| Dulwich Hill Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A CAF Urbos 3 at Marion in 2014 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Other name | Inner West Light Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Owner | Transport for NSW | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Locale | Sydney, New South Wales, Australia | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stations | 23 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Type | Light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| System | Sydney light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operator | Transdev Sydney | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Depot(s) | Pyrmont, Lilyfield | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Ridership | 8,502,709 (2025) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Work began | January 1996 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opened |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 12.8 km (8.0 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Num of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Character | Street running, ground level, underground and elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Electrification | 750 V DC from overhead lines | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (50 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Inner West Light Rail, also known as the L1 Dulwich Hill Line, is a light rail line in Sydney, New South Wales, Australia, running from Central station through the Inner West to Dulwich Hill station. Operated by Transdev Sydney under contract to Transport for NSW, the line is 12.8 kilometres (8.0 mi) long and has twenty-three stops. Most of the line follows the former Rozelle–Darling Harbour Goods Line, while there is a small street-running portion in Sydney's central business district.
In 1994, the Sydney Light Rail Company was awarded a contract to build and operate the line for 30.5 years. The first section, 3.6 kilometres (2.2 mi) from Central to Wentworth Park in Pyrmont with ten stops, opened on 11 August 1997. A 3-kilometre (2 mi), four-stop extension to Lilyfield opened on 13 August 2000. Following the closure of the remaining section of the goods line in 2009, planning commenced for an extension to Dulwich Hill. In 2012, the state government acquired Metro Transport Sydney, the line's private operator, and construction of the extension began soon thereafter. The nine-station, 5.5-kilometre (3.4 mi) extension opened on 27 March 2014.
The line initially operated with seven Adtranz Variotram vehicles. From 2014, twelve CAF Urbos 3 trams were introduced, which allowed for the withdrawal of the Variotrams from service. Four additional Urbos 3 trams were ordered in 2021. Due to cracking in the Urbos 3 bogies, the Inner West Light Rail was temporarily closed from October 2021; it reopened in February 2022 using Alstom Citadis trams transferred from the CBD and South East Light Rail; the Urbos 3 trams were repaired later that year. Headways reach as low as six minutes during peak periods and as high as fifteen minutes at night time. The journey from Central to Dulwich Hill takes 36–37 minutes. Patronage was initially below forecasts but exceeded projections following the opening of the Dulwich Hill extension. In 2025, the line carried 8,502,709 passengers.
In 1916, what is now called the Rozelle–Darling Harbour Goods Line opened between Dulwich Hill and Rozelle Bay. It was extended to Darling Harbour in 1922. The rise of containerised freight and the shift of shipping to Port Botany led to a decline in use of the goods line from the 1970s, leading to the line's planned closure starting in the 1990s. Additionally, in 1961, Sydney's original tram network closed.
In 1984, the government of New South Wales announced that Darling Harbour would be redeveloped. The government subsequently sought proposals for transport links to the area. Thomas Nationwide Transport (TNT) proposed a monorail, while Transfield and Comeng proposed a light rail line. From Pyrmont, the proposed light rail line would have crossed Pyrmont Bridge before branching towards Central station and Circular Quay via Hickson Road and Sussex Street. The National Trust, public transport advocates, environmental groups, and the minister for planning and environment, Bob Carr, supported the light rail proposal, but the minister for public works, Laurie Brereton, supported the monorail. The monorail proposal was selected, and the system opened in 1988.
In 1992, the state and federal governments reached an agreement under the federal government's Building Better Cities program to redevelop the Ultimo–Pyrmont area, a former industrial area to the west of Sydney's central business district (CBD). As part of the agreement, the state and federal governments would fund a light rail line from Central station to Pyrmont via Ultimo, using the goods line as a right of way. The line was intended to support the redevelopment of Pyrmont and Ultimo and serve attractions including the Sydney Entertainment Centre, Darling Harbour, the Powerhouse Museum, the Australian National Maritime Museum, the Sydney Fish Market, and the future Star Casino.
The line was built and operated under a build–own–operate–transfer (BOOT) contract. The state government called for expressions of interest in July 1993; nine consortia submitted expressions of interest, four of which were shortlisted in November 1993. The Sydney Light Rail Company (SLRC) was awarded the contract in June 1994. The SLRC consortium comprised the Australian Industry Development Corporation, GHD Transmark, ABB and TNT, which provided financing, project management, rolling stock and operations, respectively.
