Line 7 (Changchun Rail Transit)

Line 7
Overview
StatusIn operation (Phase 1)
OwnerChangchun Rail Transit
LocaleChangchun, Jilin, China
Termini
Stations19
Service
TypeRapid transit
SystemChangchun Rail Transit
OperatorChangchun Rail Transit
History
Opened26 August 2026; 2 months ago (2026-08-26)
Technical
Line length23.16 km (14.39 mi) (in operation)
Num of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1,500 V DC overhead catenary contact
Operating speed
80 km/h (50 mph) (Maximum design speed)

Line 7 of the Changchun Rail Transit (Chinese: 长春轨道交通7号线; pinyin: Chángchūn Guǐdào Jiāotōng Qī Hào Xiàn) is a metro line serving Changchun, Jilin, China. The first phase of Line 7 was officially put into operation on 26 August 2026, instead of 30 September 2026 as originally planned.

In the first phase, 20 sets of rolling stock B-type 6 cars will be put into operation.

History

On 12 April 2020, the first phase of Line 7 commenced construction with total investment of 19.1 billion RMB. On 23 December 2025, the entire of Line 7 Phase 1 was fully connected. In July 2026, Line 7 entered trial operation without passengers.

Phase 1 of Line 7 commenced operation at 8:08 am on 26 August 2026.

SegmentCommencementLengthStation(s)Name

Qiche Gongyuan — Donghuanchenglu

26 August 2026 23.16 km (14.39 mi) 19 First Phase

Stations

All 19 stations in operation are underground with an average station distance of 1.2 km (0.75 mi).

The peak interval is about 6 minutes, while off-peak interval is about 7 minutes and 18 seconds.

Station name Transfer Distance

km

Location
English Chinese
Qiche Gongyuan 汽车公园  2  Luyuan
Xihu Dalu 西湖大路
Xing'an Lu 兴安路
Xingshun Lu 兴顺路
Feiyue Guangchang 飞跃广场  6 
Diyi Qiche Zhizaochang 第一汽车制造厂
Mengjiatun 孟家屯  3  Chaoyang
Huinan Jie 辉南街
Nanhu Guangchang (Jida Nanhu Xiaoqu) 南湖广场(吉大南湖校区)  5 
Nanhu Gongyuan 南湖公园
Gongnong Square 工农广场  1  Chaoyang, Nanguan
Shengshuiwuju 省税务局 Nanguan
Dongling Nanjie 东岭南街
Weihai Road 威海路  4 
Saide Guangchang 赛得广场
Huizhan Dajie 会展大街
Zhongdong Dashichang 中东大市场
Lingdong Lu 岭东路 Erdao
Donghuanchenglu 东环城路  2 

References

  1. 1 2 3 "长春轨道交通7号线一期开通运营". 26 August 2026.
  2. ↑ "长春轨道交通7号线一期工程明日开通初期运营,年内将4线齐开". 25 August 2026.
  3. 1 2 3 "长春地铁7号线开通!换乘时间表+各站特色请码住". 26 August 2026.
  4. ↑ "长春地铁7号线开通时间,定了!". 1 March 2025.
  5. 1 2 "长春轨道交通7号线"梳妆打扮"迎开通 七座车站微活动诚邀市民绿色低碳出行". 26 August 2026.
  6. 1 2 "长春地铁7号线19座车站,串联起东风大街,南湖大路和东环城路". 15 June 2026.
  7. ↑ "长春轨道交通7号线今日正式开工!共设站点19座,看看经过你家没?". 12 August 2020.
  8. ↑ "长春轨道交通7号线轨道全线贯通". 24 December 2025.
  9. ↑ "预计年底前通车!长春地铁5、7号线最新进展". 20 July 2026.