LGV Sud Europe Atlantique

LGV Sud Europe Atlantique
The LGV Sud Europe Atlantique near Pliboux, Deux-Sèvres
Overview
StatusOperational
OwnerSNCF
LocaleNouvelle-Aquitaine and Occitanie,
France
Termini
Service
SystemSNCF
OperatorSNCF
History
Opened2 July 2017
Technical
Line length340 km (210 mi):
302 km (188 mi) (newly built)
+ 38 km (24 mi) (connection to existing network)
Num of tracksDouble track
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz
Operating speed
320 km/h (200 mph)
SignallingTVM 430 / ETCS Level 2
LGV Sud Europe Atlantique route map
TGV lines in France, with the LGV Sud Europe Atlantique in ochre.

The LGV Sud Europe Atlantique (LGV SEA; 'Atlantic Europe Southern High Speed Railway), also known as the LGV Sud-Ouest or officially named LGV L'Océane by SNCF since April 2016, is a high-speed railway line between the cities of Tours and Bordeaux in France. It is used by TGV inOui and Ouigo trains operated by SNCF. It is an extension of the southern arm of the LGV Atlantique, with the western extension being LGV Bretagne-Pays de la Loire. Both extensions to the high-speed line were inaugurated on 28 February 2017, with services beginning on 2 July 2017. The line, which was at the time the largest European railway construction project, was built by the LISEA consortium, which owns and maintains the line until 2061 and charges tolls to train companies. Trains on this line depart Paris from Gare Montparnasse.

With trains operating at speeds of up to 320 km/h (200 mph), the line allows travelers to connect Paris to Bordeaux in approximately two hours, representing a time saving of nearly one hour compared to the existing low-speed line. Extensions from Bordeaux to Spain (LGV Bordeaux-Espagne) and to Toulouse (LGV Bordeaux-Toulouse) are under consideration, with preliminary work for the latter having begun in May 2024 and the first service expected in 2032.

The financing, construction, operation, and maintenance of this line were conceded to a private company, LISEA, for a period from 2011 to 2061, making it the first high-speed line in France to be built under such a concession model.

Purpose

Project map (English/French)

The LGV SEA brings high-speed rail service to southwestern France and connects the regions of Nouvelle-Aquitaine and Occitanie with the high-speed rail service of Northern Europe, which connects Paris to London, Brussels, Amsterdam and beyond. The trip between Paris and Bordeaux takes around two hours and ten minutes at a top speed of 320 km/h (199 mph). The inter-city links between Tours, Poitiers, Angoulême, and Bordeaux are also improved, and southwestern France is better connected to various parts of the country and to the rest of Europe. Trains on this line depart Paris from Gare Montparnasse

The project is also a response to the heavy traffic on the existing rail line. Train tracks are most efficiently used when all trains circulate at the same speed and have identical stops. The large speed difference between the fast TGV trains, which circulated on the existing tracks at speeds up to 220 km/h (137 mph), and the slower freight trains and TER (regional) trains, which shared the same track, caused the interval between these trains to increase greatly. This congested the tracks and prevented their most efficient usage.

Dedicated tracks for the TGV therefore leave space on the existing tracks for many more freight and TER trains than just the number of removed TGV trains. New regional TER services became possible, and could ease services that are currently crowded. The increase in freight trains on the existing track would ease truck traffic on the roads in the régions, as trains transport more and more goods, easing the impact on the environment as well. TER traffic in Nouvelle-Aquitaine increased by 10% in 2018, demonstrating the positive impact of the high-speed line on the regional network.

The use of a concession contract also made it possible, in a constrained financial context, to respond to President Nicolas Sarkozy's desire to launch four high-speed line projects simultaneously (Sud Europe Atlantique, Nîmes-Montpellier bypass, Bretagne-Pays de la Loire, and East European LGV). Private financing helped limit public investment (51% for SEA, compared to an average of 75% for other railway partnership markets).

The project was also sold as benefiting the economy. The construction of Phase 1 created 10,000 construction jobs for five years. Jobs in the transport, commerce, and service sectors were created as well. Local businesses may their see competitiveness increase as their markets expand, and tourism to the region may increase as well.

This route supplements – and partly supersedes – the classic Paris–Bordeaux railway line.

Details

The line was built by consortium LISEA consisting of Vinci Concessions - 33.4%, Caisse des dépôts et consignations - 25.4%, Meridiam - 22.0% and Ardian (formerly Axa Private Equity) - 19.2%. The consortium will operate and maintain the line until 2061, and charges tolls to train companies. The consortium invested €3.8 billion, French government, local authorities and the European Union paid €3 billion and €1 billion was contributed by SNCF Réseau (subsidiary of SNCF). Another €1.2 billion was spent by SNCF Réseau on the construction of interconnecting lines, control centres, capacity enhancements at Bordeaux and remodelling the track layout at Gare Montparnasse.