Under the BOOT contract, the SLRC would own and operate the light rail line for a 30.5 year concession period, set its own fares and receive most fare revenue. The government was prohibited from operating any competing public transport services to the Pyrmont–Ultimo area without consulting the SLRC, and the SLRC was given right of first refusal for any interconnecting light rail lines, including extensions further along the goods line and into the CBD. The capital cost of the line was $87.5 million, of which $21.5 million was provided to the SLRC by the state and federal governments and the remainder financed by the consortium; an additional $3.5 million was spent by the two governments on project management and feasibility studies.

The goods line closed in January 1996, and preliminary construction work began that month with the removal of its timber sleepers. A ceremony to mark the start of construction took place on 25 January. The 3.6-kilometre (2.2 mi) line opened between Central and Wentworth Park on 11 August 1997. Initially, services operated between 9 am and 5 pm at twelve minute headways because the full tram fleet had not yet been delivered. Premier Bob Carr officially opened the line on 31 August 1997, with celebrations that included fireworks. Full service commenced the following day, which included headways as low as 51⁄2 minutes during peak hour and a service span of 6 am to midnight.
An August 1995 feasibility study found that extending the line from Wentworth Park to Marion was viable. In May 1997, State Cabinet gave in-principle support to extending the light rail line to Lilyfield in the west and Circular Quay in the CBD. An environmental impact statement for the two extensions was published in October 1997. In November 1998, the state government approved the 3-kilometre (2 mi), $20 million extension to Lilyfield. The state government contributed $16 million, with the SLRC financing the remaining $4 million. There were four new stops: Glebe, Jubilee Park, Rozelle Bay and Lilyfield. A decision on the proposed CBD extension was deferred. The contract between the state government and the SLRC was finalised in December 1999; construction began on 14 December. The extension opened on time on 13 August 2000.
In 2007, the last remaining user of the freight line, Allied Mills in Summer Hill, was sold to a property developer, allowing the line to close in 2009. Following Kristina Keneally becoming the premier of New South Wales in late 2009, she cancelled plans to build a Sydney Metro in February 2010. Extensions of the Inner West line at both ends, to Dulwich Hill station and through the CBD to Circular Quay, were announced as some of the projects that would be built instead of the metro. The combined cost of the two extensions was estimated to be $500 million. The locations of the stops along the extension to Dulwich Hill were announced in July 2010. In 2012, the new Liberal government incorporated the extension to Circular Quay into the new CBD and South East Light Rail line instead of the Inner West line.
There were two major impediments to the Dulwich Hill extension: a cost blowout and the BOOT contract. The GreenWay, a proposed walking and cycling corridor from Iron Cove to the Cooks River, was planned to run alongside the light rail extension, but the cost of both the extension and the GreenWay had blown out and the GreenWay complicated the construction of the light rail extension. The GreenWay had gone from costing $30 million to $37 million in 2011, and the light rail extension had gone from $120 million to $176 million. In September 2011, Transport Minister Gladys Berejiklian cancelled the GreenWay to make up the budget shortfall, and postponed the completion of the extension by eighteen months to early 2014. Under the BOOT contract, the operator, now known as Metro Transport Sydney (MTS), had the exclusive right to the extension to Dulwich Hill. MTS would have financed and constructed the extension, with the government repaying the cost over the concession's remaining thirteen years. In March 2012, the state government acquired MTS for $19.8 million, which the government said would make extending the light rail line easier. It was also announced that the monorail would be shut down.

In May 2012, the design and construction contract for the 5.5-kilometre (3.4 mi) extension was awarded to John Holland. Critics questioned the extension's cost and construction schedule because the tracks from the goods line were still in place. Designs for the new stops were released for public consultation in October 2012. Construction began in November 2012. Work involved installing overhead wiring, strengthening embankments, building platforms, installing lifts for some stops, and raising the bridge over Parramatta Road. By February 2014, construction was complete and track testing had begun. The extension was opened on 27 March 2014 by Premier Barry O'Farrell and Transport Minister Berejiklian.

A maintenance depot serving both light rail lines was constructed at Lilyfield as part of the CBD and South East Light Rail project. Construction began in May 2017 and was completed by early 2019. The first phase of the CBD and South East Light Rail line opened in December 2019, providing an interchange with the Inner West Light Rail at Central station. The second phase opened in April 2020.
The GreenWay project resumed following a $14 million funding commitment from the state government and Inner West Council in 2016. The state government allocated an additional $9.8 million towards the GreenWay in 2022. The GreenWay opened in December 2025.
The Fish Market stop was renamed Bank Street in January 2026, coinciding with the opening of the new Sydney Fish Market, which is closer to Wentworth Park stop.
