jung
Cheongnyangni 청량리
  • Gyeongui–Jungang Line
  • Suin–Bundang Line
  • Korail
  • KTX
— — Dongdaemun
Sangbong 상봉
  • Gyeongui–Jungang Line
  • Gyeongchun Line
— — Jungnang
Byeollae 별내
  • Gyeongchun Line
Gyeongchun Line (shared) — — Gyeonggi Namyangju
PyeongnaeHopyeong 평내호평 Gyeongchun Line — —
Maseok 마석 — —

GTX-C

Construction of GTX Line C commenced on January 25, 2024. It is planned to be completed by 2028. According to the latest plans and following the selection of a preferred bidder for the construction of this line, two additional stations, Indeogwon Station and Wangsimni Station are likely to be added to the line. An additional southern extension past Suwon to Cheonan-Asan is also in consideration.

Station
number
Station name Transfer Line name Distance Total
distance
Location
English Hangul
TBA Suwon 수원
  • Suin–Bundang Line
  • KTX
Gyeongbu Line (shared)
Gwacheon Line (shared)
— 0.0 Gyeonggi Suwon
Geumjeong 금정
— — Gunpo
Gwacheon 과천 GTX-C — — Gwacheon
Yangjae 양재
  • Shinbundang Line
— — Seoul Gangnam
Samseong 삼성
— —
Cheongnyangni 청량리
  • Gyeongui–Jungang Line
  • Suin–Bundang Line
  • Korail
  • KTX
— — Dongdaemun
Kwangwoon University 광운대
  • Gyeongchun Line
— — Nowon
Chang-dong 창동
— — Dobong
Uijeongbu 의정부 Gyeongwon Line (shared)
— — Gyeonggi Uijeongbu
Deokjeong 덕정 — — Yangju

Additional plans for other lines

Plans for a Line D were announced in 2021 by the previous government. However, the proposed route faced a lot of opposition, and has not been approved yet. The new government of Yoon Suk-yeol has pledged to build three new lines (Lines D, E and F), for which the routes have not been decided yet, but which would likely include plans for a longer Line D than the one announced by the previous government. Plans for a Line G and H that will expand to the northern and southwestern regions of Gyeonggi Province have also been announced.

Station
number
Station name Transfer Line name Distance Total
distance
Location
English Hangul
TBA Janggi 장기 Gimpo Goldline GTX-D — 0.0 Gyeonggi Gimpo
Geomdan 검단 — Incheon Seo
Gyeyang 계양
  • Incheon Subway Line 1
— — Gyeyang
Daejang 대장 — — Gyeonggi Bucheon
Dangarae 당아래 — —

Criticism

Critics argue that the GTX project would further concentrate social and economic power towards Seoul, leading to increased primacy and the collapse of other provincial cities.