The total cost of the line was €7.7 billion. Due to the choice of a concession model to finance, build and operate the line, SNCF initially feared that the toll costs for using the line would be higher than for other French high-speed lines. To limit this cost, SNCF considered in 2015 operating trains with greater capacity but reduced frequency. For the same reason, the use of the LGV by Ouigo trains was not initially planned, as the toll cost would be incompatible with the low-cost model of this service. A tug-of-war took place in 2015 between LISEA and SNCF, with the private company requesting 19 services to ensure the profitability of the line against 15 for SNCF. However, SNCF seems to have conceded on all points, as the service offered in July 2017 included 18.5 services and the Ouigo offer uses the entire LGV.

The new high-speed route bypasses Libourne, shortening the total distance traveled compared to the existing route. No new stations were built between Saint-Pierre-des-Corps and Bordeaux, and service to Châtellerault, Poitiers and Angoulême uses their existing train stations, which new connections link to the high-speed rails. South of Poitiers, a connection allows trains to access the old tracks towards La Rochelle.

The journey between Tours and Bordeaux is shortened by around 50 minutes, for a typical Paris-Bordeaux journey time of 2 hours and 3 minutes. 302 km (188 mi) of high-speed track was built together with a further 38 km (24 mi) of conventional tracks that connect to the LGV. The line increased annual ridership by about 3.8% after opening, exceeding the 2.6% to 3.5% predicted at the time of the declaration of public utility.

Journey times

The planned journey times compared to pre-LGV times:

Journey20072017 (planned)2017 (actual)
Paris-Bordeaux3h 00m2h 04m2h 04m
Paris-Poitiers1h 26m1h 17m1h 18m
Paris-Angoulême2h 05m1h 40m1h 43m
Paris-La Rochelle2h 50m2h 27m2h 26m
Paris-Toulouse4h 56m4h 03m4h 08m
Bordeaux-Angoulême0h 52m0h 35m0h 35m
Poitiers-Bordeaux1h 32m0h 55m1h 03m
Poitiers-Angoulême0h 44m0h 37m0h 37m
Poitiers-Tours0h 47m0h 30m0h 29m
Tours-Angoulême1h 32m1h 07m0h 57m
Tours-Bordeaux2h 30m1h 30m1h 38m

Phases

Phases 1/2: Tours–Bordeaux

In that initial plan, Phase 2 had to be completed on a rapid schedule to cope with the increase in traffic expected after the opening of Phase 1. For this reason, the French government announced additional funding in February 2009 to build Phases 1 and 2 together. Construction began in early 2012, and the line opened in 2017.

Phase 3: Bordeaux – Toulouse and Spanish border

  • Proposed, not currently decided
  • 2004–2005: Preliminary studies
  • 2006: Public debate

On 30 July 2010, the French government announced that work on the section to the Spanish border was expected to begin before 2020. In 2015 however, a public inquiry rejected the construction of this section due to cost.

The LGV Bordeaux–Toulouse high speed line began preliminary construction in May 2024, with service expected to begin in 2032.

History

TGV Réseau

Ridership

Annual ridership statistics
Year Passengers
2017* ~20,000,000
2018 ~20,000,000
2019 ~20,000,000
2020 ~10,000,000
2021 15,520,000
2022 19,320,000

Environmental impact

The land area used for the 302 km of LGV was set at 4,200 hectares.

References

  1. ↑ "RFF - Map of electrified railway lines" (PDF). Archived from the original (PDF) on 16 May 2016. Retrieved 10 February 2019.
  2. 1 2 3 4 5 6 "Presidential inauguration for LGV Sud Europe Atlantique". Railway Gazette International. Retrieved 27 March 2020.
  3. ↑ "RFF selects Vinci to build Tours – Bordeaux LGV". Railway Gazette International. 30 March 2010. Archived from the original on 22 July 2010. Retrieved 30 March 2010.
  4. ↑ Extra funds will speed up French investment , Railway Gazette International 2009-02-04
  5. ↑ "Tours-Bordeaux HSL: VINCI announces the completion of the infrastructure works in record time - VINCI". www.vinci.com. 7 July 2015. Retrieved 2 November 2026.
  6. ↑ "Tours-Bordeaux High-Speed Rail Project: France - Railway News". railwaynews.net. 2 May 2017. Retrieved 2 November 2026.
  7. ↑ "SNIT makes rail a priority". Railway Gazette International. 30 July 2010. Archived from the original on 9 August 2020. Retrieved 1 August 2010.
  8. ↑ "France rejects TGV extension plans - which could be bad news for". The Independent. Retrieved 21 December 2015.
  9. 1 2 "Tours – Bordeaux concession signed". Railway Gazette International. 17 June 2011.
  10. ↑ "Ouverture de la LGV: "Je suis venu passer la journée à Bordeaux", témoigne un Parisien". www.20minutes.fr (in French). 2 July 2017. Retrieved 2 July 2017.

46°05′23″N 0°07′30″E / 46.0896°N 0.1250°E / 46.0896; 0.1250