The Inner West Light Rail uses 1,435 mm (4 ft 8+1⁄2 in) standard gauge track. Trams are powered by 750 V DC overhead lines. Off-street tracks use fixed-block signalling with track circuits. On-street tracks operate by line-of-sight. The maximum permitted speed is 80 kilometres per hour (50 mph) on off-street sections and 20 kilometres per hour (12 mph) on the street-running section. Automatic train protection is used.
The Inner West Light Rail begins at Central station's grand concourse, which formerly served as a terminus for Sydney's original tram network. The line loops around Belmore Park before running west along Hay Street for 700 metres (2,300 ft). It then enters the former goods railway corridor, which it follows for the remainder of the route. The route passes through the heritage-listed Pyrmont and Glebe tunnels, constructed between 1916 and 1922. The longer of the two, the Glebe tunnel, is 800 metres (2,600 ft) long and passes under the residential area of Glebe. There are also the Glebe and Wentworth Park viaducts, which are brick arch viaducts that are 446.5 metres (1,465 ft) and 274 metres (899 ft) long respectively. They are the two longest brick viaducts in New South Wales. The line has two depots: the original depot at Darling Harbour and a maintenance facility at Lilyfield, built on the former Rozelle Yard. At Dulwich Hill station, the line interchanges with the Metro North West & Bankstown Line. The line has a total length of 12.8 kilometres (8.0 mi).
Every stop is fully accessible, with level boarding, ramps, and a lift at some stops. Platforms are 30 metres (98 ft) long.
| Stop | Image | Location | Opened | Connections and notes |
|---|---|---|---|---|
| Central Grand Concourse | Sydney CBD | 11 August 1997 | ||
| Capitol Square | Haymarket | |||
| Paddy's Markets | ||||
| Exhibition Centre | Sydney CBD | |||
| Convention | ||||
| Pyrmont Bay | Pyrmont | |||
| The Star | ||||
| John Street Square | ||||
| Bank Street | Known as Fish Market before 2026. | |||
| Wentworth Park | ||||
| Glebe | Glebe | 13 August 2000 | ||
| Jubilee Park | ||||
| Rozelle Bay | Annandale | |||
| Lilyfield | Lilyfield | |||
| Leichhardt North | 27 March 2014 | |||
| Hawthorne | Leichhardt | |||
| Marion | ||||
| Taverners Hill | ||||
| Lewisham West | Lewisham | |||
| Waratah Mills | Dulwich Hill | |||
| Arlington | ||||
| Dulwich Grove | ||||
| Dulwich Hill |
Services operate at six-minute intervals during weekday peaks and daytime weekends, with intervals increasing to fifteen minutes early in the morning and late at night. The end-to-end travel time is 36 to 37 minutes. Services commence at 5:00 am and end at 1:37 am each day. In 2017, The Sydney Morning Herald reported that the single-track terminus at Dulwich Hill prevented services from operating more frequently than every eight minutes. Despite this earlier assessment, peak-hour intervals were reduced to six minutes in January 2024. Duplicating the terminus is still proposed to increase frequency and reliability.
Since 1998, the Inner West Light Rail has been operated by Transdev Sydney (formerly Veolia Transport Sydney and Connex) under various arrangements. Initially, the company was contracted by the Sydney Light Rail Company (later Metro Transport Sydney) to operate the line after it bought out TNT's light rail and monorail operations. From July 2013 to mid-2015, after Metro Transport Sydney was acquired, the line was operated by Transdev under a $45 million contract. Since July 2015, the line has been operated by Transdev as part of the ALTRAC Consortium, the consortium which was to build and operate the CBD and South East Light Rail.

The line initially had a separate ticketing system from the rest of Sydney's public transport network. In June 2011, MyMulti tickets, pensioner excursion tickets, and Family Funday Sunday tickets, which were previously introduced to the rest of the public transport system, were allowed on the line. Metro Transport Sydney retained its existing fare structure, under which fares were substantially higher than those on other public transport services. The state government's acquisition of Metro Transport Sydney in March 2012 made integrating the light rail ticketing system easier. The smartcard-based Opal ticketing system was introduced to the line on 1 December 2014. The Opal system had a different fare structure than the paper tickets. Paper tickets were fully withdrawn on 1 August 2016.

Seven Variotrams, manufactured by Adtranz (formerly ABB) at the Dandenong rolling stock factory in Melbourne for $25 million, entered service in 1997 as the original rolling stock on the line. Each tram was 28 metres (92 ft) long and featured a fully low-floor design.


