Leaside Bridge

Leaside Bridge
(Confederation Bridge)
The Leaside Bridge from the ravine
Coordinates43°41′57″N 79°21′01″W / 43.699065°N 79.350356°W / 43.699065; -79.350356
Carries6 lanes of vehicular traffic, 2 bike lanes and sidewalks for pedestrian traffic
CrossesDon River
LocaleToronto, Ontario, Canada
Other nameEast York-Leaside Viaduct
Maintained byToronto Transportation Services
Characteristics
DesignTruss bridge
Total length1,443 feet (440 m)
Don River Valley and Don Valley Parkway
History
DesignerFrank Barber
OpenedOctober 29, 1927 (1927-10-29)
Statistics
TollNo
Location
Interactive map of Leaside Bridge
(Confederation Bridge)

The Leaside Bridge, formerly the East York Leaside Viaduct, and officially commemorated as the Confederation Bridge, is a truss bridge that spans the Don River in the City of Toronto, Ontario. Carrying six lanes of Millwood Road, it was built to connect the then Town of Leaside, including Thorncliffe Park, to the then Township of East York, and was completed on October 29, 1927. The construction time of only 10 months was record breaking at the time.

History

The Leaside Bridge in 1928

During the 1920s, as the new communities surrounding Toronto grew rapidly, several bridges were constructed to overcome the barrier of the Don Valley. Among these were the Vale of Avoca (St. Clair Avenue east of Yonge Street) and the East York – Leaside Viaduct. The town of Leaside, built by Canadian Northern Railway in the late teens and early 1920s, sought to attract investors and homebuyers. A connection over the Don Valley to the town of Todmorden Mills and on to Toronto would provide this.

Sod was turned in mid-December and active construction began in January 1927 under the direction of bridge designer Frank Barber. The bridge was rapidly assembled throughout the spring and summer, and inaugurated on October 29 as the Confederation Bridge, in honour of the sixtieth anniversary of that event. The tiled mosaic handrail was designed by New York architect Calude Bragdon with tiles supplied by Italian Mosaic and Tile Company.

In the late 1960s, as the first of numerous plans appeared to extend Leslie Street south of Eglinton, plans were initiated to widen the bridge to support six lanes of traffic. The bridge was closed beginning September 16, 1968, and reopened February 8, 1969. Girders were attached to the sides of the bridge to widen the deck to either side and the piers were reinforced on the corners to carry the additional weight. The expanded bridge had guardrail consisting of a concrete barrier topped with a double tubular railing, considerably plainer than the original decorative parapets.

Between 2004 and 2006, the bridge was rehabilitated. The second of two contracts to rehabilitate the bridge was awarded in 2005 and included the restoration of the decorative handrail from the original 1927 design.

Safety Barrier Installation

The Leaside Bridge has been identified by the City of Toronto as a high-risk location for suicide. Concerns regarding suicide incidents at the bridge gained increased attention following the installation of the Luminous Veil, a suicide-prevention barrier on the nearby Bloor Street Viaduct, in 2003.

An article published by The Globe and Mail, titled "The new suicide bridge", documented a case in which an individual travelled to the Leaside Bridge after encountering the partially completed barrier at the Bloor Street Viaduct. The article reported that the individual had initially intended to go to the viaduct but changed plans after finding the barrier under construction, thus boarded a bus to the Leaside Bridge and ended his life there. It also documented concerns among emergency workers that suicide-related incidents were occurring at other locations, including bridges spanning the Don Valley.

The installation of the Luminous Veil prompted research into whether suicide-prevention barriers resulted in the displacement of suicides to other locations. A 2010 study published in the British Medical Journal found that although suicides at the Bloor Street Viaduct declined following the installation of the barrier, the rate of suicides from other bridges in Toronto increased during the first four years after its completion. Subsequent research examining the long-term effects of the Luminous Veil found that its installation was associated with a sustained reduction in suicides from bridges across Toronto, without evidence of long-term displacement to other locations.

On June 16, 2024, a fatal incident involving a person falling from the bridge onto a vehicle travelling on the Don Valley Parkway resulted in the deaths of both the individual who fell and a passenger in the vehicle. The incident renewed calls for protective barriers on the bridge. One year later, the family of the passenger killed by the incident filed a lawsuit against the City of Toronto, alleging that the municipality had failed to install protective barriers despite known safety concerns. The legal action brought renewed attention to the City's responsibility for public safety at the bridge.

In April 2025, Toronto City Council directed municipal staff to investigate options to accelerate the installation of protective barriers and consider interim safety measures. In October 2025, the City's Infrastructure and Environment Committee endorsed proceeding with a competitive procurement process for an interim curved safety fence. The committee also supported further consultation on interim measures and the installation of a permanent barrier as part of the bridge's next major state-of-good-repair project, then scheduled for 2037.

In June 2026, CityNews reported that construction of the interim safety barrier was expected to begin in July 2026, with completion anticipated by December of that year. The temporary barrier was estimated to cost approximately $2.4 million. The proposed permanent barrier was estimated to cost between $8 million and $9 million and was planned as part of the bridge's major rehabilitation project.

Facts

See also

References

  1. ↑ "Built on Raymond Piles". The Leaside Advertiser. October 29, 1927.
  2. ↑ Rose, Phyllis (1984). "Into the twentieth century — Two Toronto bridges". Canadian Journal of Civil Engineering. 11 (4): 875–883. doi:10.1139/l84-105.
  3. 1 2 3 "Archived copy" (PDF). Archived from the original (PDF) on 2011-06-07. Retrieved 2010-09-30.{{cite web}}: CS1 maint: archived copy as title (link)
  4. ↑ "81 Thorncliffe Park - Transit Toronto - Surface Route Histories".
  5. ↑ http://www.toronto.ca/wes/techservices/involved/transportation/leaside_bridge/pdf/bridge_conditions.pdf Archived 2012-10-03 at the Wayback Machine>
  6. ↑ "Archived copy" (PDF). Archived from the original (PDF) on 2012-10-03. Retrieved 2010-11-26.{{cite web}}: CS1 maint: archived copy as title (link)
  7. ↑ "Safety Barriers Along Leaside Bridge – Implementation Update". City of Toronto. October 29, 2025.
  8. ↑ "The new suicide bridge". The Globe and Mail.
  9. ↑ Sinyor, Mark; Levitt, Anthony J. (2010). "Effect of a barrier at Bloor Street Viaduct on suicide rates in Toronto: natural experiment". BMJ. 341. doi:10.1136/bmj.c2884.
  10. ↑ Sinyor, Mark; Men, Vera Yu; Chan, Prudence Po Ming; Sanchez Morales, Daniel; Levitt, Anthony J.; Schaffer, Ayal (2025). "Long-Term Impact of the Bloor Viaduct Suicide Barrier on Suicides in Toronto: A Time-Series Analysis". The Canadian Journal of Psychiatry. 70 (4): 328–334. doi:10.1177/07067437241293978.
  11. ↑ "Family who lost father in 'preventable tragedy' call for safety barriers on Leaside Bridge". CityNews. April 9, 2025.
  12. ↑ "Family sues city over lack of suicide barriers on Leaside Bridge after dad killed by falling man". Toronto Star. May 9, 2025.
  13. ↑ "Safety Barriers Along Leaside Bridge – Implementation Update". City of Toronto. October 29, 2025.
  14. ↑ Natividad, Erica (June 22, 2026). "Construction to begin next month on Leaside Bridge safety barrier". CityNews.