Platform | |||||||||||
| General information | |||||||||||
| Location | Mimar Sinan Neighborhood, Eyüp, Istanbul Turkey | ||||||||||
| Coordinates | 41°7′17″N 28°56′49″E / 41.12139°N 28.94694°E | ||||||||||
| System | Istanbul Metro rapid transit station | ||||||||||
| Owner | Ministry of Transport and Infrastructure | ||||||||||
| Operator | Istanbul Metro | ||||||||||
| Line | |||||||||||
| Platforms | 1 Island platform | ||||||||||
| Tracks | 2 | ||||||||||
| Connections | |||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Depth | 22 metres (72 ft) | ||||||||||
Platform levels | 3 | ||||||||||
| Parking | Yes | ||||||||||
Cycle facilities | Yes | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | 22 January 2023 | ||||||||||
| Electrified | 1,500 V DC Overhead line | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Hasdal (or Hasdal University) is an underground station on the M11 line of the Istanbul Metro in Eyüp. The station was constructed using the cut and cover method.
Construction of the station began in 2016, along with the entire route from Gayrettepe to the Istanbul Airport. The station was opened on 22 January 2023.
It is located on the
D.020 highway in the Eyüpsultan district’s Mimar Sinan neighborhood in Istanbul.
| Northbound | ← | |
| Island platform, doors will open on the left | ||
| Southbound | ||
The line operates between 06:00 and 00:40 and train frequency is 20 minutes. The line has no night service.