In August 2012, a contract was awarded to CAF for the delivery of six new Urbos 3 trams and the lease of four Urbos 2 trams for $20 million for the Dulwich Hill extension. Three of the leased trams came from the defunct Vélez-Málaga Tram in Spain. In October 2013, six additional Urbos 3 trams were ordered for $19 million, allowing for the retirement of the Variotrams. The first Urbos 3 tram arrived in Sydney in December 2013. All four leased Urbos 2 trams had entered service by the time the Dulwich Hill extension opened. The first six Urbos 3 trams entered service in July and August 2014, allowing the Urbos 2 trams to be withdrawn. By 2015, the remaining six Urbos 3 trams were in service and the Variotrams were withdrawn and sold off. By 2018, Transport for NSW was considering acquiring four additional trams to ease overcrowding and lower peak headways from eight minutes to six minutes. In June 2021, a $25 million contract was awarded to CAF for the delivery of the four trams. These trams entered service in the second half of 2023.
The line was closed for several weeks following two derailments near Rozelle Bay and Wentworth Park on 7 October 2013. The line reopened between The Star and Lilyfield on 18 October and for the full length on 30 October. They were the first derailments in the line's history. An investigation attributed the derailments to excessive wheel wear caused by newly replaced track, with inadequate rail lubrication also contributing.
In late September 2021, cracks were discovered in the underframe rotation bump stops of several Urbos 3 trams. After further inspections of two trams, cracking was discovered in each bogie box area, which led to the withdrawal of all Urbos 3 trams from service for inspection in late October. Similar cracking had appeared in Urbos 3 vehicles used by the West Midlands Metro in England 22 months prior, and CAF had notified Transport for NSW and ALTRAC three months prior, but CAF told them that additional inspections were not necessary if the vehicles were operated and maintained according to their design. After the inspections, the cracking was discovered in all twelve trams, prompting Transport Minister Rob Stokes to announce that the line could remain closed for up to eighteen months.
In February 2022, services resumed using six Alstom Citadis trams transferred from the CBD and South East Light Rail. Originally planned to run a limited frequency between Central and Lilyfield using four Citadis trams, it was instead decided that the whole line would operate with a reduced frequency. Reduced patronage on the CBD and South East Light Rail during the COVID-19 pandemic allowed six Citadis trams to be reassigned to the Inner West line. Minor modifications to the trams, track and platforms were made, including rubber gap fillers on the platforms because the Citadis trams are narrower than the Urbos trams, lower speed limits, and a different wheel profile. Supplemental bus services from Central to The Star and additional ferry services operated too. From August 2022, the Urbos 3 trams were re-entered into service between Central and Lilyfield. Infrastructure modifications in October 2022 enabled Urbos 3 and Citadis trams to operate simultaneously between Lilyfield and Dulwich Hill. All twelve Urbos 3 trams were planned to be operational by late November 2022.
An interim report on the cracking by the Office of Transport Safety Investigations was released in October 2022 and the final report was released in August 2025. The report did not conclusively determine the cause. Transport for NSW blamed weaknesses in welds, whereas CAF blamed collisions between the bogie and underframe caused by excessive speed around tight curves and no transition curves into tight curves.
Initial patronage after opening in 1997 was lower than expected, due to a 20-kilometre-per-hour (12 mph) speed limit on city streets instituted by the City of Sydney, high ticket prices, and a lack of transit signal priority. The opening of the Star City Casino in November 1997 doubled patronage, which was by then about half of what was forecast. Before the Dulwich Hill extension opened, the Inner West Light Rail received about four million passengers per year. A 2010 forecast projected that the Dulwich Hill extension would increase patronage to 7.2 million per year in 2016 and 9.6 million per year in 2026. In 2013, it was estimated that patronage had doubled since the 2011 ticketing changes had taken effect. The opening of the extension to Dulwich Hill led to a surge in patronage, reaching 6.1 million passengers in the 2014–15 financial year. The 2015–16 financial year recorded 9.73 million passengers, well above forecasts, meaning the line was overcrowded during peak periods. A high of almost ten million passengers was reached in 2019. Patronage fell sharply during the COVID-19 pandemic, although the decline was smaller than that experienced by Sydney Trains. The closure of the Bankstown railway line in 2024 for conversion to Sydney Metro boosted patronage on the light rail, especially on weekends. As of 2025, the Inner West Light Rail has an annual patronage of 8,499,867.
| Year | Patronage | ±% |
|---|---|---|
| 2016 | 4,635,351 | — |
| 2017 | 9,527,898 | — |
| 2018 | 9,438,873 | −0.93% |
| 2019 | 9,974,417 | +5.67% |
| 2020 | 4,646,067 | −53.42% |
| 2021 | 3,159,377 | −32.00% |
| 2022 | 4,461,077 | +41.20% |
| 2023 | 6,832,157 | +53.15% |
| 2024 | 8,062,294 | +18.01% |
| 2025 | 8,502,709 | +5.46% |